• 제목/요약/키워드: Information System Project

Search Result 2,481, Processing Time 0.031 seconds

A Study on the Impact of the PMS Quality on Performance in Information Systems Project (IS프로젝트에서 PMS 품질이 성과에 미치는 영향에 대한 연구)

  • Jeong, Cheonsu;Ahn, Hyunchul
    • Knowledge Management Research
    • /
    • v.13 no.3
    • /
    • pp.79-103
    • /
    • 2012
  • Recently because the IS development project is large scale and complicated, the necessity of tools that can manage effectively smooth communications and the harmonized project between the interested parties is exposed. According to this fact, many companies are investing enough to the PMS (Project Management System) for the sake of the systematic management of the IS development project, and also this PMS is emerging as one of the indispensable tools for the successful IS development project by casting off from a auxiliary means for the past project management. However, as had been expected, whether the introduction of the PMS is possible to facilitate communications within a project team, and a main motivation that can derive individual performance and organizational performance that participated in the IS development project is induced or not are not verified still empirically and apparently. With respect to this, a survey was conducted to examine how PMS quality affected user satisfaction, communication, individual performance and project performance. The effects of the data gathered were verified by structural equation model analysis.

  • PDF

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

INTRODUCTION OF THE SIMC PROJECT

  • Chae, Gee-Ju;Cho, Seong-Ik;Park, Jong-Hyun;Jo, Kwan-Bok
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.356-359
    • /
    • 2006
  • The high prices and lack of information for satellite images prevent researchers from studying remote sensing and most non-professional people can't have the simple and easy solutions for the manipulation of satellite images. 'Satellite Imagery Information Management Center'(SIMC) project which is promoted by ETRI (Electronics and Telecommunications Research Institute) from 2002 to 2005 in Korea have the purpose to provide the satellite images freely to the public domain and the solutions for the above mentioned problems. Our project have the following five systems; Data Acquisition System, Data Preservation System, Integrated Solution System, Technology Development System, Operation Plan System. Data Acquisition System collects the satellite images such as LANDSAT, IKONOS, etc. Data Preservation System consists of database which registers the diverse satellite images. Integrated Solution System gives the user of public domain for the web service which search, order and transfer the satellite images. Technology Development System has the many processing technologies for the satellite images. Finally, the Operation Plan system has the role to plan the future of our SIMC project. In this paper, we will give the result of SIMC Project for each five systems during the fast four years from 2002 to 2005.

  • PDF

A Study on Determinants of Participants' Satisfaction in Information System Development Project: Focused on Outsourcing Project Participants' Satisfaction (정보시스템 개발 프로젝트 참여 만족도 결정요인에 관한 연구: SI 프로젝트 참여인력 만족도 중심으로)

  • Lee, Joo-Ryang;Suh, Kil-Soo
    • Information Systems Review
    • /
    • v.8 no.1
    • /
    • pp.203-222
    • /
    • 2006
  • The chronic problems of Information System Outsourcing Development Project include frequent changes in the participants and their roles, and the evasion of project participation, which exert unfavorable influence to the outcome of the project. Such problems are due, in large part, to the low level of project participants' satisfaction in the project. However, little is known about the factors that influence project participants' satisfaction in the project development. This research identifies six potential factors such as project commitment, workload, control, communication within the organization, inter-organization communication, and system development methodology based on PMI(Project Management Institute) and empirically examines their efficacy in explaining the level of participants' satisfaction in the IS development projects based on data from 390 participants in 66 projects. The results indicate that the six factors are strong determinants of participants' satisfaction in system development projects. In other words, the level of satisfaction among project participants overall are largely influenced by project commitment and control, communication, project methodology. Especially, the results reveal that the level of satisfaction among participants from the vendor decreased largely by unrealistic project commitment, frequent changes in project planning and unreasonable control rather than by a significant amount of workload. In conclusion, there need to be a rational approach and solution based on the six factors presented in this research in order to increase participation satisfaction level of the project participants and ultimately enhance project outcome.

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System (건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Smart Media Journal
    • /
    • v.4 no.4
    • /
    • pp.70-79
    • /
    • 2015
  • The Construction Project Information System(CPIS), an information system constructed as part of the Construction Continuous Acquisition & Life-cycle Support(CALS) of the Ministry of Land, Infrastructure, and Transport(MOLIT), is designed to digitize construction projects across all stages, and enable sharing of information so as to enhance the productivity and efficiency of construction projects and secure their transparent administration. One of MOLIT's internal work systems, CPIS focuses on work-handling and data management. However, now over 10 years old after its construction, it focuses on text and document-based construction project information, but it cannot be interfaced with the visualization-based GIS, which limits the sharing and dissemination of information and the determination of the overall construction project status. To resolve the existing CPIS limitations and problems and to upgrade the system, this study examined domestic and overseas GIS technology trends and relevant information systems, and analyzed the CPIS status and problems. It thus proposed total GIS application measures to upgrade CPIS. Also, it identified detailed CPIS utilization measures and GIS application measures by unit system, and analyzed considerations for GIS application.

A Reference Model for Audit and Project Management in the Information Technology using the CMM (CMM 기반 정보기술 프로젝트 관리 및 감리 참조 모델에 관한 연구)

  • 김태달
    • Journal of Internet Computing and Services
    • /
    • v.2 no.2
    • /
    • pp.11-22
    • /
    • 2001
  • For the effective and efficient management of the information system development project. the domestic market is also required to manage the project and set up the information system audit items, which are applicable to the actual project using CMM(Capability Maturity Model). With this thesis, we suggest a reference model complimenting the project. by letting a project manager recognize beforehand the present maturity status, within an organization as well as step-by-step management items and audit indicators for the future capability maturity improvement.

  • PDF

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.