• Title/Summary/Keyword: Industrial parts

Search Result 2,162, Processing Time 0.024 seconds

Location of Transit Point and Guide Direction of Loops in the Tandem Configuration Manufacturing System (직렬구조 제조시스템에서 전달점의 위치와 루프의 이동방향)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.58
    • /
    • pp.29-39
    • /
    • 2000
  • This paper concerns the location of the transit point between adjacent loops and guide direction of loops in the tandem configuration manufacturing system. The tandem configuration has been used to solve control problems like the vehicle dispatching and traffic control. The transit point between loops needs to deliver the parts from one loop to another. The location of transit point between adjacent loops and direction of loops must be determined to minimize the total travel time of parts in the manufacturing system. The model formulation is developed, a numerical example is shown.

  • PDF

Informative Approach for Optimal Control Policy of Man-Machine System (인간-기계시스템의 최적관리를 위한 정보이론적 접근)

  • 이태희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.37
    • /
    • pp.63-70
    • /
    • 1996
  • This paper presents a model which may be used in optimal control of the Man-Machine systems in the aspect of information transmission. For this, we divided information into human parts and machine parts, and consider minimum error principle as a machine operating logic. Furthermore, we take the maximum information principle as a human information operating logic. This can be done in considering the Fisher Information and its transformed type, information inequality.

  • PDF

An Approach to Double Hoist Scheduling in the Chemical Processes

  • Lim, Joon-Mook;Hwang, Hark
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.2
    • /
    • pp.131-145
    • /
    • 1993
  • This paper deals with scheduling problem of the chemical process system where aircraft parts go through a given sequence of tanks filled with chemical solutions. The system has two hoists which move carriers holding the parts between tanks. A mixed integer programming model is developed from which a maximum throughput schedule can be found for the hoist movements. To show the validity of the model, a real world problem is solved and the results are compared with those with an existing approach.

  • PDF

자동생산라인에서의 통계적공정관리시스템

  • Park, Jeong-Kee;Jung, Won
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.1 no.1
    • /
    • pp.111-125
    • /
    • 1996
  • This paper presents a statistical process control(SPC) system in the electronic parts manufacturing process. In this system, an SPC method is integrated into the automated inspection technology on a real time base. It shows how the collected data can be analyzed with the SPC to provide process information. also presented are stuided of subpixel image processing technology to improve the accuracy of parts mearements , and the cumulative-sum(CUSUM) control chart for fraction defectives.An application of the developed system to connector manufacturing process as a part of computer integrated manufacturing (CIM) is presented.

  • PDF

Scheduling in Flexible Manufacturing System with Flow Type (흐름작업장 형태를 따르는 유연 생산시스템에서의 일정계획)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.97-103
    • /
    • 1991
  • This paper deals with a scheduling problem with the objective of maximizing the throughput rate in flexible manufacturing system with shop type. Manufacturing system is consisted of multi-stage in series. All kinds of parts are processed in same in processing time. No buffer space is allowed between stages, and no part waiting is allowed in each stage. Part flow control method for determining the optimal production sequence of all parts and the production starting time of each part is proposed.

  • PDF

Optimal Operation for Green Supply Chain with Quality of Recyclable Parts and Contract for Recycling Activity

  • Kusukawa, Etsuko;Alozawa, Sho
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.3
    • /
    • pp.248-274
    • /
    • 2015
  • This study discusses a contract to promote collection and recycling of used products in a green supply chain (GSC). A collection incentive contract is combined with a reward-penalty contract. The collection incentive contract for used products is made between a retailer and a manufacturer. The reward-penalty contract for recycling used products is made between a manufacturer and an external institution. A retailer pays an incentive for collecting used products from customers and delivers them to a manufacturer with a product order quantity under uncertainty in product demand. A manufacturer remanufactures products using recyclable parts with acceptable quality levels and covers a part of the retailer's incentive from the recycled parts by sharing the reward from an external institution. Product demand information is assumed as (i) the distribution is known (ii) mean and variance are known. Besides, the optimal decisions for product quantity, collection incentive of used products and lower limit of quality level for recyclable parts under decentralized integrated GSCs. The analysis numerically investigates how (1) contract for recycling activity, (ii) product demand information and (iii) quality of recyclable parts affect the optimal operation for each GSC. Supply chain coordination to shift IGSC is discussed by adopting Nash Bargaining solution.

