• Title/Summary/Keyword: IT project performance

Search Result 1,432, Processing Time 0.027 seconds

Improvement of Project Competency for Small IT Companies through SWOT-AHP Analysis (SWOT-AHP 분석을 통한 소규모 IT업체의 프로젝트 수행 역량 개선)

  • Lee, Min-Kyung;Kang, Chang-Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.83-89
    • /
    • 2018
  • In the SW industry, the diversification of global markets and technology trends are changing due to the emergence of new services, and IT companies are in need of strategic change different from the previous one. In this study, SWOT analysis was performed by extracting the internal environmental factors and external environmental factors through the previous studies to improve the project performance competence of small IT companies, and the SWOT Matrix was reconstructed through the pairwise comparison. Based on this, the purpose of this research was to propose the project performance competency improvement plans for small IT companies based on importance and priority, and the following four strategies were derived from the result of SWOT-AHP analysis. SO strategy was drawn in direction to invest R & D in new SW industry to enhance technology competitiveness of SMEs in order to develop SMEs, and in order to secure competitiveness of SW industry, WO strategy is drawn the cultivation of professional technical manpower through SW policy. ST Strategy presented technical management through SW system improvement policy to improve SW environment, and WT Strategy presented awareness training on the construction and necessity of project management system construction. Using the strategies presented in this study, it is expected that the managers of small IT firms will be presented as references to measure the performance competence factors of current organizations and company organizations.

A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance (정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구)

  • Lee, Jae-Beom;Jang, Yun-Hi;Kim, Sang-Yeol
    • Journal of Digital Convergence
    • /
    • v.9 no.2
    • /
    • pp.111-129
    • /
    • 2011
  • Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.

The Empirical Analysis on the Performance of Inter-firm Network Management in the IT Service Firms (IT서비스 기업에서의 네트워크 경영 관련 성과 요인에 대한 실증 연구)

  • Ahn, Yeon S.
    • Journal of Information Technology Services
    • /
    • v.10 no.1
    • /
    • pp.47-64
    • /
    • 2011
  • In the IT(Information Technology) service, which supply the solutions related to business management and IT, network construction and application trends, the related service business are increasing according to the enlargement of project scope and the diversity of project types as the need of service customers. In this paper, I propose the significant effect factors on the network management of IT service firms. The key findings are from the analysis result about 94 IT service firms as follows. For implementation the high performance of network management in the IT service firms, the strategic elements in the process of network construction are more conceived highly than the basic element in them. Also the perspective of project objectives are considered than the nominal perspectives in the partner selection process. The competency of partner firms', the cooperation process between the partner firms', network relation operation management and network relation structure management are the significant effect factors of network management.

A Study on the Improvement of National R&D Project Performance Evaluation and Budgeting System

  • Kyunghwan, Park;Hyungwook, Sim;Seokki, Cha
    • Asian Journal of Innovation and Policy
    • /
    • v.11 no.3
    • /
    • pp.342-362
    • /
    • 2022
  • The national R&D project is a major strategy for the development of science and technology in the country. This is promoted for the purpose of improving the welfare of the people, such as creating jobs and fostering small and medium-sized enterprises, through the results of science and technology research conducted with support from the national budget. Therefore, analysis of the performance evaluation and budgeting system of the current national R&D project is one of the essential parts of preparing a system improvement plan. This study derived improvement plans through a comparative analysis of national R&D project performance evaluation and budget systems in Korea and leading countries such as the United States and Japan. As a result, it was confirmed that it may be difficult to derive innovative research results due to the lack of sustainability and a short period of time to require quantitative performance. To overcome these difficulties, the need for system improvement as follows was suggested. First, it is necessary to enlarge and prolong national R&D projects. Second, a plan for securing sustainability is needed in consideration of the main characteristics of each research field. Finally, it is necessary to strengthen the linkage between organizations in charge of national R&D projects. And also, there is a need for a system that can continuously identify problems and improve the system. In addition, the constitutional amendment will be necessary to separate science and technology from economic development, which states that Article 127, Paragraph 1, "Science and technology should be subordinated to economic development," which is the science and technology article of the current constitution.

Analysis of ABC Success Factors Affecting Construction Project Performance (건설프로젝트 성과에 영향을 미치는 ABC 성공요인 분석)

  • Shin, Young-Su;Cho, jin-Ho;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.56-65
    • /
    • 2022
  • This study tried to identify the key success factors of ABC by identifying the influence of ABC's success factors on project performance and analyzing the moderating effect of communication. For this purpose, factors applicable to construction projects were extracted through case studies related to the success factors of ABC, an activity-based financial management technique. The survey method was conducted as an online survey method using the Delphi method. For statistical analysis, frequency analysis and factor analysis were performed with SPSS Statistic 20, and hypothesis testing was performed with SmartPLS 2.0. As a result of the analysis, it was found that linkage with quality initiatives affects not only ABC's success factors on project performance, but also communication moderation effects. It was confirmed that linkage and communication with quality initiatives are the most important key success factors for ABC's success. Based on the results of this study, it is expected that if ABC and quality management are well linked, it will be effective in improving project performance.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

A Study on the Effect of Satisfaction with R&D Projects on R&D Performance Satisfaction -For SMEs in Jeollanamdo-

  • Choi, Hong Wan;Kang, Min Jung
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.11-19
    • /
    • 2021
  • The purpose of this study is to check whether the satisfaction of the R&D (Research & Development) project directly affects the R&D performance, and to find out whether the satisfaction with regional connectivity and the satisfaction with the R&D operation management significantly mediate the relationship that the satisfaction with the R&D project has on the R&D performance. In order to verify the research hypothesis on this, a total of 51 companies located in Jeollanam-do that actually conducted R&D research projects were surveyed and analyzed. In order to conduct an empirical study based on the collected questionnaire, a survey questionnaire related to the variables of the study model was composed based on a sample of 51 questionnaires. We used the SPSS program to verify the hypotheses in this study, and the hypotheses were verified by analyzing the validity, reliability, correlation, and deflection. As a result, there was a positive (+) significant relationship between R&D project satisfaction and R&D performance. In addition, it was found that the relationship between R&D project satisfaction and R&D performance was significantly mediated by the satisfaction with R&D regional connectivity and satisfaction with R&D project operation management.

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking (분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법)

  • Cho Kyu-Kab;Moon Byung-Keun
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF