In this study, current sewer infiltration/Inflow(I/I) computation and application method was examined about improvement and adequacy relating to the main issues raised by the field for practitioners. The results of review about infiltration calculation method were considered to be in need of improvement at 'standards of minimum sewage calculation'. Furthermore, the results of review about I/I application method were considered to be in need of improvement at 'standards of seasonal infiltration application' and 'the relative decrease in the Annual evaluation standards'. In addition, annual I/I analysis at JC County for the four years(2009~2012) in respect of operation flow and rainfall data was conducted. The result of annual infiltration analysis, compared average daily sewage generated average infiltration rate was found in 21.95 %, infiltration by unit was found in $0.31m^3/day/cm/km$ and $0.12m^3/day/day$, respectively. The result of annual inflow analysis, average rainfall - Inflow equations was found $y=5.499{\times}$($R^2$ 0.793), and the average Inflow quantity by sewer extension was predicted to $0.66m^3/mm-km$.
This study has suggested the base data for decision of maintenance ranking and estimation of maintenance effect in the maintenance project of sewers as based on investigation of the defective rate in the sewer through Infiltration/Inflow(I/I) and CCTV analysis. It also analyzed the correlation between I/I and defective rate of sewer. As the result of this study, (1) Defective items of sewer was found out one item each 12.97m with an average. (2) By regression analysis, I/I has high correlation with defective rate of sewer like that $R^2$ is 0.7806. (3) The first thing in the item with bad influence on the I/I was joint badness and secondary was cross connection.
I/I(Infiltration/Inflow) characteristics should be studied to achieve I/I reduction which is a main object of sewer rehabilitation. However, The scientific and practical studies which are based on actual survey within the country are not thorough going enough. The earlier studies were limited because of a short research period and specific region. Thus, In this study, a formula is deduced by intensive correlation analysis between defective number and I/I volume in sewer pipe. It can be used as preliminary data when the project established for cost-effective pipe rehabilitation. The study shows that the researched region have a faulty point at every 9.3m on average and prove correlation between defective number and I/I volume in sewer pipes. Thus, this study can improve the investigation system and estimate the volume of the pipe rehabilitation, when site investigations for rehabilitation have been conducted.
The purpose of sewer system is to separate rain water from sewage water. Through this, it is possible to prevent the flood and preserve public water territory. For the past few years, many problems of the sewer system have been solved by the execution of sewer rehabilitation project. However, they still exist in sewer system caused by I/I, which are divided into infiltration and inflow. Infiltration means the rain water and underground water that infiltrate through breakage point on pipes, inflow means the water that flows in through misconnection on pipes. This study shows how the I/I calculation has changed according to the new standardized manual and identifies the I/I difference between the new calculation and the existing one. Through the analysis on the two calculation methods we examined the appropriacy of the new method by comparing it to the old one. The result points out that the new standardized manual is more appropriate than the old in aspect of objectivity and reproducibility(establish standardization), rationality(alteration of inflow unit).
The operation performance of sewer rehabilitation projects conducted with Build-Transfer- Lease contract in Korea will be evaluated using the index of infiltration and inflow (I/I). Though I/I obtained at the fourth year should be initially evaluated based on the I/I values observed for the previous three years after the completion of sewer construction, the concrete methodology have not been proposed to rely on the so called 'performance evaluation committee'. This study suggests two statistical methodology to evaluate the I/I performance; the confidence interval method and the hypothesis-testing method. Assumed ten I/I values in each year for 20 years are used in this study. Two cases are analyzed and compared; case I to use as control data all I/I values for all years obtained before the evaluation year and case II to use I/I values for only 3 years before the evaluation year. As a result, case II tends to have relatively higher scores than case I, reflecting the low mean I/I values at the initial years.
The purpose of this study was to analyze the effects of sewerage facilities through I/I analysis by rainfall by selecting areas where storm overflow diverging chamber is remained due to the non-maintenance drainage equipment when the sewerage system was reconstructed as a separate sewer system. Research has shown that wet weather flow(WWF) increased from 106.2% to 154.8% compared to dry weather flow(DWF) in intercepting sewers, and that the WWF increased from 122.4% to 257.6% in comparison to DWF in storm overflow diverging chamber. As a result, owing to storm overflow diverging chamber of partially separate sewer system with untreated tributary of sewage treatment plant, rainfall-derived infiltration/inflow(RDII) has been analyzed 2.7 times higher than the areas without storm overflow diverging chamber. Meanwhile, infiltration quantity of this study area was relatively higher than that of other study areas. Therefore, it is necessary to reduce infiltration quantity through sewer pipe maintenance nearby river. Drainage equipment maintenance should be performed not to operate storm overflow diverging chamber in order to handle the appropriate sewage treatment plant capacity for rainfall because it is also expected that RDII due to rain will occur after maintenance. In conclusion, it is necessary to recognize aRDII(allowance of rainfall-derived infiltration/inflow) and to be reflected it on sewage treatment plant capacity because aRDII can occur even after maintenance to the complete separate sewer system.
Choi Gye Woon;Lee Byung Joo;Chung Yun Jung;Lee Ho Sun
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.1323-1327
/
2005
도시에서 배출되는 오수나 우수를 모아서 하수처리장 또는 방류수역까지 유하시키는 역할을 하는 관거시설은 하수도 시설의 근간으로서 일반주민의 일상생활과 밀접한 관계가 있기 때문에 시설의 실태를 충분히 파악하여 적절한 유지관리를 시행하지 않으면 안된다. 그러나 지금까지 하수관거에 대한 인식부족으로 인하여 유지관리는 물론 현 실태 또한 제대로 인식 되지 않았다. 따라서 본 연구에서는 인천지역의 승기천 유역을 대상으로 I/I분석 및 예측, 이에 따른 오염 저감 방안을 연구하였다. 본 연구는 승기천 유역 내 주요지점에 대한 관거 I/I 및 하수의 누수량을 조사하기 위하여 고정식 4개 지점(풍림지점, 우성지점, 동막지점, 성주지점)에 대해 하수처리장의 유입수량 및 수질의 영향을 파악하고 해당지역의 관거 문제점을 도출하여 정비방향을 모색하고, 사업시행에 따른 효과분석에 활용하며 성과분석 목표를 수립하기 위한 기초자료를 제공하는데 연구 목적이 있다.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1410-1414
/
2006
Infiltration and Inflow(I/I) through the old or broken sewer are caused falling efficiency of sewage treatment plants. Recently, to solve these problems maintenance work of sewer pipes is progressing and sewer flow is metered for I/I survey. In this paper, metered sewer data at GyeongGi-Do H city for two years are analyzed by ToSS program. And this paper suggest particle use of sewer flow much data for many years.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.6
/
pp.7-14
/
2008
The main objective of sewer rehabilitation is to improve its function while eliminating inflow/infiltration (I/I). If we can identify the amount of I/I for an individual pipe, it is possible to estimate the I/Is of sub-areas clearly. However, in real, the amount of I/I for an individual pipe is almost impossible to be obtained due to the limitation of cost and time. In this study, I/I occurrence of each sewer pipe is estimated using AHP (Analytic Hierarch Process) and RPDM (Rehabilitation Priority Decision Model for sewer system) was developed using the estimated I/I of each pipe to perform the efficient sewer rehabilitation. Based on the determined amount of I/I for an individual pipe, the RPDM determines the optimal rehabilitation priority (ORP) using a genetic algorithm for sub-areas in term of minimizing the amount of I/I occurring while the rehabilitation process is performed. The benefit obtained by implementing the ORP for rehabilitation of sub-areas is estimated by the only waste water treatment cost (WWTC) of I/I which occurs during the sewer rehabilitation period. The results of the ORP were compared with those of a numerical weighting method (NWM) which is the decision method for the rehabilitation priority in the general sewer rehabilitation practices and the worst order which are other methods to determine the rehabilitation order of sub-areas in field. The ORP reduced the WWTC by 22% compared to the NWM and by 40% compared to the worst order.
This study was conducted to provide a basic information for the establishment of operation and treatment processes in sewer system of Nakdong river basin to minimize the overall pollutants loading to water body. Sewage flowrates were regularly measured and monitored at various sampling points of newly-built separated sewer system located in G City GA sites. To assess the inflow sewage flowrate, various calculating methods such as water-use evaluation, average-minimum daily flow quality evaluation, minimum daily flow evaluation, night water-use evaluation were used. Average I/Is were calculated except water-use evaluation. Average I/Is were found to be 6.5 $m^{3}/d$, 3.5 $m^{3}/d$, 7.7 $m^{3}/d$ at GA-1, GA-2, GA-3 points respectively. I/I ratios of three areas were found to be 4.8 %, 2.0 % and 2.7 % respectively and were obviously lower than those of the other separated sewer systems as shown in the previous studies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.