• Title/Summary/Keyword: Information breakdown structure

Search Result 188, Processing Time 0.035 seconds

A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure (BIM 기능요소 분류체계 도출에 의한 철도시설공사 BIM 기능발주 구성 방안)

  • Kim, Young-Hwan;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.344-353
    • /
    • 2015
  • Recently, the utilization of the BIM system has been extended to cost and resource simulation, visualized management of construction site information and application of augmented reality including basic 3D modeling. Therefore, various BIM functions are being developed for practical applications. However, since clear classification criteria and knowledge information of BIM functions are not sufficient for field engineers, it is difficult to identify the necessary BIM functions for a construction project. This study suggests a BIM function breakdown structure considering the individual functional properties and a process model that can be ordered by applying BIM in a railway construction project. The proposed delivery model is used to obtain a practical utilization of BIM by analyzing features applicable to railway construction projects; model is verified using a case project.

An Analysis on Cost Factor Reduction of Life Cycle for High Speed Train(KTX-1) Based on the Maintenance Information (유지보수정보를 활용한 고속철도차량(KTX-1) 수명주기비용 요소절감 분석)

  • Kim, Jae-Moon;Kim, Yang-Su;Chang, Chin-Young;Lee, Jong-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2169-2170
    • /
    • 2011
  • This paper presents about the analysis on cost factor reduction using the life cycle cost model for motor block in the KTX-1. Until now, most life cycle cost of the system as a whole that has been studied. but in case of railway industry part, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. Therefore, In this paper presents cost breakdown structure for life cycle cost (LCC) estimation for localization development of propulsion control system (Motor Block) in high speed railway vehicle (KTX-1). Also to analysis LCC on motor block, it was analyzed physical breakdown structure (PBS) and preventive cost on propulsion control system in view of maintenance cost. Based on this, we describe life cycle cost on motor block of KTX-1.

  • PDF

Design of 100-V Super-Junction Trench Power MOSFET with Low On-Resistance

  • Lho, Young-Hwan;Yang, Yil-Suk
    • ETRI Journal
    • /
    • v.34 no.1
    • /
    • pp.134-137
    • /
    • 2012
  • Power metal-oxide semiconductor field-effect transistor (MOSFET) devices are widely used in power electronics applications, such as brushless direct current motors and power modules. For a conventional power MOSFET device such as trench double-diffused MOSFET (TDMOS), there is a tradeoff relationship between specific on-state resistance and breakdown voltage. To overcome the tradeoff relationship, a super-junction (SJ) trench MOSFET (TMOSFET) structure is studied and designed in this letter. The processing conditions are proposed, and studies on the unit cell are performed for optimal design. The structure modeling and the characteristic analyses for doping density, potential distribution, electric field, width, and depth of trench in an SJ TMOSFET are performed and simulated by using of the SILVACO TCAD 2D device simulator, Atlas. As a result, the specific on-state resistance of 1.2 $m{\Omega}-cm^2$ at the class of 100 V and 100 A is successfully optimized in the SJ TMOSFET, which has the better performance than TDMOS in design parameters.

Optimum Design of the Interdigitated CB Structure

  • qiang, Yang-Hong;bi, Chen-Xing
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.2 no.3
    • /
    • pp.233-236
    • /
    • 2002
  • Some measures are provided for the optimum design of specific on-resistance $R_{on}$ and breakdown-voltage $V_B$ of interdigitated CB (Composite Buffer) MOSFET, including introducing opposite type impurity into the P region near the $N_+$contact, separating P region from N region with an oxide film, and a groove in the N region near the $P_+$ contact. The new relationship between the $R_{on}$ and $V_B$, which proved by numerical device simulation, are more exact and minute than the qualitative results before.

A Study on the Development of Life Cycle Cost Analysis Methodology in HVAC system for Decision Maker (의사 결정자를 위한 HVAC 시스템의 LCC 분석 방법론 개발에 관한 연구)

  • Jung, Soon-Sung
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.4
    • /
    • pp.55-63
    • /
    • 2004
  • The purpose of this study is to development of life cycle cost analysis methodology of HVAC system for decision maker. The results of this study are as follows; maintenance/management, equipment construction, planning/design, and demolition/sell phases (1) To develop the cost breakdown structure for LCC in HVAC system, this study apply the method of additional pertinent level, title, CBS number, block number and variable index. (2) LCC analysis order of HVAC system compose four phase. (3) Life cycle costing influence diagram can bring us to make the most efficient decision through a visual graphical diagram that is shown relationship among variables and that decision maker traces easily from life cycle cost analysis situation.

