• 제목/요약/키워드: IT Project Model

검색결과 2,009건 처리시간 0.027초

QUANTIFICATION MODEL FOR APPLYING CONSTRUCTION MANAGEMENT PRACTICES IN CONSIDERATION OF PROJECT CHARACTERISTIC FACTORS

  • Hee Sung Cha;Jin Lee Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.624-627
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.

  • PDF

플립러닝형 프로젝트 기반학습을 적용한 수업 설계: Digital Painting Tool 수업을 중심으로 (Class Design Applying Flipped Learning Combined with Project-Based Learning: Focusing on Digital Painting Tool for Class)

  • 성례아;공현희
    • Journal of Information Technology Applications and Management
    • /
    • 제29권1호
    • /
    • pp.29-45
    • /
    • 2022
  • The Fourth Industrial Revolution era requires people to have the ability of integrated thinking, critics, sensitivity, and creativity in an integrated manner. Therefore, teaching methods are expected to become more suitable for the trend. In this belief, current teacher-leading education method should move to students' self motivating one and consist of programs in which students voluntarily involve. In this reason, this study suggests FPBL educational method model that is combines project-based learning with flipped learning by analysing preceding research and digital painting tool class was designed by applying it. As a result of applying the designed class model to the class, all of the class satisfaction, effectiveness, and interaction were evaluated positively. Problems such as limitations of project classes due to non-face-to-face classes, large amount of learning before class, and reduced concentration during class were found. Therefore, when the FPBL class model is conducted non-face-to-face, it will be necessary to further strengthen the role of the instructor, provide lecture videos summarizing the core contents, and improve concentration by providing active participation and fun using various digital tools. The result of the study looks significant by confirming the possibility of applying FPBL model not only in design education but also other educational settings.

아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구 (A Basic Study on the Development of Profit Risk Management Model for Apartment Projects)

  • 손승현;이성호;한범진;나영주;김지명
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

수산업관측사업의 가격안정화 효과 분석 (Price Stabilization Effect of the Fisheries Outlook Project)

  • 이상호;정원호
    • 수산경영론집
    • /
    • 제53권4호
    • /
    • pp.15-26
    • /
    • 2022
  • This paper analyzed the price stabilization before and after the fisheries outlook project for seaweed, flatfish, and abalone. First, the stabilization effect was analyzed through the price variation coefficient before and after the observation project. In terms of the variation coefficient, there was no effect that the price was stabilized through the seaweed outlook project. However, it can be seen that flatfish and abalone have a price-stabilizing effect. Second, as a result of analyzing the price stabilization effect through the improved ARMA-T-GARCH model, it was confirmed that seaweed was not statistically significant while flatfish and abalone had a price stabilization effect by statistically significantly reducing volatility of real prices after the introduction of the fisheries outlook project. Third, as a result of analyzing the factors affecting price stability, it was found that the price of seaweed was stabilized after the WTO, but the Japanese earthquake expanded the price volatility. In the case of flatfish, it was analyzed that the price stabilized after the WTO and the Great Japanese Earthquake. Finally, the price of abalone has stabilized since the WTO and the Great Japanese Earthquake.

IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

일본의 빈집을 활용한 지역사회 커뮤니티 거점공간 분석 - 교토시 「빈집활용 & 마을만들기」 모델 프로젝트를 중심으로 - (Analysis of Local Community Spaces Bringing Empty Homes Back into Use in Japan - Focused on Empty Home Utilization Model Project of Kyoto City -)

  • 박혜선;은난순
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제24권2호
    • /
    • pp.65-77
    • /
    • 2018
  • Purpose: By identifying the contents of the "Empty Home Utilization & Community Revitalization Model Project" which is a pilot project of empty homes back into use in Kyoto City and analyzing the characteristics of the case housing, the purpose of this study is to find out implications and suggest improvements for the domestic empty home utilization project. Methods: The scope of the survey covers seven project sites in the period from 2014 to 2016. The research method is to derive the physical and operational characteristics of the project, through the literature reviews related to bringing empty homes back into use in Kyoto City and the field survey including the space measurement and the operator interview. Results: First, in order to succeed in bringing empty homes back into use for community revitalization, the selection process of the project and the role of the public in and after supporting the project are important. Second, the important features that are required as a physical characteristic of the project are an advantage in location and an interactive space that is available at all time like a community cafe at the entrance. Third, as an operational characteristic of the empty home utilization project, it is advantageous for the local residents to participate as a business actor or an operator, and it is the continuous use of residents and outsiders by implementing an operating program that is suitable for the characteristics of the local community. Implications: The physical and operational activation factors to bring empty homes back into use need to be included as the project screening standards. And it is necessary for the public to develop the Intermediate Support Organization and to participate in linking with residents in order to carry out the empty homes utilization project effectively.

개발형 주택건설사업의 성공적 수행 위한 사업 기획 업무프로세스 모델 연구 (A Business Planning Process Model to Develope Successful Housing Project)

  • 박찬우;김경래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.245-250
    • /
    • 2001
  • 최근의 국내 건설시장은 시장 규모의 축소로 인해 과잉경쟁이 이루어지고 있으며 이에 기업들은 적극적인 수주산업인 기획제안형 주택사업 분야에 관심을 기울이고 있다. 기획제안형 사업에서 가장 중요한 단계는 사업성 여부를 판단하는 초기 기획단계로서 현재 각 기업들마다 기획업무 모델을 갖고 있으나 표준적인 모델이 제시되지 못하고 있다. 이에 본 논문에서는 국내 기업의 기획업무 절차와 문제점파악에 의한 개선 방안을 바탕으로 개발형 주택사업 의 성공적 수행을 위한 전략적 기획업무 모델을 제안하려 한다

  • PDF

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF