Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.47-54
/
2004
Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.
Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.
Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.9-10
/
2012
According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.21-22
/
2011
Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.
Kim, Taehoon;Lim, Hyunsu;Kim, Chang-Won;Kim, Seung Woo;Cho, Hunhee;Kang, Kyung-In
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.260-261
/
2017
The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.05b
/
pp.97-98
/
2011
The number of high-rise buildings has increased year after year, with there currently being 5 projects in progress to construct buildings higher than 100 stories in Seoul alone. The construction cost for such high-rise buildings is significantly higher than the cost for a conventional low-rise building, while maintenance costs are expected to be two to three times higher. To reduce the maintenance cost of a high-rise building, there is the need for a guide rail to be used for maintenance, which is why there is the need for research on the guide rail system. For this reason, as preliminary research to develop a guide rail, this study aims to derive the factors increasing construction cost by taking the installation of a guide rail into account. This is expected to lay the groundwork for the design and construction of guide rails for high-rise building maintenance.
High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.
At the economical crisis of Korea in 1997, self-determined price for apartment and the revision increasing the ratio of residential area for mixed-use residential building were introduced to activate the construction industry, which causes construction companies to build super high rise apartment discriminative and high class orientated. This study aims to classify the super high rise building which is planned to build or built recently and to analyze the architectural characteristics. The objects are 288 unit households in 26 apartment complexes higher than twenty five story since 1998. As a result, super high rise building comparing with existing apartments were being varied in plan types of main building and unit household and in construction types. As for the plan, the number of walls having opening to outdoor were increased and it is considered that high rise building can take advantage of a view, lighting and sunshine. The location of living room that used to be in the center of unit in existing apartment was moved freely without rule.
Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.1
/
pp.465-469
/
2006
In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.
Journal of the Korea Institute of Building Construction
/
v.9
no.2
/
pp.93-101
/
2009
Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.