Abstract
The purpose of this study was to determine the incomplete aspects of the government pilot project 'Livable City Making' Also, the study was conducted to consider a plan that residents will satisfy for the realization of the project. The study used a case study and a survey method in research process. For the case study, two projects in Busan that have similar planning were chosen. The contents of the survey included the residents' interest in their housing area, their recognition and opinions of the pilot project, their satisfaction about the environmental alterations, and their thought about conditions of sustainable housing. The main results of this study were as follows. First, the residents were satisfied with the alteration of the street space and the provision of green and open spaces. Meanwhile they revealed that the preservation of the natural environment and the vitalization of community are insufficient. Second, they also believed that the construction of the pedestrian streets, the provision of parking lots, and the remodeling of the deteriorated buildings are incomplete. Third, the residents believed that the following provisions need to be made for successful sustainable housing waste discharge needs to be minimized, facilities need to be used for saving energy, opportunities for employment need to be provided within their housing areas, and safe street spaces and comfortable traffic systems need to be provided.