• Title/Summary/Keyword: High-speed rail

Search Result 817, Processing Time 0.025 seconds

Optical System Implementation of OFB Block Encryption Algorithm (OFB 블록 암호화 알고리즘의 광학적 시스템 구현)

  • Gil, Sang-Keun
    • Journal of IKEEE
    • /
    • v.18 no.3
    • /
    • pp.328-334
    • /
    • 2014
  • This paper proposes an optical encryption and decryption system for OFB(Output Feedback Block) encryption algorithm. The proposed scheme uses a dual-encoding technique in order to implement optical XOR logic operation. Also, the proposed method provides more enhanced security strength than the conventional electronic OFB method due to the huge security key with 2-dimensional array. Finally, computer simulation results of encryption and decryption are shown to verify the proposed method, and hence the proposed method makes it possible to implement more effective and stronger optical block encryption system with high-speed performance and the benefits of parallelism.

A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions (발파진동 제어에 의한 특수구간 터널굴착에 관한 연구)

  • Choi, Hyung-Bin;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

The Effects of Partially Premixed Pilot Injection Timing on the Combustion and Emission Characteristics in a Common Rail Diesel Engine (커먼레일식 디젤기관의 부분 예혼합 분사시기가 연소 및 배기특성에 미치는 영향)

  • Yoon, Sam-Ki;Choi, Nag-Jung
    • Journal of Power System Engineering
    • /
    • v.17 no.6
    • /
    • pp.18-24
    • /
    • 2013
  • An experimental study was performed to investigate the characteristics of combustion pressure and exhaust emissions when the pilot injection timing and EGR rate were changed in a CRDI 4-cylinder diesel engine. The pilot injection timing and EGR rate have a significant impact on the combustion and emission characteristics of diesel engine. In this study, the pilot injection timing and EGR rate variation were conducted to 2000rpm of engine speed with torque 50Nm. Combustion pressure and heat release rate were decreased under high EGR rate conditions but increased under the pilot injection timing $20^{\circ}$(BTDC). IMEP and the maximum pressure in cylinder(Pmax) were decreased under the same injection timing with the increase of EGR rate. The NOx emission was decreased with increasing the EGR rate. On the other hand, in the same injection timing conditions, CO, HC, $CO_2$ emissions were increased with increasing the EGR rate.

Study on Smart Seat Technology for Railroad Vehicles Using Piezoelectric Sensors (압전소자를 이용한 철도차량용 스마트 좌석 기술 적용성 검토)

  • Kang, Donghoon;Kim, Heon-Young;Kim, Dae-Hyun
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.34 no.5
    • /
    • pp.390-396
    • /
    • 2014
  • A study on smart seats for railroad vehicles was conducted using piezoelectric (PZT) sensors. For this purpose, the concept of passenger friendly smart seats was defined, and a PZT sensor was selected as the optimum sensor based on this concept. Using PZT sensors, simulation tests were performed using a sub-scale model railroad vehicle. In these tests, the main functions of the smart seats were extracted and simplified to improve the effectiveness of the simulation tests. Based on the test results, the system for smart seats proposed in this paper was successfully verified using PZT sensors and the dedicated operation software for the system. This paper will contribute to the improvement of services in high-speed rail systems through advances in ticket checking tasks.

Foot Strike Simulation by a Slider Type Mechanical Model (미끄럼형 기계적 모델에 의한 디딤동작의 시뮬레이션)

  • Park, Hae-Soo;Shon, Woong-Hee;Yoon, Yong-San
    • Journal of Biomedical Engineering Research
    • /
    • v.10 no.3
    • /
    • pp.269-278
    • /
    • 1989
  • The initial impact at foot strike is produced by a slider type mechanical model, which can be measured using a force platform to evaluate various shoes. The lower extremity and foot motion was filmed by a 16mm high speed movie camera and several points on the rear half of the shoe and those near the trochanter and the lateral epicondyle were digitized to provide the linear and angular positions and velocities during impact. With these observed kinematics, a slider type foot strike simulator composed of guide rail and sliding dummy is designed. The simulator system makes the artificial foot of the dummy with running shoe on it to follow the foot strike motion. The dummy has the relevant mass-spring-damper system modeled after McMahon's. The motion of the model is drived by the gravity force and the generated motion alone with the ground reaction forces are monitored by the same procedures afore mentioned producing the initial foot strike impact similar to the onto observed in human gait.

