• 제목/요약/키워드: High performance train

검색결과 590건 처리시간 0.027초

고속전철 제어 시스템을 위한 TCN/WTB 구현 및 성능 평가에 관한 연구 (A study on implementation and performance evaluation of the TCN/WTB for KHST)

  • 심세섭;박재현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.155-155
    • /
    • 2000
  • A high performance control and monitoring system for a high speed railway train requires a reliable the real-time communication network. TCN/WTB is designed for the data transmission over the train bus, and UIC556 defines that all the data be transmitted over TCN/WTB. This paper evaluates the performance of the link layer of WTB(Wired Train Bus). The evaluated results can be used for the selection of parameters for the sporadic message data.

  • PDF

고속철도 차량의 제동성능 해석에 대한 실험적 검증 (Experimental verification of the brake performance analysis for the high speed train)

  • 김영국;김석원;박찬경;이성호;박태원
    • 센서학회지
    • /
    • 제16권1호
    • /
    • pp.68-76
    • /
    • 2007
  • In general, the braking system of a high speed train has an important role for the safety of the train. To stop safely the train at its pre-decided position, it is necessary to properly combine the various brakes. The train has adopted a combined electrical and mechanical (friction) braking systems. In order to design a good brake system, it is essential for designers to predict the brake performance. In this paper, the braking performance analysis program has been developed and verified by comparing the simulation results with the brake test results of HSR-350x; both results match very well. Also, the brake performances of high speed trains can be predicted by using this program under various conditions.

차량편성구성에 따른 고속화물열차의 추진 및 제동성능 분석 연구 (A Study on the Propulsion and Braking Performance of the High Speed Freight Train with Composing the Rolling Stocks Formation)

  • 한성호
    • 전기학회논문지P
    • /
    • 제65권4호
    • /
    • pp.298-302
    • /
    • 2016
  • Currently, logistics are in small quantities and in diverse forms, and the amounts are continuously increasing. Railway logistics however are losing their market share every year mainly due to low operation speed and loading time, which means the trucks are covering the most of the freights. In order to solve these situations, this paper proposed the high speed freight train as working multi-modality with other modes to make effective transshipment. The high speed freight train has maximum operation speed of 300km/h and electric power to run centralized power supply. There are large dual door system, bogie system covering fluctuating load of 15[ton], automatic loading device, ULD(unit load device) bed and ULD locking system in this freight rolling stock. We calculated the performance of powering and braking capacity for this train and proposed how many vehicles are composed of train set. The results in this paper can help to make a decision to define the technical specification of High-speed freight train for the efficiency of rail freight service.

회전체를 이용한 전자페달의 고속 성능 검증 (Verification of High Speed Performance for the Electronic Pedal using a Rotor)

  • 김용규;고준영;윤용기;김주엽;이종현
    • 전기학회논문지
    • /
    • 제65권8호
    • /
    • pp.1450-1456
    • /
    • 2016
  • In this paper, we have checked a method of performance evaluation for electronic pedal, which is a core technology of HBD for detecting the axle temperature of high-speed train. As it is practically impossible to conduct train speed test of 500 km/h, we utilize a high speed rotor for evaluating high speed performance of the electronic pedal instead. According to this method, we found that the measurement results by the velocity measuring instrument is similar with the ones from this research through the high speed rotor. In conclusion, it will be possible to conduct reliability evaluation for high speed performance for Beacon, Balise and RFID, which are utilized for transmitting vital information of train control systems through using the rotor.

고속철도차량용 알루미늄 압출재의 차음성능에 대한 폼 충전효과 (Sound-Insulation Performance of Aluminum Extruded Panel by Charging Foam in a High-speed Train)

  • 이중혁;박인석;김석현
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2012년도 춘계학술대회 논문집
    • /
    • pp.582-585
    • /
    • 2012
  • The aluminum extruded panel used for a high speed train shows the largest contribution to sound insulation performance of the train body. However, comparing with the flat panel having the same weight, the transmission loss falls sharply in the local resonance frequency band. Such fall of transmission loss can be improved by increasing the damping of local resonance. This study examines the charging effect of an urethane foam on the aluminum extruded panel of a high speed train. We charged the urethane foam with different mass density and in different way in the core part of the extruded panel. We measure the transmission loss and compare the sound insulation performance according to the density and charging method. Finally, Improvement effect of the transmission loss is compared and analysed in aspect of weight increment.

  • PDF

A Study on the Contact Force between Catenary and Pantograph in Duplicate KTX-II Operation

  • Kang, Seung-Wook;Kim, Sang-Ahm;Kim, In-Chol
    • International Journal of Railway
    • /
    • 제6권1호
    • /
    • pp.1-6
    • /
    • 2013
  • Electric railway system driving the electric cars using power from catenary has been secured by performance of stable tracking between pantograph and catenary. The performance of the power collecting of pantograph is the one of the most important skills for high-speed train speed. The first Korea high-speed train(KTX) is 20 cars in one train set. In the meantime, collecting capability of single pantograph collector at one train set was confirmed through evaluation of the performance and the stability test. However, more research is needed to build for a stable collecting capability of coupled Korea's KTX-II High-speed system which is developed in Korea. In this study, actual vehicle test of coupled KTXSanchon was made to analyzing the data presented by the dynamic nature of catenary and pantograph, and the interface characteristics.

