The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.
KOMPSAT (Korean Multi-Purpose Satellite) is a Low-Earth-Orbit (LEO) satellite under development in Korea. Its performance has been steadily improving. At this time, power demand of the payload increased according to performance improvement of the payload. Accordingly, design of the satellite, such as design of the internal power supply device and the configuration of the solar array, was changed. Thus, many considerations are required according to an increase in power when designing power EGSE (Electric Ground Support Equipment) for supplying power to satellites and conduct satellite integration tests. This paper deals with matters to be considered when designing power EGSE according to changes in satellite power requirements according to payloads and increase in power requirements.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.11a
/
pp.194-195
/
2021
Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.
Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.
Lee, Kyung-Ill;Lee, Chul-Gab;Hong, Wan-Ki;Kim, Min
Korean Journal of Applied Biomechanics
/
v.25
no.4
/
pp.393-399
/
2015
Objective : This study was conducted with an aim to use it as basic data for developing assistive devices, such as insoles that can suppress the progress of degenerative diseases and strategies, to improve early degenerative diseases by assessing walking characteristics of farm workers who were classified as KL-grade in the perspective of motor mechanics. Method : 38 male and female adults who complained of knee joint pain for more than six months were selected, and they were classified according to KL-grade. KL-grade was assessed by an orthopaedic specialist and an occupational environment health specialist. Filming equipment (FX-1, CASIO, Japan) and a ground reaction force system (AMTI OR6, AMTI, USA) were used to identify ground reaction force characteristics, and WOMAC was used for a pain rating scale. Results : There was a difference between the right and left side (axis-X) according to KL-grade, and when the grade was higher, the internal ground reaction force was also higher. Changes in COP were not affected by KL-grade of the knee joint, but it tended to increase as the grade increased. There were differences in the time required for limb support while walking according to the grades, and when the grade was higher, walking was more inefficient with long braking force and short propulsion forces. Also, pain rating scale, the right and left side, and COP changes while in support phase were related. Conclusion : There was a partial, statically significant difference in KL-grade and ground reaction force occurring during the support phase, and there were differences in ground reaction forces according to the grades of degenerative arthritis in the knee joint, indicating that this study is worthy as basic data for future studies.
Currently the variety of governmental business support and research for supplying solar energy have been actively progressed. As of now, however, There are no practical testing infrastructures of grid-connected photovoltaic system which test performance of solar power facility in domestic. Therefore, in KEPRI, there is in progress construction of practical testing ground of 500 kW class grid-connected PV System for developing the evaluation of the performance technology including the Module, PCS, and etc, that is the important instrument of the PV System, in Gochang area. It analyzed the site creation work for constructing the practical testing ground and new construction of control room and the unit standards, specifications and capacity of required equipment. For the system detailed design, configuration, instrument-specific parameters established, power generation predictions of Array Type and the components of testing ground are needed to build.
Journal of the Korean Society of Systems Engineering
/
v.2
no.1
/
pp.37-41
/
2006
The KSLV-I satellite launch vehicle will be launched in a space center currently under construction. The Space Center which is an advance post base of space development of Korea is located on Oenaro island in Kohung, South Cholla Province. A Ground Complex of the Space Center consists of an AC(Assembly Complex), a LC(Launch Complex), and a MCC(Mission Control Center). Assembly and test facilities are located in the AC in which stage assembly, integrated assembly, check-up, certification test, and pre-launch test are made effectively. A launch pad, fuel supply facilities, a launch control center and associated supporting facilities are located in the LC, and the MCC has control over the space center. These ground complex facilities have diverse forms of an interface with mechanical device, electric device, and etc. These should also provide optimum condition and performance during launch operation processes of the launch vehicle. This paper introduces the result of R&D for the AC of the ground complex performed during system design period.
This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.
Since satellites, including payloads, are limited in how they can respond to problems after launch, the functionality of the satellite should be verified sufficiently by EGSE (Electrical Ground Support Equipment). In addition, considering the trend that the development period of the satellite is shortening and the development of the EGSE must precede the development of the engineering model of electronic equipment, early securing of EGSE is necessary to comply with the development schedule of the entire satellite. In this paper, we propose a method for early securing highly reliable EGSE by devising a scenario based operating payload packet analyzer, which is a part of the EGSE, through functional modularization and external parameterization, and show the result of applying the implemented payload packet analyzer to real satellite program.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.