  • PDF

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

Overview of PI Systems in the United States and its Application to Korea (미국의 PI제도 및 국내도입 방안)

  • Kim, Tae-Wan;Yun, Seong-Soon;Kwon, Young-In
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.57-64
    • /
    • 2005
  • Recently, several national construction projects such as Chunsung Mt. section of Kyungbu High Speed Rail or Sapae Tunnel of Seoul Outer Ring Road have been delayed or suspended due to the objections of residents or environmental organizations. Considering the development of democracy, increased public participation and interests on environmental issues in Korea, the generation of these social conflicts may be natural phenomenon. However, it is necessary to find measures to effectively implement major construction project and save costs related to social conflicts. In this paper, PI techniques in the United States are investigated and in comparison, the weakness and improvement plans for Korea's current public participation system have been suggested.

Effect of shale or mica schist on slope stability (셰일 및 운모편암의 사면안전성에 미치는 영향)

  • Lee, Byung-Joo;Shin, Hee-Soon;SunWoo, Choon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1-11
    • /
    • 2006
  • To be design the slope, the area distributed the shale or mica schist which was metamorphosed by shale must carefully consider the stability. The shale has the detrital materials of which the grain size are 1/256mm and fissility. As the reason the slope of shale is always unstable by bedding slip and fissility but also the joint and fault. Mica schist is also another unstable rock for slope by schistosity, cleavage, axial plane of a fold etc. In general shale and mica schist contain the swelling clay minerals such as smectite, vermiculite and montmorillonite. These minerals make the slope unstable. At OO tunnel construction area for the rail way of the Kyungbu high speed train, the slope of mica schist is very unstable by the distribution phenomena of the discontinuous plane such as joints which are 1-5cm spacing and thrust and strike-slip fault. By the drilling core of this area, most RQD have 0-20%.

  • PDF

Future Northeast Asia Transport and Communications System

  • Rimmer, Peter J.
    • Journal of Korea Port Economic Association
    • /
    • v.17 no.2
    • /
    • pp.1-28
    • /
    • 2001
  • Korea has been at the forefront of efforts to enhance international cooperation in transport and communications within Northeast Asia. This effort is driven not only by the benefits that could accrue to the Korean Peninsula but also to all nations in the region. Mutual cooperation within Northeast Asia would reduce transport and communications costs and provide the basis for a regional transport and logistics network. Before progress can be made towards an integrated transport and communications system in Northeast Asia, however, there is a need to evaluate its prospects, outline a visionary plan, and detail a preferred strategy. The strategy to develop the Korean Peninsula as the gateway for Northeast Asia should harmonize with the region's common transport (and communications) policy The strategy adopted by South Korea is focused primarily on the development of an improved logistics infrastructure that would be extended to North Korea upon reunification. The seaport and airport developments In Korea will have to be supported by improved access to planned high-speed railways, expressways and freight distribution centers that, in turn, are to be integrated with new telecommunications and computer technologies. The benefits from these improvements will be lost unless existing government monopolies controlling seaport, airport, rail, road and expressway developments are commercialized to ensure that the price of transport reflects its actual cost. Technical harmonization between different modes should be promoted to facilitate efficient intermodal transport between the Korean Peninsula and the rest of Northeast Asia.

  • PDF

Test and analysis of settlement pattern of trackbed during pipe roof excavation (각관 추진 굴착시 궤도노반의 침하경향 실험분석)

  • Jung, Kwan-Dong;Eum, Ki-Young;Choi, Chan-Yong;Jo, Su-Ik;Hwang, In-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.895-902
    • /
    • 2010
  • The method in a bid to make better use of limited urban space amidst increasingly expanding urban area have been attempted in various ways. Efficient using underground space is one of the examples. The pipe roof and excavation for underground crossing implemented in this study was the part of evaluation of such attempt. However, the pipe roof method for underground crossing may cause the ground surface to be uplifted or settled down, having effect on structure above the ground. Thus in this study, a laboratory model test designed to evaluate the effect on surface during implementing pipe roof and excavation was carried out. The ground displacement during pipe roof advancing and excavation is usually occurred in a radial shape but as the study focused on trackbed, the evaluation included ground settlement only. Thus, appropriately-scaled model was selected considering domestic geological characteristics and operation characteristics of traditional and high-speed rail trains and the qualitative evaluation of displacement was carried out with a certain ground loss depending on excavation after categorizing trackbed settlement pattern depending on depth of top soil.

  • PDF