Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle (고속철도차량 1차 구동장치에 대한 완전분해정비의 최적 주기 평가)
-
- Journal of the Korea Academia-Industrial cooperation Society
- /
- v.16 no.12
- /
- pp.8700-8706
- /
- 2015