• Title/Summary/Keyword: IT Project Evaluation

Search Result 1,213, Processing Time 0.027 seconds

A Study on the Development and Evaluation of Partial Design Project for Computer Network Design Course Utilizing Software Simulator (소프트웨어 시뮬레이터를 활용한 네트워크설계 교과목의 요소설계 과제개발 및 평가에 관한 연구)

  • Choi, Dae-Woo
    • Journal of Engineering Education Research
    • /
    • v.15 no.2
    • /
    • pp.3-9
    • /
    • 2012
  • Normally, people think the results of engineering design project can be seen and be touched, however, it's not easy to develop such design subjects at IT related program. This matter turns into an initiative of Seoul Accord corresponding to the Washington Accord. In this paper, an engineering design project is developed from the lecture course that can hardly develop a touchable project due to the lack of expanse or the own characteristics of the course in the IT related program that follows the Washington Accord. An open-ended design project with the pre-defined design components and realistic constraints is developed for the Computer Network Design course. Each team consisted of 2 or 3 students performs the project for more than 5 weeks utilizing a software simulator, the Packet Tracer. In order to analyze the effectiveness, we have used various evaluation tools such as final presentation, peer evaluation, survey results, and mid/final exams. We concluded that the hard and soft skills of students have been improved considerably through the project.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

Evaluation of Health Benefit from the Environmental Health Action Program Based on the Environmental Burden of Disease (환경성 질병부담을 활용한 생활공감 환경보건기술개발사업 건강 편익 평가 및 제언)

  • Choi, Yongsoo;Byun, Garam;Lee, Jong-Tae
    • Journal of Environmental Health Sciences
    • /
    • v.48 no.2
    • /
    • pp.123-129
    • /
    • 2022
  • Background: The Environmental Health Action Program was a national project carried out from 2012~2021. It was aimed at developing public technologies to protect people's health from various environmental hazards. Objectives: One of the final goals of the project was "creating health benefits worth more than 179.2 billion won by reducing the environmental burden of disease." This study aims to evaluate whether the program sufficiently achieved the planned benefits. Methods: In order to secure consistency in evaluation, we applied the same equation used in the goal-setting process. It is comprised of six parameters to estimate the benefit: 1. The amount of medical expenses for environmental diseases; 2. The attributable proportion of environmental risk factors' 3. The rate of reduction in medical expenses for environmental diseases; 4. R&D project contribution; 5. The proportion of successful policy reflection; and 6. The contributions of the project. The corresponding variables were estimated at the end of the project, and the health benefits of the project were recalculated using the newly estimated variables. Results: It was estimated that a total of 195 billion won in health benefits occurred or will occur from 2015 to 2026. The main contributors for achieving the target were an increase in medical expenses for environmental diseases, a high score in the R&D project contribution, and the proportion of successful policy reflection. Conclusions: Technically, the equation used in the project is about medical expenses for environmental diseases rather than about the environmental burden of disease. There are several benefits of using the environmental burden of disease in the evaluation of public health policies. In further studies, developing a policy evaluation framework using indicators such as population attributable fraction would be needed.

Real-time Impact Evaluation of a Capacity-Building Health Project in Lao PDR

  • LEE, KYE WOO;KIM, TAEJONG
    • KDI Journal of Economic Policy
    • /
    • v.37 no.4
    • /
    • pp.75-88
    • /
    • 2015
  • This study presents a real-time impact evaluation of a human capacity-building health project in Laos, financed by a Korean aid agency and executed jointly by Laotian and Korean higher educational agencies. The project aims to improve the health status of Laotians by enhancing practicing doctors' clinical performance capacity, to be attained by advancing academic achievement at the University of Health Sciences (UHS) in Laos. Therefore, this real-time impact evaluation adopted the difference-in-differences regression analysis method, showing that the project improved the academic achievement of the UHS students who were taught by the project fellowship awardees more, compared to the UHS students who were taught by non-fellowship faculty members. It remains to be evaluated whether these UHS students taught by the project fellowship recipients would also perform better clinically in public hospitals in the future.

  • PDF

Development of An Interim Evaluation System for Integrated Rural Village Cluster Development Project (농촌마을종합개발사업의 효율적 추진을 위한 중간평가체계 개발)

  • Kim, Kyung-Ryang;Choi, Youn-Sang;Hong, Sung-Kyu
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.2 s.31
    • /
    • pp.65-73
    • /
    • 2006
  • This study attempts to develop an interim evaluation system for the Integrated Rural Village Cluster Development Project(IRVCDP) which can secure its identity and sustainability, and induce its early settlement, and to derive plans for its steady progress. The evaluation system consists of three levels. The highest-order level is evaluation purposes, which describe IRVCDP's goals. They are expansion of income bases(EIB), improvement of living environments(ILE), strengthening of regional capabilities(SRC) and constructing effective project operation system(CEPOS). The second level is evaluation items, which each characterize the relevant evaluation purposes. The last level is evaluation indices, which observe achievement f3r evaluation purposes. 22 evaluation indices are selected to satisfy the purposes of this study through a brainstorming process and a survey on opinions of experts for those evaluation purposes and evaluation items which are derived from analyzing the IRVCDP's properties. The relative importance of the evaluation indices selected are determined through the AHP analysis. The most intriguing result from the AHP analysis is that strengthening of regional capabilities is found to be the most important one among evaluation purposes. It can be said that this result is parallel to a ultimate goal of the IRVCDP.

