• Title/Summary/Keyword: In charge of safety management

Search Result 164, Processing Time 0.038 seconds

A case study on the industrial wastes illegally in Teshima (산업폐기물의 불법투기 사례에 대한 연구(일본의 테시마 사건을 중심으로))

  • Lee, Hyeon-Yong;Song, Jun-Yeop;Lee, Seung-U;Ryu, Byeong-Sun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.04a
    • /
    • pp.197-203
    • /
    • 2007
  • Teshima has been a quiet and beautiful island, but started to be imaged as an "island of wastes" because of the 600,000 tons of industrial wastes thrown there illegally. Now it symbolizes the problem of industrial wastes in Japan. Teshima development company, an industrial waste disposer, started to dispose industrial wastes illegally in the west side of the island, since the late 1970s. Hyogo Police Station exposed this illegal act, and arrested 6 persons of the company, including its president, in charge of having violated the Waste Disposal and Public Cleansing Law in 1991. This illegal disposition has continued for 13years until it was exposed by the police. Teshima case of industrial wastes are introduced in this paper.

  • PDF

A Study on the Sensing System Construction of a Missing Roadbed (철도 노반유실검지시스템 구축에 관한 연구)

  • Kim, Ki-Young;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.461-470
    • /
    • 2009
  • A railroad has a benefit of the mass transportation of a passenger and cargo, but just a time of accident could cause a huge loss of a human life and property. Especially, a typhoon and a localized torrential downpour usually happened in summer season have caused average 38.29 times of the missing roadbed which support the railroad in recent 7 years. If a train would pass on this railroad which the roadbed was missed, there could be a huge accident and many people will die. But, the security issue is not satisfied because the method of sensing the missing roadbed is depending solely on the naked eye inspection by a person in charge. So, in this study, I would like to suggest the missing roadbed real-time sensing and train operation system to reduce the possibility of the railroad accident by controlling the operation of train when the missing roadbed condition would be sensed in the real-time system.

  • PDF

Survey on Experts' Opinion for the Legal Examination of WMSDs Risk Factors (근골격계부담작업 유해요인조사 제도에 대한 전문가 의견 조사)

  • Lee, In-Seok;Park, Jae-Hee;Jung, Hwa-Shik;Kee, Do-Hyung;Kim, Hyun-Joo;Roh, Sang-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.4
    • /
    • pp.90-95
    • /
    • 2009
  • The purpose of this study is to investigate industrial safety and health experts' opinions on the examination system of WMSDs(work related musculoskeletal disorders) risk factors. For doing this, a questionnaire study and two FGIs(focused group interview) were conducted. A questionnaire with open questions about the examination system was developed, and sent to 42 experts consented bye-mail. Of the experts, 24 experts responded, whose data were used in the analysis. The FGIs were performed for the persons in charge of industrial safety and health in industries and ergonomists. The questionnaire study revealed that most experts(91.3%) agreed with legalization of employers' duty for preventing WMSDs, necessity of the 11 tasks designated by Ministry of Labor, the examination system and ergonomics program, and pertinency for the examination system classification of periodic and occasional one. However, more than half experts disagreed with timeliness and appropriateness of the legal system. This was validated by the low approval rates for appropriateness of the 11 tasks, methods of the examination, charge person in the examination and ergonomics program. FGIs showed that it was desirable for the examination system to be legalized, and that the system was generally properly performed. It was suggested that the system be partially revised with reflecting problems disclosed during its enforcement rather than whole revision. It is expected that when revising relevant legal system, the results of this study would be used as valuable data.

OPTIMIZATION ALGORITHM FOR AUTOMATIC LAYOUT OF TOWER CRANES

  • Dong-Hoon Lee;Hyun-Min Lee;Jin-Kyu Joo;Sun-Kuk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1060-1067
    • /
    • 2009
  • The selection and operation of tower cranes at construction sites are dependent on the personal experience of engineers in charge of lifting work. It often causes to overestimate the safety factor resulting in increase of construction cost, or underestimate it resulting in disastrous accident. Therefore, selection of tower cranes needs to consider cost, safety and maximum lifting condition. This study, for resolving such problems, was intended to propose the algorithm designed for even the inexperienced person to select the optimal lifting equipment in timely manner. The algorithm presented herein is an optimization algorithm that enables automatic arrangement of tower crane and minimization of costs by analyzing such conditions as vertical height and lifting load, etc.

  • PDF

Development of safety management manual using Work Breakdown Structure (작업분류체계를 이용한 철도공사 안전관리 매뉴얼 개발)

  • Hong Seon-Ho;Wang Jong-Bae;Cho Yuen-Ok;Hong Yong-Ki;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.90-96
    • /
    • 2005
  • The existing safety-management manual is confined to list data based on regulations, and only provide ways to prevent accidents/incidents for particular work which accidents occur frequently. As it is difficult to understand the complete process involved the work, we can not expect the manual to function as a guide to prevent unfortunate events. When establishing WBS(work breakdown structure) of railway line engineering, consideration of the characteristics of train operation will enable many benefits. Therefore in this research it is conducted to materialize it in the manual. Main contents in this research are to review the way that change complete work performance process and person in charge of different tasks into WBS(work breakdown structure), and trough the newly developed WBS , the ways to improve roles and functions of the manual which Korean Railroad made are recommended.

