• 제목/요약/키워드: Initial investment cost

검색결과 160건 처리시간 0.022초

농수축산물저장을 위한 지하암반냉동창고의 경제성분석 (An Economy Analysis on the Underground Food Storage)

  • 김준홍
    • 산업경영시스템학회지
    • /
    • 제19권38호
    • /
    • pp.189-197
    • /
    • 1996
  • It is in general reported that construction cost in an underground storage facility is less than that of the same capacity and features in an aboveground facility. Since these costs have a derivative with respect to facility size and fridging unit, the cost of construction and fridging unit are sensitive to location of storage, items to store, and rock quality of storage site. In this paper, to analyse an economic investment point for the underground food storage relative to aboveground storage, we compared these two models which have equivalent annual cost with the total cost that consists of initial facility investment cost and annual operation cost. Based on comparison of the economic investment in the underground with aboveground storage. an economic initial investment cost has been suggested for storing the agricultural and fish products.

  • PDF

건축물의 리모델링 가치분석을 위한 평가방법 - 경제성 평가와 사용자 요구분석을 중심으로 - (Evaluation Method for Value Analysis in the Remodelling of Apartment Building - Focused on Economical Efficiency and User Demand -)

  • 정동환;소광호;김천학;김의식;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.103-109
    • /
    • 2002
  • This research is aiming to specify the requirement of the investment such as initial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning rate for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can be defer each other in their implementations. Second, though the remodeling of exist buildings to promote the functions has been applied. no suitable assessment tool has bee developed for deciding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific data bate should be established to apply the suggested economic accession in business enough to forecast the future circumstances. More researches should be promoted on this area continuously as well as the integrated economic evaluation of remodeling on existing building.

  • PDF

건축물 리모델링 사례 분석을 통한 경제성 평가에 관한 연구 (A Study on the Economic Assessment Through Case Study of Remodeling)

  • 김천학;양극영
    • 한국건축시공학회지
    • /
    • 제1권2호
    • /
    • pp.154-164
    • /
    • 2001
  • This research is aiming to specify the requirement of the investment such as intial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can be defer each other in their implementations. Second, though the remodeling of exist building to promote the functions has been applied, no suitable assessment tool has bee developed for deciding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific date base should be established to apply the suggested economic acessments in business enough ti forecast the future circumstances. More researches should be promoted on the area continuously as well as the integrated economic evaluation of remodeling on existing building.

  • PDF

건축물의 리모델링 가치분석을 위한 평가방법 - 경제성 평가와 사용자 요구분석을 중심으로 - (Evaluation Method for Value Analysis in the Remodelling of Apartment Building - Focused on Economical Efficiency and User Demand -)

  • 정동환;소광호;김천학;김의식;양극영
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.123-129
    • /
    • 2002
  • This research is aiming to specify the requirement of the investment such as initial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning rate for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can tie defer each other in their implementations. Second, though the remodeling of exist buildings to promote the functions has been applied. no suitable assessment tool has bee developed for deriding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific data base should be established to apply the suggested economic accession in business enough to forecast the future circumstances. More researches should be promoted on this area continuously as well as the integrated economic evaluation of remodeling on existing building.

LCC분석에 의한 오피스건축물의 최적경제수명추정분석 및 장수명화에 관한 연구 (Forecasting and Prolonging Method of Optimum Economic Life for Office Buildings using Life Cycle Cost)

  • 양봉석;정희철;김경래
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.135-143
    • /
    • 2001
  • 본 연구는 오피스건축물의 최적경제수명을 Life Cycle Cost를 고려하여 추정분석하고, 이를 통해 최적경제수명 이후의 건축물을 어떻게 관리하는 것이 경제적으로 유리한가에 대한 것이다. 경제수명의 추정에서 초기투자비와 유지관리비를 중요한 요소로 고려하여, 여의도$\cdot$마포지역의 오피스건물을 대상으로 조사한 내용을 단위면적 당 동일한 가치로 환산한 뒤, LCC를 이용하여 최적경제수명을 추정하였다. 마지막으로 최적경제수명 이후의 관리방법으로 재건축 및 보수공사 시 투입되는 금액에 따라 5개의 안으로 비교하였다.

