A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port (부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석)

    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.313-322
    • /
    • 1999
  • Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

  • PDF

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

Assessing Critical Quality Metrics for Successful Baseline Construction Scheduling

  • Bivans, John;Choi, Jin Ouk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1241-1241
    • /
    • 2022
  • In the current construction industry, difficulty arises in creating an adequate baseline schedule to establish a fundamental plan for construction. This presentation will present the research findings which investigated industry-recognized schedule metrics that aid in the successful implementation of said schedule. Industry organizations (Association for the Advancement of Cost Engineering, the Government Accountability Office, the Project Management Institute, and local city, state, and county government offices) provide standardized guidelines with specific metrics requirements to ensure successful implementation. However, most of those metrics are substantiated or validated in their effectiveness. The study examined the impact between these industry-recognized critical metrics and three distinct scheduling characteristics: Project Type, Project Duration, and Project Density (number of activities within a schedule). The research results showed that, among the 12 various schedules evaluated in parallel with 20 industry-recognized critical metrics, seven metrics substantially demonstrate a significant impact on a project schedule's success. Furthermore, six of the seven metrics directly correlate to at least one of the three scheduling characteristics outlined. As a result, this research has established more predictable outcomes based on impacts between three distinct project characteristics and 20 of the most discussed/researched critical scheduling metrics in the field. This allows management teams to have more confidence in establishing critical milestones and accurate turnover dates from the start of the project through its final completion.

  • PDF

A Study on the Analysis and Improvement of the University Library Program Participating in ACE Project (ACE 사업에 참여한 대학도서관 프로그램 사례분석 및 개선방안 연구)

  • Seonkyung, Oh
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.4
    • /
    • pp.335-356
    • /
    • 2022
  • Universities contribute to the development of the country and society by cultivating professional manpower with knowledge and qualifications as democratic citizens through education and research activities. To this end, the government is improving the basic capabilities of universities and supporting autonomous innovation through university financial support projects. Since the financial support project differentially supports the government's finances limited to universities with a comparative advantage through fair evaluation, the role and function of the university library, a basic educational facility and core institution that supports education and research, is important. However, university libraries have not been able to actively participate in the government's financial support projects due to financial and manpower shortages, poor environments such as facilities, facilities, and spaces, and low participation rates for students. Therefore, this study investigated and analyzed the program operation cases of 18 university libraries in which libraries participated among 45 universities selected for the ACE project (2010-2016), derived problems and implications, and questioned the roles and achievements of university libraries. Based on the results, strategies and measures to be considered by university libraries in preparation for the government's university financial support projects were proposed.

A Study on Priority Goals of Stakeholders for Smart City Projects: An Application of AHP Methodology (스마트시티 프로젝트 이해관계자 간의 목표 우선순위에 대한 연구: AHP 방법론의 적용을 중심으로)

  • Lee, Taewon;Kim, Seung-Chul;Lee, Ayeon;Park, So Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.173-185
    • /
    • 2022
  • For the smooth implementation and success of smart city projects, it is necessary to recognize that there is a difference in the perception of value judgments or strategic goals among major stakeholders in the planning process. And it is necessary to aim the values and goals of smart cities through reconciliation of these differences. The two major stakeholders in the smart city development project are citizens group and government officials group. Government officials are in charge of establishing and implementing policies for smart city projects, and their value judgments and perceptions influence the policy direction. In these respects, government officials can be an important stakeholder group. Citizens are a group that includes ordinary residents and business owners who live in smart cities and are the ultimate users of infrastructure and facilities. This study investigated the importance perceptions of citizens and government officials, who are the major stakeholders, about the core values and strategic goals that the smart city project aims. Responses were collected using a structured questionnaire to which the AHP methodology was applied. And the priority of perceptions for constituent items was compared for each stakeholder group. Through the comparative analysis results, it was empirically confirmed that there is a difference in the values and goals pursued by the smart city project between stakeholder groups. As an empirical study on the stakeholders of the smart city project, this study is meaningful in contributing to the theoretical development in that it suggests that the conceptual structural model of the smart city strategy system presented in previous studies can be applied in practice.

