1 |
Kavanaugh, S. and Rafferty, K., 2014, Geothermal Heating and Cooling: Design of Ground-Source Heat Pump Systems, ASHRAE, Atlanta.
|
2 |
Kavanaugh, S., 1998, A design method for hybrid ground-source heat pump, ASHRAE Trans., Vol. 104, pp. 691-698.
|
3 |
Yavuzturk, C. and Spitler, J., 2000, Comparative study to investigate operating and control strategies for hybrid ground source heat pump systems using a short time-step simulation model, ASHRAE Transactions, Vol. 106, pp. 192-209.
|
4 |
Man, Y., Yang, H., and Wang, J., 2010, Study on hybrid ground-coupled heat pump for air-conditioning in hotweather areas like Hong Kong, Applied Energy, Vol. 87, pp. 2826-2833.
DOI
|
5 |
Fan, R., Gao, Y. Hua, L., Deng, X., and Shi, J., 2014, Thermal performance and operation strategy optimization for a practical hybrid ground-source heat-pump system, Energy and Buildings, Vol. 78, pp. 238-247.
DOI
|
6 |
Phetteplace, G. and Sullivan, W., 1998, Performance of a hybrid ground-coupled heat pump system, ASHRAE Transactions, Vol. 104, pp. 763-770.
|
7 |
Hackel, S. and Pertzborn, A., 2011, Effective design and operation of hybrid ground-source heat pumps: three case studies, Energy and Buildings, Vol. 43, pp. 3497-3504.
DOI
|
8 |
Sohn, B. and Kwon, H. S., 2014, Performance prediction on the application of a ground-source het pump (GSHP) system in an office building, Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 26, No. 9, pp. 409-415.
DOI
|
9 |
Sohn, B., Choi, J. H., and Min, K. C., 2015, Heating performance of geothermal heat pump system applied in cold climate region (Mongolia), Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 27, No. 1, pp. 31-38.
DOI
|
10 |
Oh, J. H., Cho, J. H., and Nam, Y., 2015, Variations of underground temperature of a solar-geothermal system during operation, Proceedings of the SAREK 2015 Winter Annual Conference, pp. 124-125.
|
11 |
Kline, S. J., 1985, The purpose of uncertainty analysis, J. Fluids Engineering, Vol. 107, pp. 153-160.
DOI
|
12 |
Ruiz-Calvo, F. and Montagud, C., 2014, Reference data sets for validating GSHP system models and analyzing performance parameters based on a five-year operation period, Geothermics, Vol. 51, pp. 417-428.
DOI
|
13 |
KNREC, 2014, Standard and guidelines for new and renewable energy systems, Official announcement and guidelines, Korea New and Renewable Energy Center (KNREC).
|