• Title/Summary/Keyword: Gyeongbu

Search Result 119, Processing Time 0.029 seconds

A Study on the Geometry Change for the Increased Contact Wire Tension in the Pre-sagged Existing Catenary (사전 이도가 주어진 기설 전차선로에서 전차선 장력을 증가시켰을 때 전차선 기하학적 형상 변화 연구)

  • An, Seung-Hwa;Kim, Yoon-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.5
    • /
    • pp.447-453
    • /
    • 2012
  • It is studied that the structure of the contact plane geometry of the contact wire would be changed when the contact wire tension is increased in the existing overhead contact lines for the purpose of improving the operation speed temporarily. In this paper, the dropper length formula which could be well applied to the pre-sagged catenary is reviewed first. Second, the changing amount of the pre-sag if the contact wire tension change from 20kN to 23kN or from 20kN to 25kN for the Gyeongbu HSL(high speed line) 49.5m catenary is evaluated by using of the self-written program in accordance with the dropper length formula. Moreover, the increasing tension and measuring the pre-sag change experiment in the Gyeongbu 2 HSL was conducted. The calculated data are compared with the measured data. As a result, it is found that the geometry change is very little and will not make the current collection performance deteriorated.

Multi-dimensional Development Type and Plan for Railway Facility Site - Focus on the Gyeongbu Line Railway Multi-Dimensional Project in Busan (철도시설 부지 입체개발 유형 및 개발 방안 - 경부선 철도 입체화 사업을 대상으로 -)

  • Keum, Yun Jeon ;Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.525-533
    • /
    • 2023
  • Due to the topographical characteristics of Busan, which has many mountainous areas, there is a shortage of available land, and even the Gyeongbu Line railroad crosses the city center, hindering the disconnection of living areas and urban development. Accordingly, the need for multi-dimensional development has been raised to secure land, and recently, interest has been increasing in connecting cities divided by the undergroundization of the Gyeongbu Line railway and making efficient use of land. In this study, the development type was analyzed through the case of multi-dimensional development of land, and the development direction for each three-dimensional development type was set based on the results of the multi-dimensional development of four areas (Sasang Station, Gupo Station, Gaya Station, and Busanjin Station). In addition, reflecting the regional characteristics of the target area and the ongoing urban regeneration project, we will propose a design plan for horizontal and vertical space utilization of the railway site through multi-dimensional development through the efficient land use.

A Study on the Direct connection Service Effectiveness in Gyeongbu(KTX) (경부선(KTX) 직결운행 도입 효과에 관한 연구)

  • Kim, Ik-Hui;Kim, Yeong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.91-100
    • /
    • 2007
  • This study suggests direct connection service which has advantage of high-speed operation of KTX and access convenience of general train, and Pre-feasibility studies on the direct connection service. And analyze transportation demand change by the method as follows; It is to analyze the demand change of before and after KTX operation by previous transport data of Gyeongbu line, and calculate the coefficient of utilization using triggering demand by opening the 2nd phase of Gyeongbu line (Dongdaegu${\sim}$Busan). Through Pre-feasibility analysis, reduction $70{\sim}100$ minutes of train travel time and total revenue will increase about $100 thousand per day. Also, there will be environment-friendly effects of decreasing $CO_2$ emissions. But, Direct connection service need to highly cost ; Buying and Operation cost of KTX train. Therefore, we will be get more correct result of Pre-feasibility study on direct connection service, if there are concrete on buying the KTX action plans.

Multi-dimensional Utilization of a Railway Facility Site and the Need for Institutional Support: The Multi-dimensional Project of the Gyeongbu Line (철도시설 부지 입체적 활용 및 제도적 지원의 필요성 - 경부선 철도 입체화 사업을 대상으로 -)

  • Shin, Eun ho;Kim, Jong gu;Kang, Youn won;Keum, Yun geon;Kwon, Young soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.879-885
    • /
    • 2022
  • Of increasing global popularity is the multi-dimensional use and development of cities to address land use and urban issues caused by high urban density and challenging topography. In Korea, the city of Busan has a large proportion of mountainous areas, and the Gyeongbu Line that runs through the city's center has been interrupting this urban area for over 117 years. Because a lack of usable land is hindering the development of the city, introducing a multi-dimensional approach to urban development is seen as important. Accordingly, the Gyeongbu Line underground project is attempting to solve the problem of disconnection of Busan's city center and increase the amount of usable land for varied multi-dimensional use. In this study, by conducting a preference survey among those who live near the underground project sites of the Gyeongbu Line stations in Busan, the planned use of each available land arearesulting from the multi-dimensional development of railroadsand railway stations was investigated. However, in order to further the results of the survey, legal and institutional support is needed. There are limits to the multi-dimensional use of land, such as the lack of interconnection between individual laws and the lack of specific guidelines for multi-dimensional development.

A Study on Construction of Metro Rapid Transit Network in Daegu Area (철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과)

  • Han, Keun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06b
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

The Derailment Safety Estimation of DMT Freight for Real Track Condition (실제 선로조건에 따른 DMT 화차의 탈선안전도 평가)

  • Lee, Jong-Seong;Eom, Beom-Gyu;Lee, Seung-Il;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.830-835
    • /
    • 2011
  • DMT Freight is judged that economic performance is good because can increase cargoes than existing freight. However, the existing freight cars, each with a different balance to the body structure is bogie because the vibrations may occur. Thus, by minimizing vibration over the existing freight securing the safety of the driving if you will not have major problems in cargoes. In this study, multi-body dynamic analysis tool, VI-Rail using the actually Gyeongbu Railroad line and an empty, full freight condition include curve radius, track irregularity, cent. DMT freight of the derailed wagons were assessed for safety analysis. Full and empty freight conditions for parity in the Gyeongbu Railroad line(Dongdaegoo ${\leftrightarrow}$Gyungsan) derailment safety analysis, such as derailment safety coefficient and the radius wheel road decrement, echoing the curve and the orbit is affected by the irregularity was found. Full freight condition than the empty conditions showed a significant derailment safety. Overall, the limits of derailment coefficient (Q/P=0.8) and wheel road decrement limits (${\Delta}P/P=0.6$) is less safe with me confirmed that the derailment safety.

  • PDF

A Study on the Possible Running Time Estimation of Tilting Train on the Gyeongbu line (경부선 틸팅열차의 가능 운전시간 추정 연구)

  • Rho, Hag-Lae;Han, Seong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.199-206
    • /
    • 2015
  • A rising attention is paid to the railway system in many countries. KOREA is also of the opinion that the railway has to play a more important role in the near future to face up to the problems that increase gradually in the transport sector. To attract more traffic to the rail networks, it is important for rail modes to have running time competitiveness. Tilting trains, where it is possible to tilt the car-body towards the center of the curve, are a less expensive alternative to shorten travelling times on existing lines. Running time for tilting train is one of the most important factors, with which passenger demand forecasting or economic feasibility analysis will be done. This paper evaluates the speed limitation of tilting train around curves and also presents calculation process of its simulated possible running time. Then the adequacy of estimated time is verified with running time for Korean protype tilting train TTX (Tilting Train eXpress) by actual test run. As a case study, the estimated running time for the production version of tilting train and its time saving are presented compared with 2012's conventional Saemaul trains and non-tilting trains on the Gyeongbu line in the Korean rail network.