• Title/Summary/Keyword: Initial Estimation

Search Result 1,044, Processing Time 0.026 seconds

The Sensitivity Analysis and Safety Evaluations of Cable Stayed Bridges Based on Probabilistic Finite Element Method (확률유한요소해석에 의한 사장교의 민감도 분석 및 안전성 평가)

  • Han, Sung-Ho;Cho, Tae-Jun;Bang, Myung-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.1
    • /
    • pp.141-152
    • /
    • 2007
  • Considering uncertainties of random input data, it is more reasonable to use probabilistic method than the conventional deterministic method for the design of structures or for the assessment of the responses of structures, which are designed as safe even under extreme loads. Therefore, to assess the quantitative effects of the constructed cable stayed bridge by the input random variables, a sensitivity analysis is studied. Using perturbation method, an analysis program is developed for the iterative probabilistic finite element analyses and sensitivity analyses of the cable stayed bridge, except the initial shape analysis. Monte-Carlo Simulations were used for the verification of the developed program. The results of sensitivity analysis shows the governing effects of external loads. Because the results also provide the sensitive effects of the stiffness of members and the magnitudes of prestressing force of cables, the developed

Setting Estimation of Cement Paste Using New-type Embedded Sensor (매입형 센서를 활용한 시멘트 풀의 응결 시간 측정)

  • Shin, Kyung-Joon;Lee, Do-Keun;Seo, Dong-Wan;Yoo, Chul-Min;Lim, Min-Hyuk;Lim, Sung-Hwan
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.4
    • /
    • pp.483-488
    • /
    • 2016
  • The present study proposes an economical embedded ring-sensor that can measure a strain behavior of cement paste and mortar in early age. Using the proposed ring-sensor, the experimental method is proposed that can measure the setting time of the cement paste and mortar conveniently. The experimental study has been conducted using the mixtures of which W/C are 0.30, 0.35, 0.40, and 0.45. From the test result, the setting times measured by convectional test methods such as vicat method and penetration resistance method are compared with the setting time proposed by this study. The result reveals that the proposed ring-sensor can effectively measure the early age behavior so that can evaluate the time when the contraction starts. In addition, the contraction starting time can be regarded as a rational setting time, which is similar to the initial setting of convectional test methods.

Repair Cost Analysis for RC Structure Exposed to Carbonation Considering Log and Normal Distributions of Life Time (탄산화에 노출된 철근콘크리트 구조물의 로그 및 정규 수명분포를 고려한 보수비용 해석)

  • Woo, Sang-In;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.3
    • /
    • pp.153-159
    • /
    • 2018
  • Many researches have been carried out on carbonation, a representative deterioration in underground structure. The carbonation of RC (Reinforced Concrete) structure can cause steel corrosion through pH drop in concrete pore water. However extension of service life in RC structures can be obtained through simple surface protection. Unlike the conventional deterministic maintenance technique, probabilistic technique can consider a variation of service life but it deals with only normal distributions. In the work, life time-probability distributions considering not only normal but also log distributions are induced, and repair cost estimation technique is proposed based on the induced model. The proposed technique can evaluate the repair cost through probabilistic manner regardless of normal or log distribution from initial service life and extended service life with repair. When the extended service life through repair has log distribution, repair cost is effectively reduced. The more reasonable maintenance strategy can be set up though actual determination of life-probability distribution based on long term tests and field investigations.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Estimation of Camera Motion Parameter using Invariant Feature Models (불변 특징모델을 이용한 카메라 동작인수 측정)

  • Cha, Jeong-Hee;Lee, Keun-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.4 s.36
    • /
    • pp.191-201
    • /
    • 2005
  • In this paper, we propose a method to calculate camera motion parameter, which is based on efficient invariant features irrelevant to the camera veiwpoint. As feature information in previous research is variant to camera viewpoint. information content is increased, therefore, extraction of accurate features is difficult. LM(Levenberg-Marquardt) method for camera extrinsic parameter converges on the goat value exactly, but it has also drawback to take long time because of minimization process by small step size. Therefore, in this paper, we propose the extracting method of invariant features to camera viewpoint and two-stage calculation method of camera motion parameter which enhances accuracy and convergent degree by using camera motion parameter by 2D homography to the initial value of LM method. The proposed method are composed of features extraction stage, matching stage and calculation stage of motion parameter. In the experiments, we compare and analyse the proposed method with existing methods by using various indoor images to demonstrate the superiority of the proposed algorithm.

  • PDF

Accuracy Improvement of RTT Measurement on the Alternate Path in SCTP (SCTP에서 대체 경로의 RTT 정확도 향상)

  • Kim, Ye-Na;Park, Woo-Ram;Kim, Jong-Hyuk;Park, Tae-Keun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5B
    • /
    • pp.509-516
    • /
    • 2009
  • The Stream Control Transmission Protocol(SCTP) is a reliable transport layer protocol that provides several features. Multihoming is the one of the features and allows an association(SCTP's term for a connection) between two endpoints to use multiple paths. One of the paths, called a primary path, is used for initial data transmission and in the case of retransmission an alternate path is used. SCTP's current retransmission policy attempts to improve the chance of success by sending all retransmissions to an alternate destination address. However, SCTP's current retransmission policy has been shown to actually degrade performance in many circumstances. It is because that, due to Karn's algorithm, successful retransmissions on the alternate path cannot be used to update RTT(Round-Trip Time) estimation for the alternate path. In this paper we propose a scheme to avoid such performance degradation. We utilize 2bits which is not used in the flag field of DATA and SACK chunks to disambiguate original transmissions from retransmissions and to keep RTT and RTO(Retransmission Time-Out) values more accurate.