Material Requirements Planning for Military Maintenance Depot (군 정비창 자재소요계획)

  • Kim, Heung Seob;Kim, Pansoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.24-34
    • /
    • 2014
  • In order to manage essential parts that are required for the repairable parts services performed at the military maintenance depots, the United States Air Force developed the Repairability Forecasting Model (RFM). In the RFM, if the requirements of the parts are assumed to follow the normal probability distribution after applying means from the past data to the replacement rate and lead times, the chance of the AWP (Awaiting Parts) occurring is 50%. In this study, to counter the uncertainties of requirements and lead times from the RFM, the safety level concept is considered. To obtain the safety level for requirements, the binomial probability distribution is applied, while the safety level for lead time is obtained by applying the normal probability distribution. After adding this concept, the improved RFM is renamed as the ARFM (Advanced RFM), and by conducting the numerical stimulation, the effectiveness of the ARFM, minimizing the occurrence of the AWP, is shown by increasing the efficiency of the maintenance process and the operating rate of the weapon system.

Optimal Operation for Green Supply Chain Considering Demand Information, Collection Incentive and Quality of Recycling Parts

  • Watanabe, Takeshi;Kusukawa, Etsuko
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.2
    • /
    • pp.129-147
    • /
    • 2014
  • This study proposes an optimal operational policy for a green supply chain (GSC) where a retailer pays an incentive for collection of used products from customers and determines the optimal order quantity of a single product under uncertainty in product demand. A manufacturer produces the optimal order quantity of product using recyclable parts with acceptable quality levels and covers a part of the retailer's incentive from the recycled parts. Here, two scenarios for the product demand are assumed as: the distribution of product demand is known, and only both mean and variance are known. This paper develops mathematical models to find how order quantity, collection incentive of used products and lower limit of quality level for recycling affect the expected profits of each member and the whole supply chain under both a decentralized GSC (DGSC) and an integrated GSC (IGSC). The analysis numerically compares the results under DGSC with those under IGSC for each scenario of product demand. Also, the effect of the quality of the recyclable parts on the optimal decisions is shown. Moreover, supply chain coordination to shift the optimal decisions of IGSC is discussed based on: I) profit ratio, II) Nash bargaining solution, and III) Combination of (I) and (II).

Policy Priorities for Promoting Youth Activities with Importance-Performance Analysis (IPA) - Case of Hongseong County - (중요도-만족도 분석(IPA)을 통한 청년활동 정책방안 연구 - 충청남도 홍성군 사례 -)

  • An, Joong-Won;Park, Duk-Byeong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.28 no.1
    • /
    • pp.53-68
    • /
    • 2021
  • This study aimis to identify policy priorities for promoting youth activities through the Importance-Performance Analysis (IPA). IPA is used to identify policy priorities for promoting local youth activities. The IPA tabulated result is presented in a two-dimensional grid to showing for promoting local youth activities, The require concentrate support part is divided into 3 parts. Problem solve supporting at work development of leisure activities programs, leisure activities programs developing and development of leisure-related professionals. And leisure-related professionals developing. The next parts that require continuous management were divided into four parts. The next parts that require continuous management is divided into four parts. Creating rental housing for young people, support for housing expenses supporting, loans supporting, and Holiday guaranteed. Based on the factors that support youth activities that make up the IPA matrix, the implications of revitalizing local youth activities is presented as below. First, ensuring employment of local youth and efforts to create sustainable jobs. Second, continuous efforts to improve the housing conditions of local youth, and third, policy support is needed for local youth to do various leisure activities.

Improve the Logistics System of the Auto Parts Enterprises Bar (자동차 부품 기업의 물류시스템 개선 방안 연구)

  • Lim, Jong-chul;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.237-243
    • /
    • 2017
  • Currently, Korea is actually increasing and increasing demand for leisure such as parts for A/S of automobile parts of the car, as well as trends in borrowing and finished parts are also required a steady increase in automobile traffic daetsu. There is one car and want to be driving a car A/S parts supplier smoothly for many years and that it is often the case if it is not supplied in a timely fashion, it is a reality that many eonseong hear from customers. These symptoms can be confirmed that the logistics systems of a system of selling auto parts supplier but above all a problem for several reasons, which will be considered as areas for improvement should be done urgently. Enterprises internally cooperation automotive supplier, but the need to get out to re-examine urgently complemented by the logistics system of systems to allow better respond to complex environmental changes of our customers grow, and now also the proliferation of small ship-run screen and Darvin, there is increasing distribution and logistics services, including logistics costs as a lack of work force that the company is itgetda can be called by the reality that the chances of getting a lot of jeyakreul own growth. Given this situation, the procurement of logistics enterprises. In-house logistics. Classified as sales logistics examined the long-term improvement of logistics distribution networks based on this part to derive into the problems of logistics and parts distribution system of Korean auto parts dealer.