Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
Proceedings of the Korea Concrete Institute Conference
/
2003.05a
/
pp.197-203
/
2003
Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.22
no.12
/
pp.1191-1198
/
2012
Highway traffic noise is the one of the most frequent pollutant source of environmental claims in Korea for the last 10 years. For abating the noise from the highways, characteristics of highway noise source should be investigated and identified before performing the abatements. Highway noises are affected by traffic volume, vehicle types and speed, tyre and pavement types. In this study, highway noises which measured from different pavements have been analyzed and compared. Especially, the noise from the asphalt concrete pavement, cement concrete pavement and low-noise pavement have been measured simultaneously at the same traffic condition and compared each other. Hopefully, the data of the study may be used for abating highway noise and further studies.
PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.
PURPOSES: The new methodology is proposed for estimation of long-term performance and pavement life based on the national highway database in Daejeon area. Furthermore, this study tried to verify the applicability of performance estimation using NHPCI (National Highway Pavement Condition Index) on tendency of pavement deterioration as time goes by under Korean road environments. METHODS: Reliability theories are applied to estimate the mean life and to determine the appropriate distribution using 3 levels of traffic loads (high, medium, low) based on maintenance and rehabilitation history data for 15 years. RESULTS: As a result, Lognormal distribution is suitable for explanation of pavement lifetime in Daejeon area regardless of traffic loads. In addition, we found that the results of mean life and maintenance timing based on NHPCI for the pavement sections of 3 levels of traffic loads are available. CONCLUSIONS: Based on this study, it was found that mean life of high, medium and low levels of traffic loads are about 8.1 years, 12.2 years and 12.7 years, respectively. Higher level of traffic loads shorten the pavement mean life.
PURPOSES : The purpose of this study is to analyze the performance life of hot central plant recycling (HCPR) and hot in-place recycling (HIR) pavements applied to the National Highway for the past 20 years and compare it with conventional hot-mix asphalt (HMA) pavement. METHODS : In order to analyze the performance life of recycling asphalt pavements, a comprehensive literature review was conducted to investigate the government law and official system for the use of recycling asphalt pavement in Korea and foreign countries. Next, the application information of using a hot central plant recycling and hot in-place recycling pavements in the national highway is collected from the database of pavement management system (PMS) and then their field condition is visually surveyed. Finally, the performance life of recycling asphalt pavements in the national highway is analyzed and compared with conventional hot-mix asphalt pavement. RESULTS :Institutions are encouraging the promotion of using recycled asphalt pavement through various legal systems in Korea as well as abroad. Based on analysis results for the average performance life of hot central plant recycling pavement applied to the national highway, the average performance life is estimated to be 10.2 years. However, the average performance life of in-place recycling pavement is estimated to be 6.5 years. However, it is expected to increase performance life after the HIR construction system is modified. CONCLUSIONS : Based on the limited data analysis of the performance life of recycled asphalt pavements, HCPR shows similar performance life to conventional asphalt pavement but HIR shows shorter performance life than conventional asphalt pavement. However, it is noted that all performance life data is very limited and it should be monitored and analyzed further.
Proceedings of the Computational Structural Engineering Institute Conference
/
1991.04a
/
pp.26-28
/
1991
In the recent years, a rigid pavement composed of a flat concrete slab has ken constructed due to the desirable structural strength of concrete, durability and economy. However, despite of precise design and construction of concrete highway pavement, some sections of the 88 Olympic express highway, Jung-bu express highway, and Kyung-bu express highway, which have shown premature cracking, faulting, and pumping before the end of their intended service life, have already been viewed with great concerns by highway officials and engineers. Since environmental variations and traffic loads might be considered as major factors to cause pavement failure problems, the thermal load due to temperature variations between top and bottom surface of the concrete slab was highlighted to verify analytical behavior of concrete slab using the finite element method.
Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
International Journal of Highway Engineering
/
v.11
no.2
/
pp.37-44
/
2009
Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.
PURPOSES : This study aims to evaluate the performance of interlocking block pavement system for low speed highway. METHODS : Through on-site monitoring, environmental impact assessment of interlocking block pavement such as heat island reduction, traffic safety, noise pollution were evaluated as compared with asphalt pavement. Also the pavement condition and roughness were evaluated according to performance period. RESULTS : Surface temperature of interlocking block pavement was about 7 degree lower than asphalt pavement in midsummer. Compared to asphalt pavement, vehicle speed reduction effect of interlocking block pavement was about 2kph. For low speed driving, the noise pollution was measured at a similar level for both asphalt and interlocking block pavement. After 42month service period, the breakage of block was only 0.24% for the whole surveyed area. IRI of interlock block pavement was estimated within the range of 5~8m/km. CONCLUSIONS : Depending on the performance monitoring results such as heat island reduction, providing traffic safety and keeping a good pavement condition for a long service period, it assures that interlocking block pavement was applicable for low speed road.
International Journal of Concrete Structures and Materials
/
v.1
no.1
/
pp.75-81
/
2007
The concrete pavement of the Seohae Highway in Korea has suffered from serious distress, only four to seven years after construction. Deterioration due to Alkali-Silica Reaction (ASR) has seldom been reported per se in Korea, because the aggregate used for the cement concrete has been considered safe against alkali-silica reaction so far. The purpose of this study is to examine the deterioration caused by an alkali-silica reaction of concrete pavement in Korea. The investigation methods included visual inspection and Automatic Road Analyzer (ARAN) analysis of surface cracks, coring for internal cracks, stereo microscopic analysis, scanning electronic microscope (SEM) analysis, and electron dispersive X-ray spectrometer (EDX) analysis. The results are presented as follows: the crack pattern of the concrete pavement in Korea was longitudinal cracking, map cracking or D-cracking. Local areas of damage were noticed four to five years after construction. The cracks started from edges or joints and spread out to slabs. The most intensive cracking was observed at the intersection of the transverse and longitudinal joints. Where cracking was the most intense, pieces of concrete and aggregate had spalled away from top surface and joint interface area. The progress of deterioration was very fast. The reaction product of alkali-silica gel was clearly identified by its generally colorless, white, or very pale yellow hue seen through a stereo optical microscopy. The typical locations of the reaction product were at the interface between aggregate and cement paste in a shape of a rim, within aggregate particles in the cracks, and in the large void in the cement paste. Most of the white products were found at interface or internal aggregates. SEM and EDX analysis confirmed that the white gel was a typical reaction product of ASR. The ASR gel in Korea mainly consisted of Silicate (Si) and Potassium (K) from the cement. The crack in the concrete pavement was caused by ASR. It seems that Korea is no longer safe from alkali-silica reaction.
PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.