Browse > Article
http://dx.doi.org/10.7780/kjrs.2017.33.5.1.6

Scenario Based Operating Satellite Payload Data Analysis Method to Secure Highly Reliable EGSE Early  

Lee, Jong-Tae (Satellite Payload Research Office, Korea Aerospace Research Institute)
Lee, Ki-Jun (Department of Electronics Engineering, Chungnam National University)
Publication Information
Korean Journal of Remote Sensing / v.33, no.5_1, 2017 , pp. 521-535 More about this Journal
Abstract
Since satellites, including payloads, are limited in how they can respond to problems after launch, the functionality of the satellite should be verified sufficiently by EGSE (Electrical Ground Support Equipment). In addition, considering the trend that the development period of the satellite is shortening and the development of the EGSE must precede the development of the engineering model of electronic equipment, early securing of EGSE is necessary to comply with the development schedule of the entire satellite. In this paper, we propose a method for early securing highly reliable EGSE by devising a scenario based operating payload packet analyzer, which is a part of the EGSE, through functional modularization and external parameterization, and show the result of applying the implemented payload packet analyzer to real satellite program.
Keywords
Packet Telemetry Verification; Electrical Ground Support Equipment; Space Program; Software Reuse;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Levesque, M., J. Louis and A. M. Guerrero, 2000. Test execution control tool: Automating testing in spacecraft integration and test environments, Proc. of IEEE Aerospace Conference Proceedings, Big Sky, MT, Mar. 25, vol. 2, pp. 389-395.
2 Nguyen, H. D. and I. A. Miller, 2007. Reliability and efficiency of electrical ground support equipment through automation, modularization, and standardization, Proc. of IEEE AUTOTESTCON, Baltimore, MD, Sep. 17-20, pp. 311-320.
3 Aguirre, M. A., 2012. Introduction to Space Systems: Design and Synthesis, Springer Science & Business Media, New York, USA.
4 Canoy, J., 2011. Improving electrical ground support equipment development for satellite testing, Proc. of IEEE AUTOTESTCON, Baltimore, MD, Sep. 12-15, pp. 92-101.
5 Nguyen, H. D. and I. A. Miller, 2012. Cost impact of automated acceptance testing of Electrical Ground Support Equipment for spacecraft testing, IEEE Instrumentation & Measurement Magazine, 15(4): 28-33.   DOI
6 Park, J.-H., S.-W. Cho, Y.-Y. Kim, D.-C. Chae, Y.-G. Huh and J.-Y. Choi, 2013. Development Trend of Electrical Ground Support Equipments for Space Program, Current Industrial and Technological Trends in Aerospace, 11(2): 62-70 (in Korean with English abstract).
7 TORO, F. A. S., B. T. VU and M. S. Hamilton, 2011. Qualification of Electrical Ground Support Equipment for New Space Programs, Proc. of 15th World Multi-Conference on Systemics, Cybernetics and Informatics: WMSCI 2011, Orlando, FL, Jul. 19-22, pp. 19-22.
8 U. S. DOD, 1995. Reliability Prediction of Electronic Equipment, MIL-HDBK-217F Notice 2, Department of Defense, Washington DC, USA.
9 Jones, M., E. Gomez, A. Mantineo and U. K. Mortensen, 2002. Introducing ECSS Software-Engineering Standards within ESA, ESA bulletin 111: 132-139.
10 Wang, G., Y. Cui, S. Wang and X. Meng, 2011. Design and performance test of spacecraft test and operation software, Acta Astronautica, 68(11): 1774-1781.   DOI
11 CCSDS, 2000. Packet Telemetry, CCSDS 102.0-B-5, http://public.ccsds.org/Publications/SilverBooks.aspx, Accessed at Apr. 24, 2017.
12 CCSDS, 2015. AOS Space Data Link Protocol, CCSDS 732.0-B-3, http://public.ccsds.org/Publications/BlueBooks.aspx, Accessed at Apr. 24, 2017.
13 Duro, N., F. Moreira, J. Rogado, J. Reis, and N. Peccia, 2005. Technology harmonization-developing a reference architecture for the ground segment software, Proc. of IEEE Aerospace Conference, Big Sky, MT, Mar. 5-12, pp. 3968-3979.
14 ESA, 2016. Schiaparelli landing investigation makes progress, http://exploration.esa.int/mars/58590-schiaparelli-landing-investigation-makes-progress/, Accessed at May 14, 2017.
15 Finnigan, J. V. and J. Blanchette, 2008. A forwardlooking software reuse strategy, Proc. of IEEE Aerospace Conference, Big Sky, MT, Mar. 1-8, pp. 1-9.
16 Isbell, D. and D. Savage, 1999. Mars climate orbiter failure board releases report, numerous NASA actions underway in response, Mars Climate Orbiter Official Website, http://mars.nasa.gov/msp98/news/mco991110.html, Accessed at May 14, 2017.