한국형 고속열차의 최고속도에서 압력변동 하중과 실내소음 특성 분석 (Characteristics of Pressure Fluctuation and internal noise level for Korean High Speed Train)

  • 박춘수;최성훈;이태형;목진용;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.338-343
    • /
    • 2005
  • The Korean high speed train(KHST), developed since 1996, is presently undergoing commissioning tests on the high-speed track as well as on the conventional track since 2002. The purpose of the commissioning test is twofold: first to verify the performance of the train-set and equipments, and to demonstrate system reliability. Last December, KHST has reached the maximum speed of 350km/h and a number of data proving the performance of the train has been acquired. Among the data noise level and pressure variation in a cabin are important factors effecting passenger's comfort. Discussed in this paper are interior noise and pressure variation when the train passes tunnels during the 350km/h test.

  • PDF

Structural health monitoring-based dynamic behavior evaluation of a long-span high-speed railway bridge

  • Mei, D.P.
    • Smart Structures and Systems
    • /
    • 제20권2호
    • /
    • pp.197-205
    • /
    • 2017
  • The dynamic performance of railway bridges under high-speed trains draws the attention of bridge engineers. The vibration issue for long-span bridges under high-speed trains is still not well understood due to lack of validations through structural health monitoring (SHM) data. This paper investigates the correlation between bridge acceleration and train speed based on structural dynamics theory and SHM system from three foci. Firstly, the calculated formula of acceleration response under a series of moving load is deduced for the situation that train length is near the length of the bridge span, the correlation between train speed and acceleration amplitude is analyzed. Secondly, the correlation scatterplots of the speed-acceleration is presented and discussed based on the transverse and vertical acceleration response data of Dashengguan Yangtze River Bridge SHM system. Thirdly, the warning indexes of the bridge performance for correlation scatterplots of speed-acceleration are established. The main conclusions are: (1) The resonance between trains and the bridge is unlikely to happen for long-span bridge, but a multimodal correlation curve between train speed and acceleration amplitude exists after the resonance speed; (2) Based on SHM data, multimodal correlation scatterplots of speed-acceleration exist and they have similar trends with the calculated formula; (3) An envelope line of polylines can be used as early warning indicators of the changes of bridge performance due to the changes of slope of envelope line and peak speed of amplitude. This work also gives several suggestions which lay a foundation for the better design, maintenance and long-term monitoring of a long-span high-speed bridge.

차세대 고속철도 차량 적층 구조의 차음성능 (Sound Insulation Performance of the Layered Structure of the Next Generation High Speed Train)

  • 이중혁;김석현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.326-331
    • /
    • 2011
  • Aluminum extruded panel used in a high speed train shows high stiffness, however, its sound insulation performance is remarkably decreased by local resonance phenomena. In this paper, improvement strategy of the sound insulation performance is proposed for the floor extruded panel used in HEMU-400x, 400km/h class next generation high speed train under development, and the improvement effect is verified by experiment. Aluminum extruded panel specimen for the floor is manufactured and urethane foam is installed in the core of the panel. Based on ASTM E2249-02, intensity transmission loss is measured and the improvement effect in local resonance frequency band is verified. Finally, improvement effect of the sound insulation performance is estimated on the layered floor structure including the foamed aluminum panel.

  • PDF

고성능 열차를 활용한 완급행 열차 운행 스케쥴 최적화 방안 연구 (Study on Optimization for Scheduling of Local And Express Trains Considering the Application of High Performance Train)

  • 김무선;김정태;고경준
    • 한국철도학회논문집
    • /
    • 제19권2호
    • /
    • pp.234-242
    • /
    • 2016
  • 기존 도시철도의 급행화 방안으로 가감속도가 향상된 고성능 열차를 완행에 투입하고 기존 성능의 열차를 급행에 투입하는 방안은 대피선 수를 줄이는 효과를 가진다. 본 연구에서는 고성능 열차를 완행으로 투입하는 급행화 방안을 토대로, 대피선 수를 최소화하면서 완행 열차의 운행시간을 최소화 할 수 있는 동시 최적화 방안을 제안하였다. 최적화 방안은 유전알고리즘을 기반으로 하여 차두시간, 대피선 위치 및 대피 시간을 설계 변수로 정의하였다. 결과적으로 제안한 최적화 방법론을 서울 7호선에 적용하여 타당한 최적화 결과를 얻을 수 있음을 확인하였다.