• Title/Summary/Keyword: High Speed Electric Train System

Search Result 156, Processing Time 0.025 seconds

Radiated Electromagnetic Field Calculation due to Arc Discharge according to Speed of High Speed Train (고속철도의 속도에 따른 아크에 의한 전자파 방사 계산)

  • Han, In-Su;Lee, Tae-Hyung;Cho, Hong-Shik;Park, Choon-Soo;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.98-100
    • /
    • 2011
  • High speed Train Systems are the energy supplied system via the pantograph through which the voltage and the current supplied by the catenary wire flow. The arc discharges generate owing to the contact loss between the catenary and the pantograph, and the electromagnetic fields radiate. There are many different phenomena between the static charges and the moving charges in view of the radiated electromagnetic fields. To calculate the electromagnetic filed about the moving charges, it is necessary to adapt Lorentz transformation. Actually, the particle which moves near the speed of light has the relativisitic phenomena. In addition, it is necessary to predict the electromagnetic field because the radiated electromagnetic field takes effect on the near electronic devices and the human beings. In this paper, we model the arc discharge into the dipole antenna model, adapt Lorentz transformation to the case that the electric railway cars move, and calculate the radiated electromagnetic field. By the calculation, we take the basis upon the electromagnetic prediction, and apply to the future research.

  • PDF

The analysis of TSI procedure in the ERTMS/ETCS (ERTMS/ETCS의 TSI 절차에 관한 분석)

  • Lee, Sang-Hyeok;Kim, Min-Seok;Jung, Dae-Young;Ko, Young-Hwan;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.125-131
    • /
    • 2011
  • TSI(Technical Specification for Interoperability) is the highest technical specification in the Europe Railway and is composed by assessment items and essential requirements included by safety, reliability, availability, health, environment protection and technical compatibility. It is used on the research and development in the next generation railway technical. Currently, TSI procedures have been asked to bid for high speed rail business in Europe and Brazil. Also, all the railway systems such as infrastructure, signaling, electric and rolling stock system corresponding with standard of TSI procedures are exported and imported. Recently, Safety Critical System which has been studied on future railway R&D business in Korea is the state of the art train control system. And it is needed for system assessment of TSI procedures before system test and operation. In this paper, basic research is performed for analyzing TSI procedures suitable for the state of the art train control system in Korean railway.

  • PDF

Development of Integrated Simulator for AC Traction Power Supply System (윈도우즈 기반의 교류 전기철도 급전시스템 통합 시뮬레이터 개발)

  • Kim, Joo-Rak;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.76-81
    • /
    • 2010
  • This paper describes the development of integrated simulator with GUI(Graphic User Interface) for traction power supply system. This simulator consists of a lot of calculation modules such as TPS, train time schedule, line constant, and power supply system analysis. Each module has input and output structure respectively. The algorithms of all modules have confirmed the validity to comparison with field test that is performed on both high speed railway line and conventional line.

Dynamic Characteristics Analysis on the Synchronous Motor for Propulsion System of KTX High Speed Train (KTX 고속전철 추진제어시스템의 동기전동기 구동 동작특성 분석)

  • Yoon, Cha-Jung;Park, Sang-Woon;Lee, Eun-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3007-3018
    • /
    • 2011
  • This paper describes how to apply to commutate of thyristor efficiently. Thyristor is used for the high power system, as the research to secure domestic technology of the Current Source Inverter(CSI) for the synchronous motor operation which is used for the propulsion system of KTX. It has been composed to be available for the stable switching operation of the thyristor by supplementing problem of load commutation method, according to small Counter ElectricMotive Force(EMF) at low speed area of synchronous motor, via auxiliary commutation circuit using forced commutation method. We also have verified through the simulation using the Matlab.

  • PDF

The Study for Design of Tilting Mechanism and Guide Track of Tilting Pantograph (틸팅판토그라프의 틸팅 메커니즘 및 가이드 트랙형상 설계에 관한 연구)

  • Ko Taehwan;Kim Nampo;Han Seung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.798-803
    • /
    • 2004
  • The development of tilting train is required for speedup on the conventional electric railroad due to the characteristic of Korean railroad with a lot of curve track. The study and development of a tilting system and a tilting bogie which have a different mechanism with high speed train will playa important role for enhancement of technology for Korean railway. The study for tilting pantograph mechanism to decrease the displacement between a catenary and a center of pantograph happened when the carbody is tilted in order to maintain the ride comfort and stability on a curving track is proceeding with the development of tilting train. In this paper. we introduce the design concept for the tilting mechanism of a tilting pantograph and the role and characteristics for several devices adopted in the tilting pantograph mechanism. Through the kinematic analysis of tilting mechanism. we will obtain and calculate the optimal tilting angular velocity and acceleration in order to keep the contact behavior of a pantograph and a catenary according to tilting of a carbody.

