Journal of Information Technology Applications and Management
/
제16권4호
/
pp.109-134
/
2009
Compared to research on the success of IT projects in general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.
Various stakeholders within and outside of the organization are involved and participate in the outsourced IS development. As their interests and goals are different conflict arises in the process of their interaction, and it is an important factor affecting outsourcing success. The study focuses on the conflict between client users and vendor, i.e. main conflict in the outsourcing project, and examines the relationship of conflict with project success, the antecedents of conflict, and investigates the effectiveness of conflict resolution facilitation. An integrated conceptual model is developed grounded on is outsourcing, IS development, project management, and organizational behavior literature. Nine specific hypotheses on the conflict in outsourcing projects are proposed, and data collection and analysis are performed with 214 ISD outsourcing projects. Results indicated that the conflict between client users and vendor in outsourcing projects was found to have negative effects on project success. Main causes affecting conflict were examined, and relative influences of these causes were clarified. Recently internal IT personnel have been faced their role change with the increase of outsourcing, and the importance of their conflict resolution facilitation was highlighted.
IT projects need engineers with various backgrounds to cooperate to build an IT system that satisfy the requirements of users given a limited expense and time. Such diversity of team members and the complexity of task naturally involve considerable amount of conflict among team members. High level of conflict among team members is known to be detrimental to the performance of the team. The purpose of this study is to examine the reasons for conflicts among team members in IT projects and to check how the level of conflict affects the performance of a project and the satisfaction of the members of the project team. To test the relationship, a survey on 166 participants in IT projects was conducted. The reasons for conflicts in IT projects were categorized into five types. The level of ambiguity was found to have a significant correlation with the level of conflict. And the level of conflict, in turn, is found to have a significant effect on the degree of satisfaction among team members and the project results. Based on the research results, it is suggested that a clear definition of tasks and their boundaries is required to reduce ambiguity and thus, the level of conflict and improve the level of satisfaction of IT project team members.
Compared to research on the success of IT projects In general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.
Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.
Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.
Conflict may occur during teamwork activities. Conflict is the incompatibility of interest of participants; hence, it is more common in a wide varied activities involved construction field. Goals and values involve positive or negative features and are therefore common sources of conflict in construction field. Excessive conflict is a major hindrance to the effective operation of a team. If the conflict is not managed timely and properly, it could be transformed into a big dispute, thus to avoid these situation, it is necessary to augment working together culture. This paper aims to identify project team working factors and to uncover underlying relationships between these factors. A questionnaire survey was used to collect data from professionals. Factor analysis was employed to categorize twenty-one teamwork items evaluated by 169 respondents working in three major construction parties namely, owners, consultants and contractors. Factor analysis uncover that these team work factors can be grouped under three categories titled as: integrative working culture, relationship building and trust building. Multiple regression analysis however, showed that relationship building factor does not influence job satisfaction of project participants. Results of this study can be used as a tool to strengthening relationship between project participants in the construction industry.
The 9th International Conference on Construction Engineering and Project Management
/
pp.111-118
/
2022
Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.
국내에서 발생하는 공공갈등은 증가 추세이며, 갈등으로 인한 직·간접 피해가 크기 때문에 이를 줄이고자 다양한 연구가 진행되고 있다. 그러나, 기존 연구들은 갈등자체에 보다 중점을 두고 있어 갈등으로 인한 건설사업에 대한 영향에 대한 연구는 미흡한 실정이다. 또한, 대부분의 공공갈등은 대형 SOC 사업과정에서 발생하기에, 프로젝트 특성을 고려한 갈등연구가 필요하다. 따라서 본 연구에서는 프로젝트 특성과 공공갈등 특성 간 영향 관계의 중요도를 파악하였다. 문헌고찰과 전문가 자문을 통해 프로젝트와 공공갈등의 대표 특성을 4개씩 선정하였고, 두 집답의 특성 간 영향 관계 중요도를 Fuzzy AHP를 이용하여 분석하였다. 그 결과, 프로젝트 특성 중 SOC 건설사업 유형이 전반적 갈등특성에 가장 큰 영향을 미쳤다. 갈등특성 중 특히 갈등요인과 갈등단계가 건설사업 유형과의 영향 관계 중요도가 높게 나왔다. 본 연구결과를 통해, 프로젝트 특성에 따라 달라지는 갈등의 특성들을 고려한 갈등관리방안 수립할 수 있을 것으로 기대된다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.628-634
/
2009
It is a common practice in Hong Kong for the main contractors of local building projects to sublet most of the work to subcontractors. Consequently their roles have gradually transformed from a constructor to a manager of subcontractors. The outcomes of a project therefore depend heavily on the subcontractors' performance. However, most of the subcontractors complain that they are unable to efficiently and effectively operate due to site coordination problems, such as inaccurate site reference lines, caused by main contractors. The site problems may consume significant amounts of resources if practical solutions cannot be agreed by the project participants early enough. Rahim Organizational Conflict Inventory-II (ROCI-II) model was developed by M.A. Rahim that measure five types of conflict management style including Integrating, Obliging, Dominating, Avoiding and Compromising. This paper presents the questionnaire survey based on the ROCI-II model to rank the preference on the conflict management style adopted by the project representatives of the subcontractors in handling the site coordination problems and its impact to the time used to agree the solutions to the different types of site coordination problems with main contractor. The survey results show that most of the subcontractors' project representatives preferred to adopt the Compromising style to tackle the site coordination problems and the time used to agree the solutions with main contractor was influenced by the conflict management style adopted.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.