• 제목/요약/키워드: High Speed Rail

검색결과 817건 처리시간 0.035초

철도의 접근성 강화전략 (Strengthening strategies for railway accessibility)

  • 문대섭;정병현;김경태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.365-369
    • /
    • 2004
  • This paper is designed the accessibilities at rail station and near facilities without distinguishing transportation handicapped or not handicapped people. Therefore, I would like to refer that this study is the just beginning such as the development for sustainable railway. This primary paper intends to present alternatives of trans-modal systems as the final goal in an attempt to set a direction for future policy making in the high speed rail sector. The alternatives recommended in this report stress two important elements for maximized utility of high speed rail at the station areas.

  • PDF

고속철도용 전철기 국산화 개발 핵심 내용 및 우수성 (Core Contents&Superiority of Localized Point-Machine for High Speed Rail)

  • 윤호석;신기태;김대학;김영필
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.492-497
    • /
    • 2002
  • This study presents the core contents and superiority of localized Point-Machine which Alstom transferred its technology to Samsung SDS for High Speed Rail, developed based on existing MJ8l Point-Machine that is used in France and other countries. The scope of study includes introducing performance improvement of Localized MJ8l and conducting comparative analysis between Localized MJ8l and french products as well as NS type Point-Machine that has been deployed in the existing rail link. Moreover, the general architecture, features and test run results of Localized MJ8l are described.

  • PDF

고속 자동 테스트 장비용 비교기 구현 (Implementation of a High Speed Comparator for High Speed Automatic Test Equipment)

  • 조인수;임신일
    • 한국산업정보학회논문지
    • /
    • 제19권3호
    • /
    • pp.1-7
    • /
    • 2014
  • 본 논문은 자동시험장비 (ATE) 시스템의 측정 회로에 사용하는 비교기 설계에 관한 것이다. 이 비교기 전체 블럭은 연속 형의 고속 비교기, 차동차이증폭기, 그리고 출력 단으로 구성되어 있다. 연속 형의 고속 비교기는 높은 주파수(1~800MHz) 및 넓은 범위(0~5V)의 입력신호를 받아들이기 위해, 고속의 rail-to-rail 증폭기를 첫 단에 두었다. 또한 동작 속도를 높이기 위하여 고속의 전치증폭기와 래치를 순차적으로 구성하였다. 두 시험 소자(DUT) 간 출력 신호 차이를 검출함에 있어, 공통 신호와 차동 신호 차이를 모두 감지하기 위하여 차동차이 증폭기(DDA)를 사용하였다. 이 비교기는 $0.18{\mu}m$ BCDMOS 공정을 사용하여 칩으로 구현되었으며, 5mV의 신호 차이를, 800 MHz의 신호까지 비교가 가능하다. 구현된 칩 면적은 $620{\mu}m{\times}830{\mu}m$이다.

기존선 속도향상을 위한 틸팅차량시스템 기술사양(안) 제시 연구 (Technical specification of Tilting train EMU for speed UP on existing lines)

  • 한성호;박광복;이수길;유원희;엄기영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1298-1300
    • /
    • 2002
  • This paper suggested that the technical specification of tilting train EMU for speed up on existing lines. High speed strategy of existing lines are the modification of railway system which are made on cant, lengths of transition curves, the catenary system and train system. Tilting technology is more useful a strategy for speed increases on existing lines with low investment needed. We performed a feasibility study which is considered out real track conditions and designed propulsion and braking system of tilting EMU system.

  • PDF

21세기 한국철도망 정비방향 (Reformation of Korea Rail Network in $21^{st}$ century)

  • 신종서
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1624-1626
    • /
    • 2004
  • On the 105th year of the Korean Railroad, Korea railroad is at the advent of the high speed operation with an commercial operation of KTX(Korea Train eXpress), the fifth high speed line in the world, between Pusan and Seoul at the speed of 300km/hr. In order to enhance nation competitiveness in $21^{st}$ century, Korea Railroad is faced with a task of improving the railroad network in the areas of new line constructions, betterment of existing rail lines, increasing the operation speed and transportation capacity and modernization of rolling stock fleet.

