References
- Korea Power Exchange, "The 7th Basic Plan for Long-term Electricity Supply and Demand".
- L.L. Garver, "Adjusting Maintenance Scheduling to Levelize Risk", IEEE PAS-91, Sep./Oct, pp.2057-2062, 1972.
- H. H. Zurn, V. H. Quintana, "Generator Maintenance Scheduling via Successive Approximation Dynamic Programming", IEEE PAS-94, Mar/Apr pp. 665-671, 1975. https://doi.org/10.1109/T-PAS.1975.31894
- J. F. Dopazo and H. M. Merrill, "Optimal Generator Maintenance Scheduling using Integer Programming," IEEE PAS-94, Sep/Oct, pp. 1537-1545, 1975. https://doi.org/10.1109/T-PAS.1975.31996
- H.H.Zurn and V.H.Quintana, "Several Objective Criteria for Optimal Generator Preventive Maintenance Scheduling," IEEE PAS-96, May./Jun, pp. 984-992, 1977 https://doi.org/10.1109/T-PAS.1977.32412
- H.Khatib, "Maintenance Scheduling of Generating Facilities," IEEE, PAS-98, Sep./Oct. pp.1604-1607, 1979
- Zia Yamayee, K.Sidenblad and Miki Yoshimura, "A Computationally Efficient Optimal Maintenance Scheduling Method," IEEE PAS-102, Feb pp.330-338, 1983.
- X. Wang, J.R. McDonald, 1994, "Modern Power System Planning," McGraw-Hill Book Company.
- E.L. Silva, M. Morozowski etc, "Transmission Constrained Maintenance Scheduling of Generating Units: A Stochastic Programming Approach," IEEE Trans. on PS, Vol. 10, No. 2, pp. 695-701, 1995.
- M.K.C. Marwali and S.M. Shahidehpour, "Integrated Generation and Transmission Maintenance Scheduling with Network Constraints," IEEE Trans. on PS, Vol. 13, No. 3, pp. 1063-1068, 1998.
- Song, K. Y., J. S. Choi, and Y. H. Kim. "A Study on the Probabilistic Production Costing Simulation using Fast Hartley Transform-with considering Hydro and Pumped-Storage Plants," Proceedings of the KIEE Conference. The Korean Institute of Electrical Engineers.
-
Donghoon Jeon, Jeongje Park, Taegon Oh, Kyeonghee Cho, Jaeseok Choi, Ungki Baek, "Assessment of the
$CO_2$ Emission Considering the Generator Maintenance Scheduling," KIEE, Vol. 59, No. 9, pp. 1507-1513, 2010. (Korean) - Jeongje Park, Jaeseok Choi, Ungki Baek, Junmin Cha and Kwang Y. Lee, "Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System," KIEE, Journal of Electrical Engineering & Technology, Vol. 5, No. 1, pp. 8-15, March. 2010. https://doi.org/10.5370/JEET.2010.5.1.008
-
Taegon Oh, Ungki Baek, JaeSeok Choi, "Stablishment of Generator Maintenance Scheduling Considering Minimization of
$CO_2$ Emissions," KIEE, Vol. 6, No. 4, pp. 705-710, 2011.(Korean) - Taegon Oh, Jaeseok Choi, Ungki Baek, "A Daily Scheduling of Generator Maintenance using Fuzzy Set Theory combined with Genetic Algorithm," KIEE, Vol. 60, No. 7, pp. 1314-1323, 2011.(Korean)
- Yeonchan Lee, Ungjin Oh, Jaeseok Choi, Junmin Cha, Hongseok Choi, Donghun Jeon, "Conversion Function and Relationship of Loss of Load Expectation Indices on Two Kinds of Load Duration Curve," The Transactions of the Korean Institute of Electrical Engineers, Vol. 66 No. 3, pp. 475-485, 2017.(Korean) https://doi.org/10.5370/KIEE.2017.66.3.475