Investigation of an Apartment Fire - Site Surveys and Burn Tests for Estimation of the Progress on Initial Fire Spread - (공동주택의 화재조사 - 현장조사 및 연소실험에 의한 초기 화재확대과정 추정 -)

  • Nam, Dong-Gun;Hasemi, Yuji
    • Fire Science and Engineering
    • /
    • v.23 no.4
    • /
    • pp.120-129
    • /
    • 2009
  • Identification of the exact cause of a building fire is generally difficult, because the source and initially ignited objects are often severely damaged or even lost during the early stages of the fire. We made an experimental attempt to reasonably estimate the burning during the very early stages of a fire, and identify its source and causes. The case we studied was an apartment fire, which occurred in Tokyo, in July 2002. The fire was extinguished just after flashover, and the on-site investigations suggested the fire started from the TV and TV stand, which had been damaged so severely that it was difficult to conclude that the TV was the ultimate cause of the fire, simply from the on-site investigation. We conducted a series of burn tests using a TV and other products identical to those actually used in the apartment. Tests were set-up and procedures were carefully studied to recreate the conditions of the articles that remained, and of the room itself. The tests demonstrated that the conditions in the apartment could be recreated only when the fire started inside the TV and came into close contact with dresser.

Adaptive weight approach for stereo matching (적응적 가중치를 이용한 스테레오 정합 기법)

  • Yoon, Hee-Joo;Hwang, Young-Chul;Cha, Eui-Young
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.08a
    • /
    • pp.73-76
    • /
    • 2008
  • We present a area-based method for stereo matching using varying weights. A central problem in a area-based stereo matching is different result from selecting a window size. Most of the previous window-based methods iteratively update windows. However, the iterative methods very sensitive the initial disparity estimation and are computationally expensive. To resolve this problem, we proposed a new function to assign weights to pixels using features. To begin with, we extract features in a given stereo images based on edge. We adjust the weights of the pixels in a given window based on correlation of the stereo images. Then, we match pixels in a given window between the reference and target images of a stereo pair. The proposed method is compared to existing matching strategies using both synthetic and real images. The experimental results show the improved accuracy of the proposed method.

  • PDF

Development of Model Based Battery SOC Indicator for Electric Vehicle (모델기반의 전기자동차용 전지 잔존용량계 개발)

  • Lim, Y.C.;Park, J.G.;Ryoo, Y,J.;Lee, H.S.;Byun, S.C.;Kim, E.S.
    • Journal of Sensor Science and Technology
    • /
    • v.5 no.6
    • /
    • pp.35-42
    • /
    • 1996
  • In this paper, a development of model based battery SOC indicator is described. The proposed method is independent upon initial SOC, is reliable on the sudden change of load, and could estimate the available driving distance. The mathematical model of battery which has relation of the current, voltage and SOC estimates the SOC by least square estimation to minimize the error between measured voltage and estimated voltage. For experiment, the charging and discharging system using computer was designed to acquire the current and voltage data for model. The feasibility in electric vehicle was confirmed by variable load testing using the developed SOC indicator by stand-alone type microcontroller.

  • PDF

Estimation of genetic relationships between growth curve parameters in Guilan sheep

  • Hossein-Zadeh, Navid Ghavi
    • Journal of Animal Science and Technology
    • /
    • v.57 no.5
    • /
    • pp.19.1-19.6
    • /
    • 2015
  • The objective of this study was to estimate variance components and genetic parameters for growth curve parameters in Guilan sheep. Studied traits were parameters of Brody growth model which included A (asymptotic mature weight), B (initial animal weight) and K (maturation rate). The data set and pedigree information used in this study were obtained from the Agricultural Organization of Guilan province (Rasht, Iran) and comprised 8647 growth curve records of lambs from birth to 240 days of age during 1994 to 2014. Marginal posterior distributions of parameters and variance components were estimated using TM program. The Gibbs sampler was run 300000 rounds and the first 60000 rounds were discarded as a burn-in period. Posterior mean estimates of direct heritabilities for A, B and K were 0.39, 0.23 and 0.039, respectively. Estimates of direct genetic correlation between growth curve parameters were 0.57, 0.03 and -0.01 between A-B, A-K and B-K, respectively. Estimates of direct genetic trends for A, B and K were positive and their corresponding values were $0.014{\pm}0.003$ (P < 0.001), $0.0012{\pm}0.0009$ (P > 0.05) and $0.000002{\pm}0.0001$ (P > 0.05), respectively. Residual correlations between growth curve parameters varied form -0.52 (between A-K) to 0.48 (between A-B). Also, phenotypic correlations between growth curve parameters varied form -0.49 (between A-K) to 0.47 (between A-B). The results of this study indicated that improvement of growth curve parameters of Guilan sheep seems feasible in selection programs. It is worthwhile to develop a selection strategy to obtain an appropriate shape of growth curve through changing genetically the parameters of growth model.