  • PDF

A Study for on-Line Test of Electric Devices in KHST (KHST 차량 전기장치의 본선시운전시험에 관한 연구)

  • 한영재;김기환;목진용;김종영;이병석;최종선;김정수
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.138-143
    • /
    • 2003
  • KHST(Korean High-Speed Train, 350km/h), composed of 7 cars that are 2 power cars, 2 motorized car and 3 trailer cars, has been developed and is under on-line test. To verify hte design requirements about the functions and traction performances of this train, KRRI(Korea Railroad Research Institute) decided to evaluate traction performances of the train during on-line test. For this purpose, such as torque, velocity, voltage and current, must be measured. BRRI has developed the measurement system that can be measured vast and various signals effectively. In this paper, we introduce traction performances of KHST. The traction measurement items are focused on the verification of motor block performances.

  • PDF

Manufacture of Real-time Power Simulator for Electric Railway (전기철도용 실시각 급전시뮬레이터 제작)

  • Jang, Dong-Uk;Chung, Sang-Gi;Kim, Hyol-Chul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1473-1479
    • /
    • 2009
  • Recently, the high speed train was operated and then the train system's reliability requirements are growing more and more. The exact prediction simulation is necessary in the design of power feeding system by the increase of railway electrification. In order to develope the AC feeding system analysis technology, real-time power simulator was manufactured. It is composed to eight channels analog input, forty channels analog output and forty-eight channels digital I/O. The size of simulator rack is 19" and the two I/O boards are installed the PXI chassis built into the real time os. The signal I/O is possible through BNC connector. The test results of manufactured simulator are obtained that the error range of analog I/O signal is below 1 % and simulation condition is set to 1 ms and the simulation output of the analog output compares the results of the simulator.

  • PDF

Development of Permanent Magnet Synchronous Motor for High-speed Electric Multiple Unit - 400km/h eXperimen (차세대 고속전철용 영구자석동기 전동기 개발)

  • Kim, Jung-Chul;Kim, Bong-Chul;Park, Yeong-Ho;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.470-474
    • /
    • 2010
  • Up until now, power centralized trains have been produced due to the maintenance convenience and comfortableness, but there are some problems, such as limitation of viscosity and maintenance difficulty of railroad due to recently increasing axle mass. In order to improve the problems, power decentralized trains have been developed to improve traction power. In the case of using electrical braking system, it is possible to improve braking friction power. Induction motors have been developed for power decentralized high speed train because of less structural defection, and low maintenance and production cost. However, induction motors have limitations, such as assuring enough power capacity and efficiency with reduced size. PMSM (Permanent magnet synchronous motor) have been newly developed to improve shortcomings of induction motors. The PMSM can be produced small and light weighted. Also if the PMSM and induction motors have the same size and power capacity, the PMSM have better power efficiency. In this pater, the prototype and modified type of PMSM for "High-speed Electric Multiple Unit-400km/h eXperimmen" will be introduced.

  • PDF

Reliability Analysis of Arcing Measurement System Between Pantograph and Contact Wire (팬터그래프-전차선간 아크 검측 장치의 신뢰성 분석)

  • Park, Young;Kwon, Sam-Young;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.8
    • /
    • pp.1216-1220
    • /
    • 2012
  • The current collection between pantograph and contact wire is a more critical component for need to train speed up in electric railway. The basic purpose of this paper is to establish a measure of determining arc by developing an arc detector assessment system. The system was designed under conditions of EN 50317 and simulations were conducted using the developed device. According to the results, it was possible to conduct certification tests following regulations of international standards. To check the validity of our approach for the intended application, we analysis contact loss of catenary system using developed arcing measurement system in Korea. The proposed arcing measurement system is expected to enhance precision of current collection quality performance assessment methods at high-speed lines and conventional lines.

A Study on Parallel Operation of PWM Converter for Auxiliary Power Supply of High Speed Train (고속전철 보조전원장치용 PWM 컨버터의 병렬운전에 관한 연구)

  • Kim, Yeon-Chung;O, Geun-U;Won, Chung-Yeon;Choe, Jong-Muk;Gi, Sang-U
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.37 no.6
    • /
    • pp.64-72
    • /
    • 2000
  • This paper deals with the parallel operation of two PWM converters for auxiliary block of high speed train. The parallel operation of AC/DC PWM converter controlled by 3-level PWM switching method to operate switching devices to realize a high power factor and reduce the primary side of the transformer current harmonics is proposed. In this paper, it is presented the phase shift technique between two converters switching phase, solution to eliminate the coupling effects due to the transformer and zero crossing detection method for synchronized with the source and controller. Experimental results for laboratory system with TMS320C31 microprocessor and 10[kVA]PWM converter confirm the validity of the proposed algorithm.

  • PDF