• Title/Summary/Keyword: Geothermal heat pump

Search Result 339, Processing Time 0.026 seconds

A Study on High Efficiency Geothermal Heat Pump System by Improving Flow of Heat Exchanger (열교환기의 흐름개선을 통한 고효율 지열 히트펌프 시스템에 관한 연구)

  • Ahn, Sung-Hwan;Choi, Jae-Sang;Kim, Sang-Bum;Ahn, Hyung-Hwan
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.4
    • /
    • pp.42-46
    • /
    • 2017
  • As $CO_2$ emission with imprudent using fossil fuel, annual mean temperature of earth is increased in every year. Geothermal energy is inexhaustible energy resource to solve this problem. Heat pump performance and heat exchange efficiency of ground loop are important to distribute widely. Thus, this study are performed to increase heat pump performance and heat exchange efficiency of ground loop with dual expansion valves and spacer. As a results, COP of cooling & heating is obtained improvement up to 11.4% using dual expansion valves, and heat exchange efficiency is increased up to 17.5% using spacer. It will be reduced initial installation cost due to increasing heat pump performance and heat exchange efficiency of ground loop.

An Experimental Study of Ground Water Source Two Well Type Geothermal Heat Pump System (지하수 열원 복수정 지열 열펌프 시스템의 성능에 관한 실험적 연구)

  • Lim, Hyo-Jae;Kwon, Jeong-Tae;Kim, Chang-Eob;Kong, Hyoung-Jin;Park, Seong-Koo
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.8
    • /
    • pp.468-474
    • /
    • 2009
  • Ground water source heat pump system is the oldest one of the ground source heat pump systems. Despite of this, little formal design information has been available until recently. The important design parameters for open system are the identification of optimum ground water flow, heat exchanger selection and well pump. In this study, the capacity of 50 RT system of two well type ground water heat pump system was used. As a result, static water level was -7 m and the level during the heating operation was -32 m, cooling operation was -40 m. The initial static water level recovered within 48 hrs. The temperature of ground water is $15.6^{\circ}C$ for heating season and $16.2^{\circ}C$ for cooling season and does not depend on the outdoor temperature. Operation efficiency of the system shows that, COP 3.1 for heating and COP 4.2 for cooling.

Drying Quality Characteristics of Shiitake Mushroom by Heat Pump Hot-air Dryer (열펌프 열풍건조기를 이용한 표고버섯의 건조 품질특성)

  • Shin, Eun-Jeong;Lee, Ho-Joon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.11 no.4
    • /
    • pp.22-27
    • /
    • 2015
  • Quality characteristics of Shiitake mushroom using two types of dryers, energy-efficient heat pump hot-air dryer and electric heater hot-air dryer were compared. Energy consumed during drying by heat pump hot-air dryer and electric heater hot-air dryer were 22.8 kWh and 28.9 kWh, respectively. Total polyphenol content of heat pump hot-air dryer and electric heater hot-air dryer after drying were $290.55{\pm}10.56ppm$ and $192.99{\pm}6.53ppm$, respectively. No differences were observed between dryers in reconstitution rate and browning ratio after drying. Also, there were no differences between dryers in color value and ${\Delta}E$ value after drying. Shiitake mushroom drying at $45^{\circ}C$ by heat pump hot-air dryer was proved to be more efficient in energy consumption than by electric heater hot-air dryer.

A Basic Study on the Performance CFD simulation of Road Snow-melting system by Ground Source Heat Pump (지열원 히트펌프를 이용한 도로융설시스템의 CFD 성능예측에 관한 기초연구)

  • Choi, Duk-In;Kim, Joong-Hun;Kim, Jin-Ho;Hwang, Kwang-Il
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.2
    • /
    • pp.23-28
    • /
    • 2010
  • Fluent ver.6.3 is used as CFD(Computational Fluid Dynamics) simulator to predict the performance of snow-melting system by geothermal pipes energy. As the results of this simulation, it is clearly shown that $50^{\circ}C$ of working fluid in to geothermal evaluated as more effect comparing to $45^{\circ}C$ of working fluid. The Surface temperature is come to $5^{\circ}C$ at 1m/s speed and $50^{\circ}C$ temperature of the working fluid.

Hybrid thermal seasonal storage and solar assisted geothermal heat pump systems for greenhouses

  • Ataei, Abtin;Hemmatabady, Hoofar;Nobakht, Seyed Yahya
    • Advances in Energy Research
    • /
    • v.4 no.1
    • /
    • pp.87-106
    • /
    • 2016
  • In this research, optimum design of the combined solar collector, geothermal heat pump and thermal seasonal storage system for heating and cooling a sample greenhouse is studied. In order to optimize the system from technical point of view some new control strategies and functions resulting from important TRNSYS output diagrams are presented. Temperatures of ground, rock bed storage, outlet ground heat exchanger fluid and entering fluid to the evaporator specify our strategies. Optimal heat storage is done with maximum efficiency and minimum loss. Mean seasonal heating and cooling COPs of 4.92 and 7.14 are achieved in series mode as there is no need to start the heat pump sometimes. Furthermore, optimal parallel operation of the storage and the heat pump is studied by applying the same control strategies. Although the aforementioned system has higher mean seasonal heating and cooling COPs (4.96 and 7.18 respectively) and lower initial cost, it requires higher amounts of auxiliary energy either. Soil temperature around ground heat exchanger will also increase up to $1.5^{\circ}C$ after 2 years of operation as a result of seasonal storage. At the end, the optimum combined system is chosen by trade-off between technical and economic issues.

Cooling Performance of Cooling Tower-Assisted Ground-Coupled Heat Pump (GCHP) System Applied in Hospital Building (병원 건물에 설치된 냉각탑 병용 지열 히트펌프 시스템의 냉방 성능)

  • Sohn, Byonghu;Lee, Doo-Young;Min, Kyung-Chon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.12 no.1
    • /
    • pp.7-16
    • /
    • 2016
  • This paper presents the measurement and analysis results for the cooling performance of ground-coupled heat pump (GCHP) system using a cooling tower as a supplemental heat rejector. In order to demonstrate the performance of the hybrid approach, we installed the monitoring equipments including sensors for measuring temperature and power consumption, and measured operation parameters from May 1 to October 30, 2014. The results showed that the entering source temperature of brine returning from the ground heat exchanger was in a range of design target temperature. Leaving load temperatures to building showed an average value of $11.4^{\circ}C$ for cooling season. From the analysis, the daily performance factor (PF) of geothermal heat pumps ranged from 4.4 to 5.2, while the daily PF of hybrid GCHP system varied from 3.0 to 4.0 over the entire cooling season.

A Study on the Performance Evaluation of Hybrid Energy System with Geothermal and Solar Heat Sources (지열-태양열원 복합시스템의 성능평가에 관한 연구)

  • Hwang In-Ju;Woo Nam-Sub;Lee Hong-Chul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.3
    • /
    • pp.279-286
    • /
    • 2006
  • The present study concerns the annual performance evaluation of a hybrid-renewable energy system with geothermal and solar heat sources for hot water, heating and cooling of the residential buildings. The hybrid energy system consists of ground source heat pump of 2 RT for cooling, solar collectors of $4.8m^2$, storage tank of 250 liters and gas fired backup boiler of 11.6 kW. The averaged coefficients of performance of geothermal heat pump system during cooling and heating seasons are measured as 4.1 and 3.5, respectively. Also solar fraction for hot water is measured as 35 percent. Overall, the results shows that the hybrid-renewable energy system satisfactorily operated under all climatic conditions.

Study on the Performance Prediction Simulation of the Heat Pump System using Solar and Geothermal Heat Source (태양열 및 지열 이용 히트펌프 시스템의 성능예측 시뮬레이션에 관한 연구)

  • Nam, Yu-Jin;Gao, Xin-Yan
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.3
    • /
    • pp.75-81
    • /
    • 2014
  • Recently, the use of renewable energy has been attracted due to the interest in energy-saving and the reduction of CO2 emission. In order to reduce the energy consumption of the cooling and the heating in the field of the architectural engineering, heat pump systems using renewable energy have been developed and used in various applications. In many researches, integrated heat pump systems are suggested which use solar and geothermal heat as the heat source for cooling and heating. However, it is still difficult to predict the performance of the systems, because the characteristic of heat exchange in each system is complicated and various. In this system, the performance prediction simulation of the heat pump was developed using a dynamic simulation model. This paper describes the summary of the suggested systems and the result of the simulation. The average temperature of the heat source, heating loads and COP were calculated with the cases of different local conditions, different system composition and different operation time by TRNSYS 17.

Studies on the Cycle Simulation for a Geothermal Heat Pump System using CO2 as Refrigerant (CO2 지열 히트펌프 사이클 모사에 관한 연구)

  • Kim, Young-Jae;Chang, Keun-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2888-2897
    • /
    • 2011
  • The performance of a geothermal heat pump system using carbon dioxide was investigated by the steady-state cycle simulation program developed in this study. A parametric study was carried out in order to investigate the effect of various operating conditions on the performance of the basic cycle without an IHX(internal heat exchanger). The simulation program consists of several Fortran subroutines for simulating indoor and outdoor heat exchangers, compressors, and expansion valves and Visual Basic subroutines for the graphic user interface(GUI) consisted with pre-processor for input data and post-processor for the output data. Refprop V6.01 was used for estimating the thermodynamic properties and equilibrium behaviors of carbon dioxide. The simulation results were validated by comparing experimental data through a series of case studies. The cycle simulation program developed in this work would seem to be a useful tool in optimizing and establishing economical and efficient operating conditions in the $CO_2$ geothermal heat pump system.

A Performance Measurement and Evaluation of a 400RT Vertical type Geothermal System installed in a Complex Building Before Occupancy (복합용도 건물에 적용된 400RT급 수직형 지열시스템의 입주전 성능평가)

  • Hwang, Kwang-Il;Shin, Dong-Keol;Kim, Joong-Hun;Shin, Seung-Ho;Jung, Myoung-Kwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.3
    • /
    • pp.7-14
    • /
    • 2008
  • 400RT geothermal system which is the biggest capacity among on-operations at present in Korea is measured and evaluated on 23rd${\sim}$26th Jan. 2008 during those days building is not allowed owners and/or tenants to move in. The geothermal system is consist with vertical-typed 112 geothermal heat exchangers which are installed circle-like 1 row with 4m interval, and has 16 units of 25USRT geothermal-source heat pump(GSHP)s. And each 5 units of circulation pump are running for geothermal heat exchangers and hot water supplies. The followings are the results. The temperatures at G.L. -70m of 2 boreholes are varied quite similarly. The average temperature difference between inlet and outlet of geothermal pipes is $4.1^{\circ}C$, and that of hot water supply is $3.2^{\circ}C$, of Zone 3's each 4 GSHPs when being operated. Despite temperature fluctuations by heating loads, the average temperature difference between main pipes of inlet and outlet of geothermal heat exchangers is measured as $4.1^{\circ}C$. This study propose "Geothermal System COP" which includes not only consumed electric power by compressor but also circulation pumps and auxiliary utilities. By comparing the geothermal system COP with GSHP's performance specification, it is clear that the performances of GHSPs of this site are satisfied with the specification.