• 제목/요약/키워드: Government Office Buildings

검색결과 74건 처리시간 0.023초

신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스 (Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard)

  • 양현주;김종협;한상원;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.44-45
    • /
    • 2014
  • Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

  • PDF

임진왜란(壬辰倭亂) 이후 남별궁(南別宮)의 공해적(公廨的) 역할과 그 공간 활용) - 장서각 소장 "소공동홍고양가도형"."사대부가배치도형"의 분석을 통하여 - (Role and its Spatial utilization as a Government office of the Nambyeol-gung(南別宮) after the Japanese invasion of Korea in 1592)

  • 정정남
    • 건축역사연구
    • /
    • 제18권4호
    • /
    • pp.43-62
    • /
    • 2009
  • No.87 Sogong-dong where is the Chosun hotel stand. There was the Nambeol-gung(south ern royal villa) which had been a reception hall for enboys of the toadied country before Hwangudan圜丘壇 being set up in the year 1897. The site of the Nambeol-gung was Gyeongjeong慶貞 princess's a lot for house in the early 15th century. But after princess's death, it occurred property dispute between her son and four daughters. As a result of the dispute, a lot and a house of all the princess's properties reverted to the government. At reverted this lot was established a big royal villa in the year 1583 and that royal villa was granted to Uian prince. The villa reverted to the government again when the Uian義安 prince was dead in 12 years old by an epidemic. After the Imjin Invasion壬辰倭亂, another houses and buildings got to be role as a palace because of all the palace in the capital was burnt down to ashes. Among others Nambeol-gung was brought into play as the royal audience chamber. As well as, the villa became brought out role as a reception hall for enboys of the toadied country instead of a damaged reception hall the Taepyong-gwan太平館. In period when the envoy didn't come, the Nambeol-gung was used to extraordinary office of government like Dogam都監. This situation is to mean that the Nambeol-gung is not the royal villa any more. Because of the Nambeol-gung was built as a royal villa, that spaces were composited like space of house and palace. But this spatial composition and spatial name were not fit to hold a ceremony of government office. After all, Nambeol-gung was used change only the spatial name conform to ceremony of office keep up the spatial composition.

  • PDF

An Analysis on Building Shading Plan for a City Hall considering Energy Saving

  • Kim, Jin Lee;No, Sang Tae
    • KIEAE Journal
    • /
    • 제16권2호
    • /
    • pp.5-10
    • /
    • 2016
  • Purpose: Recently, many public office buildings which were built by curtain wall increased rapidly, but the results of the investigation of the government, these buildings have been found that the heating and cooling thermal load is high, and showed low energy efficiency. Method: To evaluate the effects by applying outdoor louver and indoor blind, which can control solar radiation in order to reduce the heating and cooling load of public office building which was built by glass curtain wall. The heating and cooling load was calculated via Energyplus, building and outdoor louver, indoor blind were modeled by Google sketchup connected to Energyplus. Result: The results of this study were as follows; the case of applying various outdoor louver, the heating and cooling load all decreased as compared to the case without applying outdoor louver, the case of applying indoor blind, the heating and cooling load decreased as compared to the case without applying indoor blind, but indoor blind showed low energy performance comparing outdoor louver.

Process of Community-based Sustainable CO2 Management

  • Park, Jae-Hyun;Hong, Tae-Hoon
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.11-17
    • /
    • 2011
  • According to the United Nations Framework Convention on Climate Change (UNFCCC), many countries around the world have been concerned with reducing Greenhouse Gas (GHG) emissions. Reducing the level of building energy consumption is particularly important in bringing GHG down. Because of this, many countries including the US and the EU are enforcing energy-related policies. However, these policies are focused on management of single types of buildings such as public buildings and office buildings, instead of management on a national level. Thus, although various policies have been enforced in many countries, $CO_2$ management on a national level is still not an area of focus. Therefore, this study proposed a community-based $CO_2$ management process that allows government-led GHG management. The minimum unit of the community in this study is a plot, and the process consists of three steps. First, the current condition of the GHG emission was identified by plot. Second, based on the identified results, the GHG emission reduction target was distributed per plot by reflecting the weighted value according to (i) the target $CO_2$ reduction in the buildings in the standard year, (ii) region, and (iii) building usage and size. Finally, to achieve the allocated target reduction, building energy management was executed according to the properties of the building located on each plot. It can be expected that the proposed community-based $CO_2$ management process will enable government-level GHG management, through which environment-friendly building construction can be promoted.

PROCESS OF COMMUNITY-BASED SUSTAINABLE CO2 MANAGEMENT

  • Jaehyun Park;Taehoon Hong
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.262-268
    • /
    • 2011
  • According to the United Nations Framework Convention on Climate Change (UNFCCC), many countries around the world have been concerned with reducing Greenhouse Gas (GHG) emissions. Reducing the level of building energy consumption is particularly important in bringing GHG down. Because of this, many countries including the US and the EU are enforcing energy-related policies. However, these policies are focused on management of single types of buildings such as public buildings and office buildings, instead of management on a national level. Thus, although various policies have been enforced in many countries, CO2 management on a national level is still not an area of focus. Therefore, this study proposed a community-based CO2 management process that allows government-led GHG management. The minimum unit of the community in this study is a plot, and the process consists of three steps. First, the current condition of the GHG emission was identified by plot. Second, based on the identified results, the GHG emission reduction target was distributed per plot by reflecting the weighted value according to (i) the target CO2 reduction in the buildings in the standard year, (ii) region, and (iii) building usage and size. Finally, to achieve the allocated target reduction, building energy management was executed according to the properties of the building located on each plot. It can be expected that the proposed community-based CO2 management process will enable government-level GHG management, through which environment-friendly building construction can be promoted.

  • PDF

국내 공동주택 부문의 친환경건축 인증 평가 항목 및 사례 분석 (The Analysis on the Evaluation Items of Korea Green Building Certification Criteria by the Case Studies of Collective Housing)

  • 김창성
    • KIEAE Journal
    • /
    • 제13권2호
    • /
    • pp.93-100
    • /
    • 2013
  • Many countries have made their best to protect the earth from global warming and to find solutions for the reduction of carbon dioxide emittion and energy consumption. Especially, buildings have emitted over 40% of carbon dioxide against whole quantities emitted to the earth. Therefore, the reduction of carbon dioxide emitted from buildings require to save the earth environment. Energy consumption of buildings in Korea has reached 24% of total energy quantities, and energy consumption of collective housing has been continuously increasing. So, Korea government has also executed the Green Building Certification Criteria(GBCC). The GBCC evaluates the 8 types of buildings - collective housing, office, school, etc - to certificate the green building. In this paper, the evaluation items of collective housing in GBCC were reviewed to be used as the reference data for future revisions by the case studies. According to the results of this study, current version of GBCC requires additional revisions about the evaluations of energy consumption monitoring, commissioning and existing building.

그린빌딩화를 통한 청사 업무환경 개선을 위한 사용자 의식에 관한 연구 - 제주특별자치도 제 1, 2청사를 중심으로 - (A Study on User's awareness for Workable Environment Improvement of Public Building by Green Building Renovation - Focus on the 1st & 2nd Buildings of Jeju Special self-Governing Province -)

  • 오창훈;김태일;양건
    • 한국실내디자인학회논문집
    • /
    • 제19권3호
    • /
    • pp.162-171
    • /
    • 2010
  • In the field of architecture, the sustainable architectural concept, "green buildings," has been suggested as an alternative to solve the environmental problems; however, the concept has not yet been converted to awareness and development of related technology. The leading role of public sector has been socially and economically influential in the nation, hence green public buildings are significant to stimulate the spread of green buildings in the nation. This study is to draw an appropriate method of implementing the green building concept to the two main government office buildings of Jeju Special Self-Governing Province based on the plan to improve the work environment; it is also to provide long-term directions of implementing policies and reference for the public and private sector to utilize the green building concept. Its research methodology was the survey method. A total of 142 questionnaires were returned by government employees of the two buildings. It accounts for 20% of the total number of 711 workers of the buildings. According to the analysis of the returned questionnaire, the majority of the surveyed have a positive evaluurned toward the introduction of green buildings due to their expecturned for the possible i the buildingstheir work environment. In addition, they showed more interest in space planning with natural ventilation than automatic systems regarding applied methods for green buildings.

G-SEED 인증 건축물과 비인증 건축물의 에너지 소비량 특성에 관한 연구 : 업무시설을 대상으로 (A Study on the Comparison for Energy Consumption Characteristics between G-SEED certified and non-certified Office Buildings in Korea)

  • 김종현;김진호
    • 한국산학기술학회논문지
    • /
    • 제20권11호
    • /
    • pp.33-43
    • /
    • 2019
  • 기후변화 문제를 해결하기 위해 세계 각국은 온실가스 감축 의무를 이행하기 위해 노력하고 있다. 건물부문은 국가 온실가스 배출량의 약 25%를 차지하며, 향후 40%까지 증가할 것으로 전망하는 만큼 정부는 에너지 절감 계획에 대한 정책을 수립하여 추진 중이다. 건물부문의 에너지 절감을 위한 정책의 일환으로 녹색건축인증제도 시행을 통해 보다 에너지 절감형 건축물 설계와 시공을 유도하고 있다. 본 연구는 G-SEED 인증 건축물과 비인증 건축물의 에너지 소비량에 영향을 미치는 원인에 대한 분석과 결과를 바탕으로 현행 제도의 실효성과 문제점을 파악하고 향후 G-SEED 제도의 개선 방향에 대해 논의하고자 한다. 이를 위해 서울시에 소재하고 있는 인증 업무시설 135동과 비인증 업무시설 142동을 대상으로 건축물 정보와 에너지 소비량 데이터를 수집하였으며, 분석결과 다음과 같은 결론을 도출하였다. 인증 업무시설은 비인증 업무시설에 비해 연간 50% 이상의 에너지 절감효과가 있는 것으로 나타났다. 계절에 따른 에너지 소비량은 난방 도일과 높은 상관관계가 있는 것으로 나타났다. 사용승인연도가 높을수록 인증 업무시설의 에너지 소비량은 감소하며, 비인증 업무시설은 오히려 증가하는 경향을 보였다. 규모와 인증등급에 따른 에너지 소비량은 상관관계가 미미한 것으로 드러났다. 본 연구는 이상의 분석을 통하여 G-SEED 인증제도 개선을 위한 기초자료로서 의의가 있다. 또한 건축물의 에너지성능 기준이 강화되는 추세를 감안하여, 분야별 점수를 공개적인 자료로 전환하는 것을 제시한다.

공공기관 에너지 효율등급 향상을 위한 적용 설계요소에 관한 연구 - 공공청사 리모델링시 패시브 디자인요소를 중심으로 - (An Architectural Study on the Improvement of Energy Efficiency of Public Institution - Focused on Public Office Buildings Remodeling of Passive Design Elements -)

  • 조정철;박재승
    • 한국실내디자인학회논문집
    • /
    • 제21권4호
    • /
    • pp.114-120
    • /
    • 2012
  • There are lots of buildings which were built before the Legislation on building energy rating system. Remodeling of the buildings would be required for an improvement of the building energy rating system was enforced by the government. In the Passive Building Design, Elements which will be used for the remodeling are Insulation, Window, External venetian blind, Heat exchanger. The Purpose of this study is to indicate a Method for the improvement of Energy saving by an analysis of Construction Cost, Cost Evaluation, Energy performance Efficiency in applied design elements. In this study, the remodeling of existing public buildings to improve energy efficiency rating was applied to extract the elements of design-specific energy performance, efficiency, and the application of the designs that has been analyzed. The results were as follows: applying the design-specific cost-effective investment that represents the economy (investment efficiency/%) surveyed the average insulation(7.0%), triple glazed windows(10.1%), double glazed windows(12.1%), external shading(24.5%), and Heat(77.2%) were analyzed in order to be more efficient. Analysis of the basis of information on the existing public buildings to improve energy efficiency rating for the remodeling depending on driving conditions at a degree of individual difference. The main effect, however, depending on economic investment, design elements, heat exchangers, external awning, double glazed windows, triple glazed windows, insulation, is recommended as review of the order shall be determined.

  • PDF

도심 복원 이미지 제작을 통한 1930년대 후기 청주읍치 경관 고찰 (A Study on Cheongju-eup Townscape in the Late 1930s by Modeling the Restoration Image)

  • 김태영
    • 한국농촌건축학회논문집
    • /
    • 제21권2호
    • /
    • pp.27-34
    • /
    • 2019
  • This study explores the emergence of a modern form of Cheongju-eup townscape in the late 1930s by re-examining the 1960s restoration model of Seongan-dong and Jungang-dong in Cheongju, one of the historic cities in South Korea. According to the acquired data from the restoration model, it is found that the construction of a new urban area during the late 1930 was resulted from the following events: the development of a railroad station located outside of the north gate of Cheongju-eup since 1921, the completion of Musimcheon embankment outside the south gate in 1932, and the construction of Chungcheongbuk provincial office outside the eastern gate in 1937. In this period of development, which the author named 'Cheongju-eup period', the streets in the old castle, consisting only of two-story financial buildings, had been expanded from the existing area at the Seongan-gil intersection to the outside the east gate of Cheongju-eup. In addition, public government buildings, which were mainly located in both Seongan-gil and Yulgok-ro in the east-west direction, were newly constructed during the late 1930s in Seokgyo-dong, a new area in which a large number of commercial buildings including department stores, clothing stores, shoes shops, and watch stores were also built along the streets. Moreover, the modern form of Cheongju-eup was to be formed by several construction projects in the area of Jungang-ro in the late 1930s. Until the 1920s, the townscape outside the northern gate of Cheongju-eup, were composed of primary, agricultural, and female schools built on a largest site of Gyoseo-ro and Daeseong-ro as well as a transportation warehouse and a railway office near the Cheongju station. Then, entering the 1930s, new school buildings and domestic industrial shops and factories were built around the area of Jungang-ro ranging from the railway outside the northern gate to Bangadari. As a result, the expansion of townscape with newly constructed buildings in the late 1930s marked the emergence of a modern form of Cheongju-eup.