• Title/Summary/Keyword: IS 프로젝트 관리자

Search Result 397, Processing Time 0.029 seconds

Knowledge/Skills and Career Path of IS Project Managers (IS 개발 프로젝트 관리자의 지식과 기술 그리고 경력개발경로)

  • Moon, Yong-Eun
    • Information Systems Review
    • /
    • v.4 no.2
    • /
    • pp.343-360
    • /
    • 2002
  • Ideal project manager is a critical factor for successful IS development. The purpose of this paper is to investigate the knowledge and skills requirement of IS project managers and to suggest ideas of a career path development for powerful IS project managers. From a previous research work, this paper was conducted to classify 6 domains-strategic management, business function, innovation, general management, personnel management, and technical expert- as knowledge and skills of IS project managers, and to generate IS project manager's career path which is developed through engineer, analyst and designer, planner, and project leader. The results provide a good framework to train and develop knowledge and skills of IS project mangers.

A Study on the Effect of Project Managers' Leadership on Participants' Individual Competency and Project Performance (프로젝트 관리자의 리더십이 참여자 개인 역량과 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lee, Seol-Bin;Boo, Jeman;Kim, Seung-Chul
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.11 no.5
    • /
    • pp.175-188
    • /
    • 2016
  • This study is intended to look into the effects of project managers' leadership on participants' individual competency and project performance. To achieve this, a survey was empirically carried out to a sample of 276 researchers who are working on a project with a research and development group in private R&D centers. The results of this study were summarized as follows. First, the leadership competency of project managers had a significant positive effect on the individual competency of project participants. Second, the leadership competency of project managers had a significant positive effect on the project management performance. Third, the leadership competency of project managers had no significant effect on the project completion performance. Fourth, the individual competency of project participants had a significant positive effect on the project management performance. Fifth, the individual competency of project participants had no significant effect on the project completion performance. Sixth, the project management performance had a significant positive effect on the project completion performance. Seventh, the project completion performance was indirectly mediated in the effect of project managers' leadership competency on project completion performance. Eighth, the project management performance was indirectly mediated in the effect of project participants' individual competency on project completion performance. Based on the findings stated above, a combination of project management performance can generate better results in the effect of project participants' individual competency on project completion performance.

  • PDF

The Effects of Project Manager's Competencies on the Performance of NPD Project in Project Matrix Organization: Focused on the Institute of Technology of Company A (프로젝트 매트릭스 조직의 신제품개발 프로젝트에서 프로젝트 관리자의 역량이 성과에 미치는 영향 -A사 기술연구소를 중심으로-)

  • Yoon, In-Hwan;Kim, Joo-Hyun;Lee, Hee-Sang
    • Journal of Digital Convergence
    • /
    • v.13 no.10
    • /
    • pp.295-303
    • /
    • 2015
  • This paper is empirically to examine the effects of project manager's competencies (intellectual, managerial, and emotional competencies) on the performance for planning and outcome of NPD (new product development) project in project matrix organization. To achieve this purpose, we employ a field survey of project managers in project matrix organization and PLS (partial least square) structural equation modelling to test hypotheses of our research model. The results show that intellectual competency positively affect both of performances for planning and for outcome, whereas managerial and emotional competencies have not significant effect on them. Our attempt is to provide theoretical implications to current studies related to project management and helps for practitioners to develop a program for selecting and training capable and promising project managers.

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

The Effects of R&D Project Managers' Leadership on Product Development Performance: Focused on the Mediating Effects of Project Sponsor Roles (R&D 프로젝트 관리자의 리더십이 제품개발 성과에 미치는 영향: 프로젝트 스폰서 역할의 매개효과를 중심으로)

  • Lee, Rok;Jun, In-Sun;Park, Ju-Gyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.70-80
    • /
    • 2020
  • This study examined the effects of the R&D project managers' leadership on the product development performance. A survey was carried out empirically on a group of 175 experts associated with project management R&D operations in the field of manufacturing, construction engineering, shipbuilding, plant, and IT. The survey results showed that the effects of the R&D project managers' leadership on the product development performance were not significant, and the mediating effects of the project sponsor roles were significant. This means that the leadership of leaders, which requires efficient control and management based on complicated intergroup relationships and roles, is important in a project involving experts from the professional field. This suggests that the efficient leadership of leaders can improve the performance through the cooperation of members in the organization and aggregation of their core competencies in a limited time. Overall, the key results of this study mean that project leaders should play an active mediating role to maximize their leadership and enhance the role of project sponsors. In addition, the mediating role of project sponsors has an effect on the leadership of project managers, affecting the project performance quality.

Development of Design Collaboration Management System for Multiple Participants in Design Projects (설계프로젝트 참여자간 협업지원을 위한 설계협업관리 시스템 개발)

  • Lee, Jee-Hee;Yi, June-Seong;Shin, Seung-Woo;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.23-32
    • /
    • 2010
  • Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

A Study of Project Characteristics and Project Performance Level of difficulty (건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구)

  • Cho, Young-Seon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.78-88
    • /
    • 2010
  • Since the larger and complex construction projects are performed, project performance measurement is highlighting the importance to eliminate inefficiencies and plan to reasonable management practices. So many researchers are conducting research about the project critical sucess factor. But, these factors are mixed both management practices to improve performance and native project characteristics. Therefore performance measurement data couldn't apply to another project successfully. And the project characteristics affect project performance. But contractor couldn't change characteristics. This study provides a project characteristics's definition and classification. This study provides a quantitative level of performance improvement difficulty through out project manager survey. The contractor can estimate a level of performance difficulty through initial project information. With this, project contractor can more efficiently manage project.

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF