Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port

부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석

  • Published : 1999.12.01

Abstract

Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

Keywords

References

  1. 부산 · 경남권 광역개발권역지정 및 광역개발계획 건설부
  2. 가덕신항만개발 기본설계용역 보고서 해양수산부
  3. 해양수산 통계연보 해양수산부
  4. 부산도시기본계획 부산광역시
  5. '98 차량교통량 조사결과 부산광역시
  6. 선진항만과 부산항의 이해 부산광역시
  7. '98년도 컨테이너 화물 유통추이 및 분석 한국컨테이너부두공단
  8. 부산신항 개발에 따른 교통영향평가 부산신항만주식회사
  9. 해안순환도로 건설 타당성 분석 부산광역시