• Title/Summary/Keyword: High-rise complex

Search Result 300, Processing Time 0.028 seconds

A MULTI-STORY FIRE IN HIGH-RISE APARTMENT BUILDING DEVELOPED THROUGH BALCONIES - INVESTIGATION AND EXPERIMENTS -

  • Hasemi, Yuji;Hayashi, Yoshihiko;Hokugo, Akihiko;Yoshida, Masashi
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 1997.11a
    • /
    • pp.361-368
    • /
    • 1997
  • Summary of experiments for the investigation of a fire which caused an upward fire spread for over 12 floors through balconies in a high-rise apartment complex is reported. The experiments include indoor tests to obtain fire properties of vertical PMMA fences and outdoor ones with a full scale model of the balcony. The test results suggest significance of the increase of total flame height by the merging of flames and a cooperative effect of the burning of the PMMA fence and combustibles on the balconies for the generation of a tall flame enough to cause ignition on the upper floors.

  • PDF

Application of Hybrid Seismic Isolation System to Realize High Seismic Performance for Low-rise Lightweight Buildings (저층 경량건물의 고성능 내진을 위한 복합면진시스템의 적용)

  • Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.4 no.2
    • /
    • pp.185-192
    • /
    • 2013
  • This study presents application effects of hybrid seismic isolation system to realize high seismic performance for low-rise lightweight buildings through a non-linear analysis and onsite experiments. The complex seismic isolation system applied in this study is a method of mixing sliding bearing and laminated rubber bearing in order to overcome limitation of laminated rubber bearing in increasing natural period of the whole seismic isolation system. As a result of the non-linear analysis, seismic isolation buildings designed with complex seismic isolation system are safe because its maximum response displacement is within allowable design displacement even for a strong earthquake which rarely occurs and its maximum response shear is less than design seismic force. As a result of the onsite experiment, the rigidity of seismic isolation stories corresponds to approximately 95.8% of the design equivalent stiffness value. This indicates that actual properties of the whole seismic isolation system correspond to design values.

An Introduction to Application of High Strength Concrete for the Construction of High Rise Complex Structure (초고층 주상복합구조물에 적응한 고강도 콘크리트의 사례)

  • Kim, Dong-Seok;Park, Sang-Jun;Won, Cheol;Lee, Sang-Su;Kim, Yeong-Jin
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.5
    • /
    • pp.54-58
    • /
    • 2002
  • 대도시의 인구집중에 따라 토지의 고도이용을 위하여 건물의 고층화 및 복합화에 대한 요구가 점점 더 높아지고 있으며, 도심지에서의 삶의 질을 윤택하게 하기 위한 방법으로서 조망에 대한 욕구가 더 한층 중요시되고 있다. 이러한 이유로 인해 주거용 아파트에도 초고층 빌딩 개념이 도입되고, 상가 및 커뮤니티 시설 등이 추가되는 주상복합건물의 건설이 증가하는 추세에 있다.(중략)

A Study on the Fire Safety Design of High-Rise Apartment Housing in Korea (초고층 아파트의 화재안전계획에 관한 연구)

  • 최인석;박윤성
    • Fire Science and Engineering
    • /
    • v.5 no.1
    • /
    • pp.15-22
    • /
    • 1991
  • After the appearance of apartments in Korea, Apartment Housing has been generally accepted for its high capacity of population and convenience in the management. Nowadays, apartments have become higher, larger and more complex than ever before, showing abrupt changes in structure, form and mechanical systems. Likewise, the hazards of fire and the scale of fire losses have become a serious problem. Therefore. considerations of fire safety have taken a greater portion in the design of Apartment Housing. This study is focused particulary on spatial planning rather than on mechanical systems for fire safety.

  • PDF

Displacement Response Properties of Spatial Structures and High-Rise Buildings According to the Change of TMD Mass (TMD 설치 질량 변화에 따른 대공간 구조물과 고층건물의 변위 응답 특성)

  • Lee, Young-Rak;Kim, Hyun-Su;Kang, Joo-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.20 no.3
    • /
    • pp.107-116
    • /
    • 2020
  • In this paper, the displacement response to seismic loads was analyzed after installing TMD in spatial structures and high-rise buildings. In the case of a spatial structures, since it exhibits complex dynamic behavior under the influence of various vibration modes, it is not possible to effectively control the seismic response by installing only one TMD, unlike ordinary structures. Therefore, after installing eight TMDs in the structure, the correlation between displacement response and mass ratio was examined while changing the mass. The TMD must be designed to have the same frequency as the structure frequency so that the maximum response reduction effect can be exhibited. It can be confirmed that the most important variable is to select the optimal TMD mass in order to install the TMD on the structure and secure excellent control performance against the earthquake load. As a result of analyzing the TMD mass ratio, in the case of high-rise buildings, a mass ratio of 0.4% to 0.6% is preferable. In spatial structures, it is desirable to select a mass ratio of 0.1% to 0.2%. Because this study is based on the theoretical study based on numerical analysis, in order to design a TMD for a real structure, it is necessary to select within a range that does not affect the safety of the structure.

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

A Study on the Planning Direction for Social Communication in a High-density Residential Environment (고밀 주거환경에서의 사회적 소통을 위한 계획 방향 연구)

  • Lee, Jae-Young;Jeon, Yong-Han
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.1
    • /
    • pp.73-80
    • /
    • 2022
  • The purpose of this study is to present the direction of the plan to transform the residential complex into a space that can provide an open residential environment that can lead to social communication and exchange without being closed to the urban residential environment, especially in the apartment complex environment, which is becoming more dense. As a result of the Openness analysis of the 'Codan Shinonome Canal Court', the overall accessibility was good in terms of space utilization, and the openness was low in terms of the spatial composition, which is a physical environment due to the dense block type. When looking at the overall openness of the Codan Sinonome complex in terms of analysis by block, the corrected openness index (C.O.I) for all six blocks was 0.245, the corrected accessibility index (C.A.I) was 1.447 and the openness composite index (O.C.I) was assessed at 1.692. This was due to the formation of high-density block-type urban dwellings and the introduction of S-shaped streets and the layout of low-rise urban support facilities and commercial facilities. The Codan Sinonome Canal Court, which is considered an "open city residence," quantitatively confirmed that it embodies macro-space structure and human-scale space environment even in high-precision environments.

The Comparison of Using State of Greenery Space in Front of One Story Veranda in Apartment Complex (아파트 단지 1층 베란다 앞 녹지공간 사용실태 비교)

  • Kim, Dae-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.2
    • /
    • pp.1-9
    • /
    • 2000
  • Recently, the number of unsold apartments has been increasing, and apartment furnishing companies have tried a marketing strategy by utilizing the outdoor space for differentiation. There are many differentiation strategies. One of them is to improve the dwellings-on-ground space in apartment complex. Owing to the high density and high-rise of apartment buildings, the dwellings-on-ground apartment complex have been recognized as not good housing by residents in korea. The precedent study on the responses from residents showed the negative effects mainly due to sunlight, daylight, view and privacy and the positive effects from good accessibility and good environment for children and elderly people. The purpose of this study was to improve the dwellings-on-ground space and to suggest the most appropriate type of the dwellings-on-ground space through the residents' desires and preferences. In this point of view, this study shows three results for the design improvement: 1) Providing private gardens and individual accesses to the dwellings-on-ground. 2) Providing private garden with flower bed to intensify the visual aspect. 3) Furnishing variable transformation of unit plan in dwellings-on-ground, for example, maisonette, etc.

  • PDF

On the Initial Plans (1959) of UNESCO House in Seoul, Korea by Kuzosa Architects & Engineers (구조사건축기술연구소의 유네스코회관 초기 계획안(1959)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-Hyung;Lee, Sumin
    • Journal of architectural history
    • /
    • v.31 no.2
    • /
    • pp.35-50
    • /
    • 2022
  • This study examines the design intent and the construction background of the UNESCO House in Korea planned in the 1950s, with a focus on the initial plans of the House by Kuzosa Architects & Engineers in 1959. To this day, the House has been evaluated as a representative example of an office building in the 1960s, and an early case of introducing curtain walls in Korea. However, only its technical characteristics have been explored with less emphasis on further research data. This study attempts to demonstrate the social and cultural expectations and the demands of the construction of the House by examining the documents produced at the time and the initial plan. This study also highlights the fact that the House was the first project of the architect Pai Ki Hyung to realize high-rise reinforced concrete construction in Seoul's dense center. In the 1950s, the House was planned as a modern building with a complex of various cultural facilities and offices due to the character of activities of the Commission, and the lack of public cultural facilities in Korea. The plan of the Kuzosa Architects & Engineers was selected through a design competition held in 1959. The House was completed in 1967, which took about eight years from planning to completion with design modification in the 1960s. The initial plan submitted before the design modification shows that Pai used the vocabulary and logic of modern architecture and planned the House not as a simple office building but as a complex cultural facility.