  • PDF

원자력발전소 건설 리드타임의 변화가 투자프로젝트 평가에 미치는 효과분석: 발전소 건설비용과 리드타임 간의 상쇄효과분석 (An Effect Analysis of Lead Time Changes on Investment Evaluation of a Nuclear Power Plant Construction : A Trade-Off Analysis Between a Construction Cost and Lead Time)

  • 김규태;이병국;오치재
    • 산업공학
    • /
    • 제12권3호
    • /
    • pp.414-423
    • /
    • 1999
  • A nuclear power plant requires a huge amount of initial investment and long construction lead time. As we expect that there may exist a relationship between investment and construction lead time, a number of researchers have reported that nearly a half of investments is incurred due to time factors such as the time value of money and inflation or escalation rates. Therefore, we investigated in this paper a relationship between the initial investment and the construction lead time of a nuclear power plant construction, and proposed a method for a trade-off analysis between the annual equivalent worth and the investment alternatives to reduce the construction lead time. Finally, we presented a real case to numerically explain the steps of the method presented in this paper.

  • PDF

부산지역 학교 기숙사에서의 소형열병합발전 시스템의 경제성 분석 (Economic Investigation of Small Scale Cogeneration System in a School Dormitory of Busan Region)

  • 송재도;구본철;강율호;박종규;이재근;안영철
    • 설비공학논문집
    • /
    • 제24권9호
    • /
    • pp.657-662
    • /
    • 2012
  • The cogeneration system can operate at efficiencies greater than those achieved when heat and power are produced in separate. The optimal system can be determined by selecting the auxiliary system combined with cogeneration system. In the present study, economic investigation has been conducted with the cogeneration electric heat pump(EHP) system and the cogeneration absorption chiller(AC) system to install in a school dormitory. To analyze life cycle cost(LCC), cost items such as initial investment costs, annual energy costs and maintenance costs of each system have been considered. The initial investment cost is referred to the basis of estimated costs, and annual energy costs such as the electric power and gas consumption are based on the data in a school dormitory. LCC is evaluated with the present worth method. Considering investigated results, the initial investment cost of the cogeneration EHP system is more profitable about 24% than that of the cogeneration AC system. The energy cost of the cogeneration EHP system is more profitable about 8% than the cogeneration AC system. The LCC shows that the cogeneration EHP system is the most effective system in the school dormitory.

서울시내 고등학교 위탁급식의 급식비와 투자비의 실태 및 위탁업체의 기대수준 비교 분석 (The Comparative Analysis of the Present and Expected Level on Meal-Price and Facilities Investment Cost Perceived by Foodservice Managers of Contract-Managed Highschools in Seoul)

  • 배환미;김현아;신서영;조미나;박수연;차진아;이보숙;양일선
    • 한국식생활문화학회지
    • /
    • 제17권5호
    • /
    • pp.578-583
    • /
    • 2002
  • The purposes of this study were to a) find out the operational characteristics of the contract-managed highschool foodservice in Seoul, b) investigate the expected level of meal-price and facilities investment cost perceived by contract-managed highschool foodservice managers c) compare the present level and expected level of meal-price and facilities investment cost. From October 12 to November 13 in 2001, the questionnaires were mailed to 249 high schools which was managed by contract foodservice company with respondent rate 40.2%. Data were analyzed using SPSS Win(10.0) for descriptive analysis and one group paired t-test. The results of this study were as follows ; 1. The student enrollment of highschools run by contract-managed foodservice was 1,243 with 72.6% participation rate of school lunch program. The average meal-price was 2,138 won. The average annual period of school foodservice operation was 156.78 days per year. The average contracting period was about 3 years. 2. The average cost concerned in the facilities investment amounts 169,578,180 won at the initial investment and 25,204,092 won at the repairs and maintenance cost in the course of operation. 3. The present level of meal-price and facilities investment cost were respectively 2,136won/meal and 171,157,336.72 won. And expected level of meal-price and amount of facilities investment cost were 2,418.75 won and 121,353,215.19 won. Comparing the present level with the expected level of the meal- price and facilities investment cost, expected level of meal-price was significantly higher than the present level of meal-price(p<.001) and expected level of facilities investment cost was significantly lower than present level of facilities investment cost(p<.001).

구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석 (Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis)

  • 성도윤;백인수;김재준;함남혁
    • 한국BIM학회 논문집
    • /
    • 제11권3호
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF