• Title/Summary/Keyword: Housing Project

검색결과 700건 처리시간 0.025초

바이커 집합주택(集合住宅)과 그 역사적(歷史的) 의미(意味)에 관한 연구 (The Byker Housing Redevelopment and Its Historical Meanings)

  • 최왕돈
    • 건축역사연구
    • /
    • 제6권1호
    • /
    • pp.81-90
    • /
    • 1997
  • The 1960s is a transitional era in the history of architecture. The Byker housing redevelopment project well reflects this situation, and is a good example of materialization of social pluralism and expressional needs of a community. Therefore it was investigated in order to see its meanings in the history of mass housing in the Western countries. The conclusions are as follows: It is the first large-scale project where the concept of user participation was sucessfully realized; It suggested various tools of desirable design methodology; It made a paradigmatic change from modernism to post-modernism in the history of contemporary mass housing projects.

  • PDF

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

주거부문(住居部門) BTL사업(事業)에서 프로젝트금용의 위험분석(危險分析)에 관한 연구(硏究) (on the Risk Analysis of Project Finance in BTL Project)

  • 송규열;정을규;임칠순
    • 한국주거학회논문집
    • /
    • 제17권6호
    • /
    • pp.83-90
    • /
    • 2006
  • The purpose of this study is to apply efficiently a successful Project Finance in BTL. To use Project Finance, it is necessary to Risk Analysis of each work step. This Risk Analysis have to repeatedly progress in overall Project Process. The differences between Corporate Finance and Project Finance are remarkably appeared in Risk Allocation and Limited Resource. To use successful Project Finance in construction industry, first, raising project confidence, second, technical : economical : lawful evaluation by Finance Expert, third, Income Guarantee for Lender or Consortium of Lending Banks, forth, Leverage Effect of Project Sponsor must be preceded.

일본 UR임대주택단지의 커뮤니티활성화 지원실태에 관한 고찰 (A Consideration of the Present Status of Support for Community Revitalization in the Japanese UR Rental Housing Complex)

  • 이수진
    • 대한건축학회논문집:계획계
    • /
    • 제36권3호
    • /
    • pp.103-111
    • /
    • 2020
  • This study aims to analyze community support methods and specific attainments of UR rental housing complex S in Japan and examine the present state of community formation.. UR rental housing S is part of the community revitalization support project launched by UR Urban Agency for creating exchanges among residents in the rental housing complex and in this study, the community support project from February to November 2013 was considered. As community revitalization support tasks, five types of events and exchange meetings were held. While the events and exchange meetings continued, even the residents who did not join the residents' association began to make an exchange with each other and their identity as residents enhanced, which means there was a change in the sense of community. Moreover, it is thought that a good solution to maintaining the chance for the events and exchange meetings after the support project is that residents of the younger generation actively cooperate in management as the residents' association members. 5 years after the support project, the present condition of activities of complex residents was examined, but the Residents' Association was disbanded due to the aging of residents, a growth in residents and low participation rates of the younger generation. Besides, there is a complete absence of community activities in the complex now.

ANALYSIS OF ENVIRONMENT-FRIENDLY BUILDING MATERIALS FOR AGED HOUSING REMODELING

  • Ki-Hyon Kim;Kyung-Rai Kim;Hee-Sung Cha
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.311-317
    • /
    • 2007
  • "Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Multi-housing residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling project is very unique in that building residents are selected prior to design phase. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.

  • PDF

사회취약계층 주택개보수사업 개선방향연구 - 전남지역의 농어촌주거를 중심으로 - (A Study on Home Improvement Policy for the Vulnerable Families - Focused on Jeonnam Area -)

  • 이재홍;천득염
    • 한국주거학회논문집
    • /
    • 제25권4호
    • /
    • pp.73-82
    • /
    • 2014
  • This study is to grasp the vulnerable families selected by the laws and qualification criteria on housing reformation and repair project of the Ministry of Land, Transportation and Maritime Affairs, the procedures of housing improvement projects, and the roles of superintendents, focusing on rural living and housing environment improvement. After the regional characters, housing style and structure of the recipients (the selected vulnerable families), and construction companies were closely examined by items and year, the results and problems of housing reformation and repair were diagnosed, compared and analyzed. On the basis of the results, the overall guidelines and directions of housing environment improvement for vulnerable families were suggested. Hopefully, these suggestions will be helpful for the kind of project in the future.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

프로젝트 관리가 공동주택 건설의 하자 발생에 미치는 영향: 프로젝트 매니저 경험의 조절효과를 중심으로 (Investigating the Impact of Project Management on Construction Defects in Housing Projects: With a Focus on Project Manager Experience)

  • 이영준;김승철;오민정;최성용
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.209-220
    • /
    • 2023
  • Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.

지속가능한 주거지 실현을 위한 계획적 고려사항 - 부산지역 '살고싶은 도시만들기' 실천사례 거주자 의견을 중심으로 - (A Study on the Planning Consideration for the Realization of Sustainable Housing - In the Aspect the Residents' Opinions at the Pilot Project 'Livable City Making' in Busan -)

  • 김묘정;정지석
    • 한국주거학회논문집
    • /
    • 제22권4호
    • /
    • pp.103-112
    • /
    • 2011
  • The purpose of this study was to determine the incomplete aspects of the government pilot project 'Livable City Making' Also, the study was conducted to consider a plan that residents will satisfy for the realization of the project. The study used a case study and a survey method in research process. For the case study, two projects in Busan that have similar planning were chosen. The contents of the survey included the residents' interest in their housing area, their recognition and opinions of the pilot project, their satisfaction about the environmental alterations, and their thought about conditions of sustainable housing. The main results of this study were as follows. First, the residents were satisfied with the alteration of the street space and the provision of green and open spaces. Meanwhile they revealed that the preservation of the natural environment and the vitalization of community are insufficient. Second, they also believed that the construction of the pedestrian streets, the provision of parking lots, and the remodeling of the deteriorated buildings are incomplete. Third, the residents believed that the following provisions need to be made for successful sustainable housing waste discharge needs to be minimized, facilities need to be used for saving energy, opportunities for employment need to be provided within their housing areas, and safe street spaces and comfortable traffic systems need to be provided.

Lessons of Incremental Housing Two Chilean Case Studies: Elemental Lo Espejo and Las Higuera

  • Marinovic, Goran Ivo;Baek, Jin
    • Architectural research
    • /
    • 제18권4호
    • /
    • pp.121-128
    • /
    • 2016
  • Low-income housing policies in South Korea have been pursued mostly by providing public rental housing for less privileged social groups. In contrast to this notion of housing, this article argues for housing ownership by low-income families. Two examples of this ownership policy are found in Chile. Incremental housing involves an open-ended housing platform, which requires home-dwellers to complete the construction process themselves. This article aims to examine structural, spatial and formal characteristics of the incremental housing projects. Taking the perspective of the home-dweller during the incremental construction process, we evaluate the houses before and after customization. Thus, we use data from field-work conducted for seven months in the Santiago Metropolitan Area of Chile. Using qualitative methods such as observation, semi-structured interviews, and surveys we focus on the Elemental Lo Espejo incremental housing project and then compare it with the Las Higuera housing project. The latter is representative of the incremental houses delivered by the Chilean government. In comparing these two projects, we aim to articulate the lessons of incremental housing with the intention of suggesting possible future developments for a wider-reaching incremental housing program.