A housing project is very sensitive the changing environment. Therefor, a housing project is the high risk. Therefor in order to be succeed the project it becomes necessary to effectively manage the risk involved in the process of the housing project. This study analysed the risk factors that involved in the process of the housing project as compared with the precede research. The results of this research are as follows : First, complete feasibility study and verification with conviction in market and environment are required. And, securing organization and specificity for simulation and variation of environment are required in the process by step. And then, complaint and flaw are required in the final stage. The results of this study can be used as the guideline to make the risk management system for the housing project.
Journal of Information Technology Applications and Management
/
v.20
no.1
/
pp.107-132
/
2013
Project management is critical for the success of the large and complicated IT project. Accordingly, to improve the efficiency of the project management, operation of separate Project Management Office (PMO) organization is getting important. Despite the appreciation of PMO as necessary for project success, the result has not always been positive. In this respect, we intended to formalize the PMO success model by incorporating necessary factors related to PMO services and capabilities, and their relationship. Empirical testing results verified critical antecedents comprising PMO services, which included schedule, quality, budget and others. Furthermore, moderating impacts of PMO capabilities are quantitatively assessed. The research findings offer practical insights for successful management of PMO.
This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.
Journal of the Korean Institute of Rural Architecture
/
v.13
no.3
/
pp.53-60
/
2011
The purpose of this study was to propose the urban regeneration project model that reinforce public functions and contribute effectively to urban development. The results of this study were as follows. First, this study developed objective 22 different types of evaluation indexes. The indexes allows to figure out the necessities, business value and conditions of certain urban regeneration project. Second, the urban is divided to 6 types by characteristics of functionality and location. So, each regeneration project model can be applied to meet the condition of the urban.. Third, this study proposed 5 types of urban regeneration project model to fulfil roles of public and encourage the urban development. The urban regeneration project model is supposed to perform the evaluation of urban condition using the index, typological analysis under the law and scheme and analysis of function and urban location.
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.4
/
pp.89-97
/
2011
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
This study is aimed to analyze fishermen's perception and the economic feasibility of inland waters ranching project on the branches of Geum River. Analysis of fishermen's perception on the branches of Geum River showed that fishermen had an affirmative response on the inland freshwater ranching project related issues such as fisheries resources enhancement, necessity of project, economic achievement as so on. The model of inland waters ranching project on the branches of Geum River is designed to fisheries resources enhancement, habitat compositiom, ecology tours, use and management of resources. The results of the economic feasibility of inland waters ranching project on the branches of Geum River were internal rate of return (IRR) was 18.43%, a benefit-cost ratio was shown to be 1.54, net present value (NPV) was 4,929 thousand won, which indicates the economic feasibility of inland waters ranching project.
International conference on construction engineering and project management
/
2015.10a
/
pp.700-701
/
2015
Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.
Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.
Purpose: The purpose of this study is to find out the characteristics of service (landfill) costs (hereinafter, the "landfill costs") applied to the dissolution promotion committee and analyze the characteristics of landfill costs at the time where the dissolution of promotion body is increasing with the authority of the head of local government regarding the territory difficult with the continuous promotion by delaying or suspending the project for a prolonged period or suspending the project through the dissolution of the project body by the promotion committee and cooperative union since the flawless promotion of the maintenance project. Method: After revising the law in February 2012, the survey and analysis is made for the status of applying landfill costs and maintenance project scale of the dissolution promotion committee not confirmed in details around a total of 20 regions, including, 9 regions of redevelopment projects completed with the advance review, 7 regions of re-construction projects and 4 regions of urban environment maintenance projects from the total of 59 regions, Result: The influence on the landfill costs is shown to be greatest in the service expenses and management and supervision on this field has significance for the maintenance project perceived as private project, rather than public project, that the public management is neglected with insufficient presentation of operation criteria and so forth that it displays the tendency to lead to the discrete operation of the project body. In order to enhance the transparency of operating costs for the projects that are led by private capital, it is required to strengthen the role of public sector through enthusiastic intervention by the public sector in standardization of operation criteria, presentation of guideline and so forth.
One of the main concerns of the present age, is attending to the issue of sustainability that in recent decades, the concept of it has grown in terms of recognition and importance. Sustainability have defined further the development of the welfare and living standards of the present generation, without the lives of future generations is at stake. One of these tasks of the business is project management and today, "green or sustainable project management" as one of the most important global trends of project management have been identified. The issue of present study was to investigate the relationship of sustainability factors with success of a project. The population of the research consists of directors of oil and gas in the South Pars region including 150 people that according to Cochran formula, the number of samples were obtained 108 people. In this study, data collection was conducted based on a structured questionnaire that from a sample set of questions was used for sustainability impact on 6 scale of project management success. For this purpose, the whole five-item Likert has been used. Also for statistical analysis, PLS software was used. The results of path analysis at confidence level of 95%, showed a significant relationship exists between "sustainability factor" and "project success criteria." Since the correlation coefficient is positive, so this type of relationship is positive. Thus all the hypotheses at confidence level of 95 percent was confirmed and it became clear that there is a significant positive relationship between "sustainability factors" and "project success criteria."
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.