Effect of Investment Evaluation Criteria of Public ICT Projects on Business Success (공공 정보통신기술(ICT)사업의 투자 평가기준이 사업성공에 미치는 영향)

  • Kim, Yong-Kul;Lee, Sang-Yun;Chae, Myeong-Sin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.4
    • /
    • pp.157-169
    • /
    • 2021
  • Establishing an investment evaluation system for public ICT projects is ultimately to increase the success rate of public ICT projects in which government finances are invested and to revitalize the projects, thereby establishing a foundation for national economic growth and enhancing the competitiveness of the global ICT industry. This study tried to empirically verify the effect of public ICT project investment evaluation factors established according to the existing evaluation system on actual project success, and to suggest directions for future investment evaluation factors. Five evaluation factors such as public interest, economic feasibility, technology, policy and budget efficiency were derived through prior research, and the effect of these evaluation criteria on actual project success was verified through questionnaires from experts who directly participated in the actual project. In addition, it was confirmed whether the government's support system had a moderating effect between the investment evaluation factors and the project success of the ICT project. The reliability and validity of measurement tools, structural model analysis, and path analysis were empirically analyzed, and the significance of existing ICT investment evaluation factors was verified.

A Freedom Inquiry Method by Revised Science Curriculum in 2007 (2007년 개정 과학과 교육과정에서 자유탐구 방안)

  • Lee, Yong-Seob;Park, Mi-Jin
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.3 no.1
    • /
    • pp.65-75
    • /
    • 2010
  • The purpose of this study is to present a Freedom Inquiry Method by Revised Science Curriculum in 2007. This study introduced IIM(Independent Inquiry Method), PBL(Problem Based Learning), Small Inquiry Method, Science Notebooks, Project Learning Method about Freedom Inquiry Method. The results of this study are as follows: First, IIM(Independent Inquiry Method) is studying method in the inquiry process center. The inquiry process is composed of total 9 phases, inquiry subject really it is, detailed aim deciding, information searching, it searches, quest result it arranges, aim evaluation, the report making, it announces, it evaluates, it is become accomplished. Second, It is a studying method which it starts with the problem which is Problem Based Learning, study atmosphere creation phase, problematic presentation phase and sleep static problem solving the phase which it attempts, it is become accomplished with autonomous studying phase, coordinated studying and discussion studying phase, discussion resultant announcement studying phase, arrangement and evaluation. Third, Small Inquiry Method, Call it accomplishes the call grade of the students among ourselves 4~8 people degree where only the quest learning capability is similar within class. Also interaction and coordinated function of the members between it leads and the subject which is given in the group it cooperates and it solves with it is a quest method which arrives to aim of commonness. This method divides on a large scale in three parts, it becomes accomplished in programming phase, quest accomplishment and resultant announcement. Fourth, Science Notebooks learns a scientific contents and a scientific quest function and the possibility of decreasing in order to be, from the fact that the help which it understands. This planing, data searching, it searches, becomes accomplished with resultant arrangement, announcement and evaluation. Fifth, The Project Learning Method the studying person oneself studying contents, it establishes a plan and it collects it accomplishes process of etc. it evaluates it leads and a subject and information and with real life it is a method which it studies naturally from the learning environment inside which is similar. This is preliminary phase, project start, project activity and project arrangement.

  • PDF

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

A Scheme of the defence project analysis and evaluation using a systems engineering process (시스템 엔지니어링 프로세스를 적용한 사전/사후분석 방안)

  • Min, Seong-Gi;Gwon, Yong-Su;Lee, Im-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.32-39
    • /
    • 2003
  • This work describes a study of analysis and evaluation activities applied systems engineering approach. It is presented technique of derivation and management requirement. A scheme of the defence project analysis and evaluation using a systems engineering process is described.

  • PDF

A Study on R&D Project Planning Selection Evaluation Indicators based on CIPP model (CIPP모형을 활용한 R&D과제기획 선정평가 도구 개발 연구 : K연구원 중심으로)

  • Hyun-Ku Min
    • Journal of Technology Innovation
    • /
    • v.31 no.3
    • /
    • pp.171-199
    • /
    • 2023
  • The purpose of this study was to develop an evaluation tool for selecting new projects for R&D project planning level of K Research Institute. For this purpose, items and questions for R&D project selection evaluation were developed based on the CIPP model and previous studies on selection evaluation and evaluation indicators for research project evaluation, and then two Delphi surveys were conducted. The developed evaluation tool was surveyed by 13 experts to verify contents validity ratio, convergence and consensus. The finally selected evaluation tool for R&D project planning consisted of 21 questions in 8 items, including 5 questions for context evaluation, 2 questions for input evaluation, 8 questions for process evaluation, and 6 questions for product evaluation. The evaluation tool developed will contribute to the solution of problems in the bottom-up planning process and to the improvement of the planning competence of the researchers. It will also contribute to improve the consistency and efficiency of evaluation during the selection process.