  • PDF

콘크리트궤도에 고속분기기 설치를 고려한 교량설계 및 시공기법 (Design and Construction Method Considering Turnout for High-speed on The Bridge with Concrete Track)

  • 김인재;오세영;주환중
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.71-79
    • /
    • 2008
  • The concrete track is being used at the Phase II of the Kyeongbu High Speed Railway and New Constructed Honam High Speed Railway. When it makes a decision of bridge type, It has to consider about longitudinal forces of Continuous Welded Rail, Displacement at the end of bridges, Up-lift forces for fastener on the track. If it is installed turnout on the bridge, There is likelihood of the deck twist by applying the each difference longitudinal forces at the 4 each rails and the buckling by concentration of rail stress at the turnout. Moreover, If it is installed turnout on the continuous bridge and REJ(Rail Expansion Joint) on the main track or turnout track. It is hard to keep a safety for rail because of coming to twist or folding at the expansion of deck on the turnout track. Therefore when it is a design of bridge with turnout. It need to take bridge type to minimize an additional axial force and a displacement at the turnout. This paper makes a study of the composite steel arch bridge that is able to resolve criteria requirements of safety for track with turnout and suggest a helpful design method for bridge considering track with turnout by being based on design and construction method of Eonyang Bridge at the north part of Ulsan Station in Phase II of the Kyeongbu High Speed Railway.

  • PDF

경량전철용 구동시스템의 고속영역운전을 위한 추진제어기법 (Control Strategy for High Speed Operation in Light Rail Transit)

  • 이은규;최재호
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제53권10호
    • /
    • pp.634-640
    • /
    • 2004
  • In this paper, the control strategy for high speed operation in light rail transit system is proposed. Recently, the vector control strategy is used to get high capacity control characteristic in low speed area. But Six step mode that is one pulse mode is used in high speed region to use DC link voltage to the maximum. Therefore, in high speed area, the vector control can not be used but scalar control method is used. To get a driving performance to be stabilized, the method of smooth mode change between the low speed and high speed area and PWM control is desired. So this paper proposes the control strategy using vector control include the one pulse mode. And also proposes overmodulation method that makes to change in one pulse mode softly. The performance of traction system will be verified by simulation results using MATLAB and experimental results.

고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구 (A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads)

  • 조병완
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2000년도 춘계 학술발표회 논문집 Proceedings of EESK Conference-Spring
    • /
    • pp.485-492
    • /
    • 2000
  • In the rail facilities the rail track consists of rail tie fastening accessories and bed,. The rail track is largely divided into Ballast Bed Track(BBT) and Concrete Bed Track(CBT) according to the type of bed. In this thesis among Concrete Bed Track slab track which is used for the Japanese high speed railway is a target of this study. Dynamic analysis by using finite element method are performed. where moving rain load is periodic function. Then through parametric study some conclusions are obtained as follow. Cement Asphalt Mortar(CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore change of CAM spring coefficient should be handled with care, For slab thickness thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated, Improved structural type is proposed then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

매개변수해석을 통한 고속전철교량상 장대레일궤도 안전성 검토 (Parametric Study on the Safety of CWR Track over High-Speed Railway Bridges)

  • 강재윤;김병석;김영진;박성용;조정래;최은석;진원종
    • 한국철도학회논문집
    • /
    • 제5권1호
    • /
    • pp.1-9
    • /
    • 2002
  • Where the track is continuously welded over the bridge, the longitudinal forces will be distributed interactively between the track and the sub-structure by the rail-bridge interaction mechanism. The ratio between the longitudinal forces transmitted in each elements depends on the magnitude of the ballast resistance and the stiffness of the sub-structures. In this paper, the main factors affect on the longitudinal rail force are discussed and the parametric study for the behavior of CWR(Continuous Welded Rail) track was executed. It is concluded that the horizontal ballast resistance and the stiffness of the bridge sub-structure are the significant parameters affecting the stability of the continuous welded rail track.

고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구 (A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads)

  • 조병완;김영진;허민회;정태호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.493-598
    • /
    • 2000
  • In the rail facilities, the rail track consists of rail, tie, fastening, accessories and bed. The rail track is largely divided into Ballast Bed Track (BBT) and Concrete Bed Track (CBT) according to the type of bed. In this thesis, among Concrete Bed Track, slab track, which is used for the Japanese high speed railway, is a target of this study. Dynamic analysis by using finite element method are performed where moving train load is periodic function. Then through parametric study, some conclusions are obtained as follows. Cement Asphalt Mortar (CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore, change of CAM spring coefficient should be handled with care. For slab thickness, thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated. Improved structural type is proposed, then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF