• Title/Summary/Keyword: Generator Scheduling

Search Result 82, Processing Time 0.02 seconds

Assessment of the CO2 Emission Considering the Generator Maintenance Scheduling (발전기보수유지계획을 고려한 CO2배출량의 추정)

  • Jeon, Dong-Hoon;Park, Jeong-Je;Oh, Tae-Gon;Cho, Kyeong-Hee;Choi, Jae-Seok;Baek, Ung-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1507-1513
    • /
    • 2010
  • The $CO_2$ emission can be decreased due to freedom of generator maintenance scheduling(GMS). This paper proposes assessment of $CO_2$ emission considering generator maintenance scheduling(GMS) and evaluates effect of the GMS on $CO_2$ emission. And also, this paper assesses the $CO_2$ emission and the probabilistic production cost simulation of nuclear and thermal power generators considering operation of hydro and pumped generator. The minimum reliability criterion level satisfied production cost minimization function model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system in Korea in 2010.

The Generator Maintenance Scheduling using Fuzzy Multi-criteria (퍼지다목적함수를 이용한 발전기보수유지계획의 수립)

  • 최재석;도대호;이태인
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1995.10b
    • /
    • pp.131-138
    • /
    • 1995
  • A new technique using integer programming based on fuzzy multi-criteria function is proposed for generator maintenance scheduling. Minimization maintenance delay cost and maximization reserve power are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria integer programming is used. In the maintenance scheduling, a characteristic feature of the presented approach is that the crisp constraints with uncertainty can be taken into account by using fuzzy set theory and so more flexible solution can be obtained. The effectiveness of the proposed approach is demonstrated by the simulation results.

  • PDF

An Effective Priority Method Using Generator's Discrete Sensitivity Value for Large-scale Preventive Maintenance Scheduling (발전기 이산 민감도를 이용한 효율적인 우선순위법의 대규모 예방정비계획 문제에의 적용 연구)

  • Park, Jong-Bae;Jeong, Man-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.3
    • /
    • pp.234-240
    • /
    • 1999
  • This paper presents a new approach for large-scale generator maintenance scheduling optimizations. The generator preventive maintenance scheduling problems are typical discrete dynamic n-dimensional vector optimization ones with several inequality constraints. The considered objective function to be minimized a subset of{{{{ { R}^{n } }}}} space is the variance (i.g., second-order momentum) of operating reserve margin to levelize risk or reliability during a year. By its nature of the objective function, the optimal solution can only be obtained by enumerating all combinatorial states of each variable, a task which leads to computational explosion in real-world maintenance scheduling problems. This paper proposes a new priority search mechanism based on each generator's discrete sensitivity value which was analytically developed in this study. Unlike the conventional capacity-based priority search, it can prevent the local optimal trap to some extents since it changes dynamically the search tree in each iteration. The proposed method have been applied to two test systems (i.g., one is a sample system with 10 generators and the other is a real-world lage scale power system with 280 generators), and the results anre compared with those of the conventional capacith-based search method and combinatorial optimization method to show the efficiency and effectiveness of the algorithm.

  • PDF

VMS Emulator System with Real-Time Scheduling

  • Kim, Jung-Sook
    • Journal of Multimedia Information System
    • /
    • v.1 no.2
    • /
    • pp.95-100
    • /
    • 2014
  • Variable message signs (VMS) have the different sizes and a specific type according to the city scene and it has to be displayed by different message on the display panel in real-time. And VMS manufacturers must produce the different products in order to give a customized product to each order. In addition that, they should test and check the correct operation to each VMS product using the different message frame. That is very time and workers consuming and VMS emulator with an automatic variable message generator system is necessary. Also, the automatic message generator system is needed to real-time scheduling in order to display the message on the VMS panel like real world. In this paper, we design and implement the VMS emulator embedded the automatic message frame generator system with real-time scheduling which can set several parameters easily on the windows dialog.

  • PDF

A Study on the Development of Generator Maintenance Scheduling Program Package (발전기 예방정비계획 전산화모형 개발에 관한 연구)

  • Won, Jong-Ryul;Yoon, Yong-Beum;Park, Si-Woo;Nam, Jae-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.11
    • /
    • pp.1374-1381
    • /
    • 1999
  • This paper describes development of a package for generator maintenance scheduling program with user-friendly interactive mode. Generator maintenance scheduling is to select desirable maintenance periods of generators in the given interval satisfying reliability or economic criteria. Window-based system for user-friendly mode and Oracle-based database system for efficient data management are established in our package. Reserve rate levelization and LOLP minimization are performed in calculation mode, which is composed of DLL programs. Many graphs and charts are illustrated for the user-analysis. Operation is carried out by day-based unit, not by week. The case study has been conducted with the data of practical KEPCO power system in 1999 and successfully demonstrated its effectiveness.

  • PDF

A Daily Scheduling of Generator Maintenance using Fuzzy Set Theory combined with Genetic Algorithm (퍼지 집합이론과 유전알고리즘을 이용한 일간 발전기 보수유지계획의 수립)

  • Oh, Tae-Gon;Choi, Jae-Seok;Baek, Ung-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1314-1323
    • /
    • 2011
  • The maintenance of generating units is implicitly related with power system reliability and has a tremendous bearing on the operation of the power system. A technique using a fuzzy search method which is based on fuzzy multi-criteria function has been proposed for GMS (generator maintenance scheduling) in order to consider multi-objective function. In this study, a new technique using combined fuzzy set theory and genetic algorithm(GA) is proposed for generator maintenance scheduling. The genetic algorithm(GA) is expected to make up for that fuzzy search method might search the local solution. The effectiveness of the proposed approach is demonstrated by the simulation results on a practical size test systems.

Constraint Description language and Automatic Code Generator for Single-Machine Job Sequencing Problems (단일기계 일정계획을 위한 제약조건 표현언어 및 코드 자동생성기)

  • Lee, You-K.;Baek, Seon-D.;Bae, Sung-M.;Jun, Chi-H.;Chang, Soo-Y.;Choi, In-J.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.2
    • /
    • pp.209-229
    • /
    • 1996
  • Scheduling problems which determine the sequence of jobs are one of the Important issues to many industries. This paper deals with a single-machine job sequencing problem which has complex constraints and an objective function. To solve the problem, an expressive constraint description language and an automatic code generator are developed for our scheduling system. The user just needs to describe the scheduling problem using the constraint description language that allows to express both quantitative and qualitative constraints as well as an objective function in real world semantics. Then, a complete scheduling program based on constraint satisfaction technique is automatically generated through the code generator. Advantage of this approach is that models of the scheduling problems are easily developed and maintained because models ore formulated by using the language which reflects real world semantics.

  • PDF

Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System

  • Park, Jeong-Je;Choi, Jae-Seok;Baek, Ung-Ki;Cha, Jun-Min;Lee, Kwang-Y.
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.8-15
    • /
    • 2010
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

An Algorithm for Generator Maintenance Scheduling Considering Transmission System (송전계통을 고려한 계통운용자의 발전기 예방정비계획 알고리즘에 관한 연구)

  • Han Seok-Man;Shin Young-Gyun;Kim Balho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.7
    • /
    • pp.352-357
    • /
    • 2005
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules when the collective maintenance schedule reported to 50 by Gencos not satisfy the specified operating criteria, such as system reliability or supply adequacy. This paper presented a method that divides generator maintenance scheduling of the 50 into a master-problem and a sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem. And, the 50 should use the open information only, because the information such as cost function of a generator and bidding Price is highly crucial for the strategies of profit maximization.

A Study on Generator Maintenance Scheduling Considering Renewable Energy Generators (신재생에너지 발전원을 고려한 발전기 예방정비계획수립에 관한 연구)

  • Lee, Yeonchan;Oh, Ungjin;Choi, Jaeseok;Jung, Myeunghoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.5
    • /
    • pp.601-610
    • /
    • 2018
  • The purpose of this paper is to establish a new optimum Generator Maintenance Scheduling(GMS) considering renewable energy generator. In this paper, the total renewable energy generation is estimated using hourly capacity factor of renewable energy generator. The GMS was optimized with the objective function of maximizing the minimum reserve rate, minimizing the probabilistic production cost, minimizing the loss of load expectation, and minimizing $CO_2$ emissions. In the case study of this paper, GMS considering renewable energy and GMS not considering renewable energy are shown by each objective function. And it shows scenarios of the reliability, the environmental and economical factors when two nuclear power plants inputted and ten coal thermal power plants shut downed respectively.