• Title/Summary/Keyword: Information System Project

Search Result 2,486, Processing Time 0.026 seconds

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

A Study of iPMIS(Intelligent Program Management Information System) Information Inference an Searching System Based on Ontologies (온톨로지 기반 정보 검색 시스템을 이용한 iPMIS (지능형 종합사업관리시스템) 정보 추론에 관한 연구)

  • Ahn, Hyoung-Jun;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.175-179
    • /
    • 2009
  • Researches of current PMIS(Project Management Information System) information searching focus on providing personalized results as well as matching needed queries in an enormous amount of information. This paper aim at discovering hidden knowledge to provide personalized and inferred search results based on the ontology with categorized concepts and relations among construction data. The current PMIS searching occasionally presents too much redundant information or offers no matching results from large volumes of data. In this paper, we propose a service searching system, which becomes aware of users device using iPMIS(Intelligent Program Management Information System). And we design and plant the ontology-based iPMIS, which is aware of the context in its environment.

  • PDF

A Priority Analysis on Influential Factors for Invigorating Project Management Office (PMO) in Public Sectors based on Analytic Hierarchy Process (AHP) (계층분석과정을 이용한 공공분야 PMO 제도 활성화요인 우선순위 분석)

  • Back, Hyungchung;Kang, Pilsung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.42-53
    • /
    • 2014
  • This study identifies influential factors for invigorating the public management office (PMO) system for system integration (SI) projects in public sectors and analyzes the priority of each factor from the point of different stakeholders, i.e., owners, SI company, and PMO. Based on the literature review, four first-level influential factors are identified: legal system maintenance, owner's capability, SI company's capability, and PMO's capability. Among them, the PMO's capability is determined as the most critical factor by all the stakeholders. Among the second-level influential factors, the capabilities of professional engineers and project managers are considered as important among the PMO's capability, whereas the reasonable consulting fee is considered as the most critical factor among the legal system maintenance. With respect to each stakeholder, project management capability is considered as the most important factor for owners, while the reasonable consulting fee is considered as the most important factor for PMO.

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

A study on the project management for the Light-Rail Transit System Development using a web-based Knowledge Information system (웹기반 지식정보시스템을 이용한 경량전철기술개발사업관리)

  • 민재홍;목재균;한석윤;천승훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.29-34
    • /
    • 2001
  • In this paper, we'll change a data generated by the project for a database and make the better interface of all laboratory and a participating enterprise, constructing a knowledge-based management system to fit a characteristics within a country. Also, we'll manage the light-rail transit system development efficiently and systematically, constructing the web-based knowledge information system.

  • PDF

A Study on the Change in Trade Financial EDI form in Japan (무역금융EDI의 형태변화에 관한 연구 -일본의 사례를 중심으로-)

  • Kim, Jung-Uk
    • International Commerce and Information Review
    • /
    • v.7 no.4
    • /
    • pp.97-115
    • /
    • 2005
  • This paper describes the characteristics and outline of the Japan trade EDI project and proposes a vision for the future. The results are as follows; First, the TEDI(Trade EDI) project was initiated to promote paperless trading(using XML documents) on open networks such as the Internet, and to construct associated legal structures. Second there is converting harbor EDI system in existing EDI to single window system. Third, the NACCS system has been put into operation in Japan. To develope NACCS system must associate other system such as financial, insurance, logistic.

  • PDF

A Study on the Quality Improvement of Information System Auditing for Agile Methodology (애자일 방법론을 적용한 정보시스템의 감리 품질 향상에 관한 연구)

  • Park, Dong-Ah;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.4
    • /
    • pp.660-670
    • /
    • 2017
  • In case of auditing of the information system development project applying agile methodology, it is not appropriate to carry out a comprehensive check on the establishment of information system with only the existing check on software. This study considers the characteristics of the agile methodology in terms of Information System Auditing. To improve inspection quality of development project with agile methodology by deriving detailed check items of test activities at each stage, this study proposes a strategy to improve the check on software for the test activities of the supervisory model that is suitable for agile methodology, which emphasizes repetitive work.

Supporting Systematic Software Test Process in R&D Project with Behavioral Models

  • Choi, Hyorin;Lee, Jung-Won;Lee, Byungjeong
    • Journal of Internet Computing and Services
    • /
    • v.19 no.2
    • /
    • pp.43-48
    • /
    • 2018
  • Various artifacts that are produced as software R&D project progresses contain research plan, research report, software requirements and design descriptions, etc. When conducting a software R&D project, it is necessary to confirm that the developed system has implemented its research requirements well. However, various research results make it difficult to design appropriate tests. So, there is a practical need for us to comprehensively handle the planning, execution, and reporting of software test for finding and verifying information related to the research. In this paper, we propose a useful method for software test process in R&D project which supports model based software testing. The proposed method supports automation of test design and generation of test data by explicitly separating each step of System Under Test (SUT). The method utilizes the various models representing the control flow of the function to extract the information necessary for testing the system. And it supports a systematic testing process based on TMMi and ISO 29119. Finally, we show the validity of the method by implementing a prototype with basic functionality to generate test data from software behavioral models.

Design of Semantic Search System for the Search of Duplicated Geospatial Projects (공간정보사업의 중복사업 검색을 위한 의미기반검색 시스템의 설계)

  • Park, Sangun;Lim, Jay Ick;Kang, Juyoung
    • Journal of Information Technology Services
    • /
    • v.12 no.3
    • /
    • pp.389-404
    • /
    • 2013
  • Geospatial information, which is one of social overhead capital, is predicted as a core growing industry for the future. The production of geospatial information requires a huge budget, so it is very important objective of the policy for geospatial information to prevent the duplication of geospatial projects. In this paper, we proposed a semantic search system which extracts possible duplication of geospatial projects by using ontology for geospatial project administration. In order to achieve our goal, we suggested how to construct and utilize geospatial project ontology, and designed the architecture and process of the semantic search. Moreover, we showed how the suggested semantic search works with a duplicated projects search scenario. The suggested system enables a nonprofessional can easily search for duplicated projects, therefore we expect that our research contributes to effective and efficient duplication review process for geospatial projects.

Design and Implementation of Intelligent Integrated Information System for Research Ship (시험 연구선의 지능형 통합정보시스템 구축에 관한 연구)

  • Jang, Won-Tae;Kim, Ki-Bak
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.6
    • /
    • pp.990-995
    • /
    • 2010
  • We consider a problem of intelligent Integration Information system for research ship, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: management of engine, management of ship, researcher's work, education, training, manage schedule of the project, and thus to manage the whole life cycle of the research ship project. These goals are basically to facilitate and implement innovation- and enhancement-related activities which intelligent Integration Information system is fundamentally pursuing.