Work Breakdown Structure for advanced urban transit system (차세대 첨단 도시철도시스템 기술개발사업의 업무분류체계(WBS) 구성에 관한 연구)

  • Park Sung-Hyuk;Oh Seh-Chan;Yeo Min-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.921-927
    • /
    • 2005
  • Concurrent engineering is considered in the 21st century product development and H&D. Moreover, advancements in IT and advanced system engineering technology enables to produce high-quality article and shorten the period of R&D. The paper propose work breakdown structure(WBS) based on the product data management(PDM), WEB based system engineering technique, to introduce and operate advanced system engineering technique. We will manage systematically all data produced in advanced urban transit system project based on the proposed WBS. Besides, we provide strategic information for improving efficiency of R&D in advanced urban transit system project. Futhermore, we manage data such as images, design drawings, documents as well as numerical data, and will establish PDM system for sharing the data.

  • PDF

Estimating System for Concrete Bridge using 3D Bridge Information Models (3차원 교량정보모델에 기반한 콘크리트 교량의 견적 시스템)

  • Shim, Chang-Su;Kim, Deok-Won;Lee, Kwang-Myong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.43-44
    • /
    • 2009
  • 3D bridge information models for a concrete box-girder bridge were built and a typical application example for the estimation linked with the 3D models was proposed. 3D geometry objects with PBS (product breakdown structure) were constructed using standard classification codes and 2D drawings. Information on the amount of materials according to the classification codes was utilized for the estimation system. A process for the estimation of concrete and rebars was developed and verified through the pilot test. Optimization of rebar fabrication was suggested as an additional function and was utilized for the cost reduction and standard fabrication.

  • PDF

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

Breakdown Voltage and On-resistance Characteristics of N-channel EDMOS with Dual Work Function Gate (이중 일함수 구조를 적용한 N-채널 EDMOS 소자의 항복전압 및 온-저항 특성)

  • Kim, Min-Sun;Baek, Ki-Ju;Kim, Yeong-Seuk;Na, Kee-Yeol
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.25 no.9
    • /
    • pp.671-676
    • /
    • 2012
  • In this paper, TCAD assessment of 30-V class n-channel EDMOS (extended drain metal-oxide-semiconductor) transistors with DWFG (dual work function gate) structure are described. Gate of the DWFG EDMOS transistor is composed of both p- and n-type doped region on source and drain side. Additionally, lengths of p- and n-type doped gate region are varied while keeping physical channel length. Two-dimensional device structures are generated trough TSUPREM-4 and their electrical characteristics are investigated with MEDICI. The DWFG EDMOS transistor shows improved electrical characteristics than conventional device - i.e. higher transconductance ($g_m$), better drain output current ($I_{ON}$), reduced specific on-resistances ($R_{ON}$) and higher breakdown characteristics ($BV_{DSS}$).

High Breakdown-Voltage AlGaN/GaN High Electron Mobility Transistor having a Trapezoidal Gate Structure (사다리꼴 게이트 구조를 갖는 고내압 AlGaN/GaN HEMT)

  • Kim, Jae-Moo;Kim, Su-Jin;Kim, Dong-Ho;Jung, Kang-MIn;Choi, Hong-Goo;Hahn, Cheol-Koo;Kim, Tae-Geun
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.4
    • /
    • pp.10-14
    • /
    • 2009
  • We propose a trapezoidal gate AlGaN/GaN high electron mobility transistor(HEMT) to improve the breakdown voltage characteristics and its feasibility is investigated by two-dimensional device simulations. The use of a trapezoidal gate structure appears to be quite effective in dispersing the electric fields concentrated near the gate edge on the drain side from the simulation result. We find that a peak value of the electric field along the 2-DEG channel is reduced by 30%, from 4.8 to 3.5 MV/cm and thereby, the breakdown voltage(Vbr) of the proposed AlGaN/GaN HEMT is increased by about 40%, from 49 to 69 V, compared to those of the standard AlGaN/GaN HEMT.