Critical Success and Failure Factors of e-Government Project Implementation in Kenya (케냐의 전자정부 프로젝트 핵심 성공 및 실패 요인)

  • Wamoto, Francis O.K.;Hwang, Gee-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.119-128
    • /
    • 2016
  • Use of ICT in Government has ability to improve service delivery to its citizens, and yet many developing countries have lagged behind in the implementation of e-Government. Many e-Government initiatives also failed to achieve their objectives in developing countries. This paper therefore aims to identify critical failure or success factors in Kenya, using Heeks' Factor Model. A survey questionnaire was developed and data were collected and analyzed from officials and interested citizens. The analysis results enabled to highlight seven specific success and failure factors, and their constituent elements in Kenya. The Kenyan overall e-Government implementation score belongs to the Zone of Improvement (3.52 of total 5.0), which means partial success or failure. The enablers of e-Government projects are good strategy formulation, and internal and external drive, whereas main failures of e-Government are weak ICT infrastructure. The areas for improvement are project management, design, competencies and funding. Data analysis highlights both strengths and weaknesses for each factor or variable. In particular, Kenyan government excels at the drive for change by top to bottom government officers as well as external stakeholders, while the government officers who are using e-Government are satisfied with the availability of vision, strategy and plan of e-Government implementation. Both technologies and e-transactions laws were the worst of all the variables in e-Government implementation. Two areas should be improved using immediate corrective action. In-depth study reveals that government officers and citizens can't fully use their laptop and mobile devices due to the lack of both ICT network and its operating technology, and legal system associated with the transaction of business information. Finally, the study ends up with recommendations for policy makers to shape the future of e-Government system in both developing and developed countries.

MONITORING OF MOUNTAINOUS AREAS USING SIMULATED IMAGES TO KOMPSAT-II

  • Chang Eun-Mi;Shin Soo-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.653-655
    • /
    • 2005
  • More than 70 percent of terrestrial territory of Korea is mountainous areas where degradation becomes serious year by year due to illegal tombs, expanding golf courses and stone mine development. We elaborate the potential usage of high resolution image for the monitoring of the phenomena. We made the classification of tombs and the statistical radiometric characteristics of graves were identified from this project. The graves could be classified to 4 groups from the field survey. As compared with grouping data after clustering and discriminant analysis, the two results coincided with each other. Object-oriented classification algorithm for feature extraction was theoretically researched in this project. And we did a pilot project, which was performed with mixed methods. That is, the conventional methods such as unsupervised and supervised classification were mixed up with the new method for feature extraction, object-oriented classification method. This methodology showed about $60\%$ classification accuracy for extracting tombs from satellite imagery. The extraction of tombs' geographical coordinates and graves themselves from satellite image was performed in this project. The stone mines and golf courses are extracted by NDVI and GVI. The accuracy of classification was around 89 percent. The location accuracy showed extraction of tombs from one-meter resolution image is cheaper and quicker way than GPS method. Finally we interviewed local government officers and made analyses on the current situation of mountainous area management and potential usage of KOMPSAT-II images. Based on the requirement analysis, we developed software, which is to management and monitoring system for mountainous area for local government.

  • PDF

주민서비스 [입체체험관] 프로젝트 - '중랑 한(HAN : Here And Now)마음 만들기' 마케팅을 위한 -

  • Kim, Yeong-Hui
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.117-126
    • /
    • 2007
  • The current participative government has started to carry out Residents Service Reform that transforms the transmission system of suppliers' oriented convenience to one-stop tai for made civil and governmental integral ion service for the purpose of realizing universal Social Benefits in responding to increasing desires of people according to the changes of social and economic conditions by overcoming the existing limit of transmission system. This study has analyzed the status and problems of local autonomous organizations according to the innovation of support for the life of residents and in order to solve these problems, I present the implementation strategy of transmission system of civil and government cooperation tailor-made integral ion service through the project of "30 experiencing hall for Social Benefits, " which is a joint project of civil and government dove loped by Jungrang-gu. In addition, it aims for the completed accomplishments of this project to settle as eight largest services market ing brand in 30 method and also as the best strategic brand for the "establishment of network of civil and governmental cooperation" with suppliers of public services, suppliers of civil service, and residents, who are suppliers as well as potential customers, for solving problems of local communities.

  • PDF

Analysis of project-level elements of a smart city: A case study

  • Kisi, Krishna P.;Bhattarai, Sushmit Sharma
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1001-1008
    • /
    • 2022
  • As a part of the Smart Cities Mission, the Government of India in 2015 embarked upon the development of 100 existing cities as smart cities. In this study, the authors selected Ahmedabad city as the smart city development in India and presented project-level elements of the city based on the secondary data availability. At first, the authors focused on peer-reviewed articles, policy documents, and technical reports. Next, the authors collected the secondary data of project-level elements of the Ahmedabad city from the years 2015 to 2019. The findings show no significant improvement in the sewage system and waste collection as compared to the level of investment made in these sectors. The study showed that the water supply system outperformed revenue generation based on the government investment made in that sector. As a lesson learned, these findings indicate that significant improvement should be addressed in sewage management and waste collection. These study findings could help government officials, investors, developers, and city planners in making the appropriate decision before and during smart city execution. The lesson learned from this study could be used as a reference to improve revenue during the future smart city implication.