  • PDF

The Priority Analysis on Corporate Social Contribution Activities by AHP (AHP에 의한 기업의 사회 공헌 활동 우선순위 분석에 관한 연구)

  • Chung, Soon-Suk
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.41-50
    • /
    • 2008
  • The study proposes a priority model for program directors in charge of Corporate Social Contribution to make the best decision. This empirical analysis aims to discover the most significant area among various programs of Corporate Social Contribution Activities. The Analytical Hierarchy Process (AHP) is used to test the priority model. The study attempts to demonstrate how the model helps providing better decision choices in corporate practices. The priority preference in Corporate Social Contribution Activities programs among corporate social contribution practitioners, PR professors and NGO activists is examined in order to present preferred programs of corporate social contribution programs, which they value the most as a part of overall social welfare.

  • PDF

Development of Battery Management System for Electric Vehicle Applications of Ni/MH Battery

  • Jung Do Yang;Lee Baek Haeng;Kim Sun Wook
    • Journal of the Korean Electrochemical Society
    • /
    • v.4 no.4
    • /
    • pp.152-159
    • /
    • 2001
  • Electric vehicle performance is very dependent on traction batteries. For developing the electric vehicles with high performance and good reliability, the traction batteries have to be managed to get maximum performance under various operating conditions. The enhancement of the battery performance can be accomplished by implementing battery management system (BMS) that plays important roles of optimizing the control mechanism of charge and discharge of the batteries as well as monitoring battery status. In this study the battery management system has been developed for maximizing the use of Ni/MH batteries in electric vehicle. This system provides several tasks: the control of charging and discharging, overcharge and over-discharge protection, the calculation and display of state of charge, safety and thermal management. The BMS was installed in and tested using the DEV5-5 electric vehicle developed by Daewoo Motor Co. and Institute for Advanced Engineering in Korea. The 18 modules of Panasonic Ni/MH battery, 12 V-95 Ah, were used in the DEV5-5. The high accuracy within the range of $3\%$ and the good reliability were shown in the test results. The BMS can also improve the performance and cycle life of Ni/MH battery pack as well as the reliability and safety of the electric vehicles (EV).

A Study on Establishing Management Plans for Safety and Health Management System of Public Enterprise (공기업의 안전보건경영시스템 관리 방안 수립에 관한 연구)

  • Jihoon Cho;Jebum Pyun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.29 no.3
    • /
    • pp.137-152
    • /
    • 2024
  • In order to derive a plan to increase the field effectiveness of the safety and health management(SHM) system, this study suggested plans for practical application of SHM system to the actual sites managed by the branch office of a public enterprise along with practical implications that should be considered. For this, in-depth interviews were conducted with employees in charge of safety and health work at the sites to analyze SHM system of the branch office, and the implementation processes and frameworks for establishing SHM system were suggested by grasping the actual conditions of the construction company performing the construction ordered by the branch office. This study shows that in order for SHM to be internalized in public enterprises, plans and performance indicators that can be applied in the field should be specifically presented in consideration of the hierarchical structure and processes of the organization performing the work, and a work environment should be created to focus on practical works related to safety and health.

A Study of the Improvement Plan and Real Condition Estimation of Fire Protection Safety Management for Power Plants in Korea (국내발전소 소방안전관리 운영실태조사 및 개선방안에 관한 연구)

  • Kang, Gil-Soo;Choi, Jae-wook
    • Fire Science and Engineering
    • /
    • v.31 no.2
    • /
    • pp.61-73
    • /
    • 2017
  • The Fukushima Nuclear Disaster in 2011 and California Power Failure in 2001 are examples of the importance of the power plant safety management that caused huge national loss with a power-related mass casualty incident. In a situation where humans cannot live without electricity, efforts to strengthen the systematic firefighting safety management in power plants that produce electricity with large amounts of hazardous materials as fuel, such as nuclear energy, coal and gas, are essential to protect life and prevent property loss and stable economic growth from fire explosion accident or radiation leak due to the negligence of safety management and natural disasters such as earthquakes, which has recently become an issue. This study examined the operating situation of firefighting safety management in power plants with firefighting officials employed by five power generation companies including Korea Southern Power Co., Ltd. and Korea Hydro & Nuclear Power Co. Ltd., which are in charge of the domestic power supply. As a result, for the systematic firefighting safety management of power plants, improvement plans were drawn, including the development of an effective business manual and a comprehensive management system, the substantiality of firefighting safety education, and the strengthening of seismic designs to prepare for earthquakes.

High safety battery management system of DC power source for hybrid vessel (하이브리드 선박 직류전원용 고 안전 BMS)

  • Choi, Jung-Leyl;Lee, Sung-Geun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.7
    • /
    • pp.635-641
    • /
    • 2016
  • In order to drive a hybrid propulsion device which combines an engine and an electric propulsion unit, battery packs that contain dozens of unit cells consisting of a lithium-based battery are used to maintain the power source. Therefore, it is necessary to more strictly manage a number of battery cells at any given time. In order to manage battery cells, generally voltage, current, and temperature data under load condition are monitored from a personal computer. Other important elements required to analyze the condition of the battery are the internal resistances that are used to judge its state-of-health (SOH) and the open-circuit voltage (OCV) that is used to check the battery charging state. However, in principle, the internal resistances cannot be measured during operation because the parallel equivalent circuit is composed of internal loss resistances and capacitance. In most energy storage systems, battery management system (BMS) operations are carried out by using data such as voltage, current, and temperature. However, during operation, in the case of unexpected battery cell failure, the output voltage of the power supply can be changed and propulsion of the hybrid vehicle and vessel can be difficult. This paper covers the implementation of a high safety battery management system (HSBMS) that can estimate the OCV while the device is being driven. If a battery cell fails unexpectedly, a DC power supply with lithium iron phosphate can keep providing the load with a constant output voltage using the remainder of the batteries, and it is also possible to estimate the internal resistance.