• Title/Summary/Keyword: High-Rise Construction

Search Result 1,008, Processing Time 0.033 seconds

A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation (이산형 시뮬레이션을 사용한 초고층건물공사 작업원의 수직이동계획)

  • Ahn Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.47-54
    • /
    • 2004
  • Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Comparative Study of Strength and Weakness of System Form in High-rise Building Project (초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

Applicability Analysis of Photovoltaic System in the Construction Phase of High-rise Buildings (초고층 건축물 시공단계를 위한 태양광시스템의 적용성 분석)

  • Kang, Go-Une;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.21-22
    • /
    • 2011
  • Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.

  • PDF

A Preliminary Study to Apply Group Control System to Lifts for High-rise Construction (초고층 공사 리프트의 그룹제어 시스템 적용을 위한 기초 연구)

  • Kim, Taehoon;Lim, Hyunsu;Kim, Chang-Won;Kim, Seung Woo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.260-261
    • /
    • 2017
  • The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.

  • PDF

Analysis of Factors Increasing Construction Cost for the Curtain-wall Accompanied by the Installation of a Guide Rail for High-rise Building Maintenance (초고층 외벽 유지관리용 Guide Rail 설치에 따른 커튼월 공사비 증가요인 분석)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.97-98
    • /
    • 2011
  • The number of high-rise buildings has increased year after year, with there currently being 5 projects in progress to construct buildings higher than 100 stories in Seoul alone. The construction cost for such high-rise buildings is significantly higher than the cost for a conventional low-rise building, while maintenance costs are expected to be two to three times higher. To reduce the maintenance cost of a high-rise building, there is the need for a guide rail to be used for maintenance, which is why there is the need for research on the guide rail system. For this reason, as preliminary research to develop a guide rail, this study aims to derive the factors increasing construction cost by taking the installation of a guide rail into account. This is expected to lay the groundwork for the design and construction of guide rails for high-rise building maintenance.

  • PDF

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

Analysis on the Architectural Characteristics of Super High Rise Apartments (초고층 공동주택의 건축적 특성 분석)

  • Park, Hyeon-Ku;Song, Hyuk;Go, Seong-Seok
    • Journal of the Korean housing association
    • /
    • v.18 no.1
    • /
    • pp.11-18
    • /
    • 2007
  • At the economical crisis of Korea in 1997, self-determined price for apartment and the revision increasing the ratio of residential area for mixed-use residential building were introduced to activate the construction industry, which causes construction companies to build super high rise apartment discriminative and high class orientated. This study aims to classify the super high rise building which is planned to build or built recently and to analyze the architectural characteristics. The objects are 288 unit households in 26 apartment complexes higher than twenty five story since 1998. As a result, super high rise building comparing with existing apartments were being varied in plan types of main building and unit household and in construction types. As for the plan, the number of walls having opening to outdoor were increased and it is considered that high rise building can take advantage of a view, lighting and sunshine. The location of living room that used to be in the center of unit in existing apartment was moved freely without rule.

Driving Burj Dubai Core Walls with an Advanced Data Fusion System.

  • Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.465-469
    • /
    • 2006
  • In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.

  • PDF

The analysis of defects types and patterns in high-rise residential buildings (초고층 주상복합 건물의 하자 발생 유형 및 분석 연구)

  • Seo, Jang-Woo;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.