• Title/Summary/Keyword: G7 High-Speed Train

Search Result 66, Processing Time 0.023 seconds

Numerical Analysis of 3-D Turbulent Flows Around a High Speed Train Including Cross-Wind Effects (측풍영향을 고려한 고속전철 주위의 3차원 난류유동 해석)

  • Jung Y. R.;Park W. G.;Ha S. D.
    • Journal of computational fluids engineering
    • /
    • v.1 no.1
    • /
    • pp.71-80
    • /
    • 1996
  • An iterative time marching procedure for solving incompressible turbulent flow has been applied to the flows around a high speed train including cross-wind effects. This procedure solves three-dimensional unsteady incompressible Reynolds-averaged Navier-Stokes equations on a non-orthogonal curvilinear coordinate system using first-order accurate schemes for the time derivatives and third/second-order accurate schemes for the spatial derivatives. Turbulent flows have been modeled by Baldwin-Lomax turbulent model. To validate present procedure, the flow around a high speed train at zero yaw angle was simulated and compared with experimental data. Generally good agreement with experiments was achieved. The flow fields around the high speed train at 9.2°, 16.7°, and 45° of yaw angle were also simulated.

  • PDF

A Study on Optimization of the Overall Measurement System for HEMU-400X (차세대고속열차 종합계측시스템 최적화 방안 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Lee, Jin-Jong;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1-6
    • /
    • 2011
  • In Korea, high-speed train(HEMU-400X) system with distributed power is being developed, and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea, as well as for the development of train system and evaluation system included evaluation technology is needed. Accordingly, a comprehensive and efficient OMS(Overall Measurement System) was build up for verifying the performance of HEMU-400X. By the case study of the G7 and TTX, OMS of HEMU-400X was improved the test performance and maintainability. In particular, the existing Window-based systems has a limit to the control, due to this reason OMS applying enhanced RT(Real-time) system. In this study, compare the advantages and disadvantages of RT systems with Window-based systems, as well as the configuration of the RT systems.

  • PDF

Analysis of crosswind around G7 and TTX (G7 TTX 및 차량의 측풍 해석)

  • Kim Tae-yoon;Lee Bo-sung;Kwon Hyeok-Bin;Ko Tae-hwan;Lee Dong-ho
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.138-143
    • /
    • 2005
  • In this study, the cross-wind stability of the G7 train and TTX running under the high speed was investigated by using 2-dimensional Reynolds Averaged Navier-Stokes equations. It is very important to analysis the aerodynamic characteristic of bluff body located near a ground at the field of the aeronautical, wind engineering, ground vehicle system. To the point of running stability, it is meaningful to analysis the cross-wind effect to the G7 train and TTX developed by domestic technology. The aerodynamic characteristics of the G7 train equipped by bogie-cover is more superior to the case without bogie-cover. Also 2nd model of TTX has stream-shape body has the more good performance than 1st model of TTX.

  • PDF

Results of R & D for Drive Train System of Korea High-Speed Train (한국형 고속전철 감속구동장치 개발 및 성과)

  • Cha Soo-Deok;Kim Yong-Kee;Lee Min-Soo
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.561-566
    • /
    • 2003
  • Research and development project for the gearboxes of Korea High Speed Train is being run as one of the 'G7 Project' to achieve the Technical Independency in the area for the High Speed - High Load Gearboxes. Executing this project we domesticate the technologies for Design, Analysis, Manufacturing and Testing. Acquired high-technologies can be applied not only to the Rolling Stocks, but also to other Industrial Areas including the Cars and Aerovehicles. The prototypes had been tested on the roller rig and are being tested on the railway.

  • PDF

The Scenary Design for the Service car of High Speed Train (고속전철 부속실 풍경 디자인)

  • 한송이;이선영;최혁수;이병종;정경렬
    • Proceedings of the Korea Society of Design Studies Conference
    • /
    • 2000.11a
    • /
    • pp.84-85
    • /
    • 2000
  • G7 고속전철개발 산업에서 계획된 부속실은 경부 고속전철(K-TGV)의 부속실을 그대로 사용하는 것으로서 좁은 통로와 획일적 공간, 불필요한 공간에 의한 승객 편의시설의 결여되었기에, 이의 수정보완이 요구되었다. 아래의 사진들은 K-TGV의 부속실 모습이다. (중략)

  • PDF

A Current Collection Performance On-line Test Plan in Korea High Speed Train Development Project (고속전철 기술개발사업 본선 시운전 집전시험계획)

  • 조용현;최강윤;백광선
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.156-162
    • /
    • 2001
  • Current collection performance on-line tests for a Korean High Speed Train being developed in G7 project is scheduled to start in June, 2002. In this paper, preparatory efforts for measuring contact forces which is regarded as one of major measuring items in the test are introduced. Specifically speaking, review of frequencies related with contact force fluctuations, brief of contact force measuring algorithm, review of measuring instrument specifications and development of a data acquisition program are presented.

  • PDF

Development of High Speed Train Performance Simulation Software (고속전철 차량시스템의 주행성능 예측 소프트웨어의 개발)

  • Jeong, Gyeong-Ryeol;Kim, Sang-Heon;Park, Su-Hong;Lee, Jang-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.1 s.173
    • /
    • pp.134-143
    • /
    • 2000
  • A train performance simulation (TPS) software is a computer program that simulates the operation of a train system over a specified railway route and it is widely used in railroad operation and research applications. Numerical and graphical results from the simulation software, which is developed in this study, provide information on such performance variables as travel time. running speed, energy consumption at a specific time interval and in overall service time as the train moves along the route. Three types of input data are required for a computer simulation: track information, train information, and running conditions. The simulation of train performance starts with several simple mathematical models including train configuration. traction efforts, running resistance. and braking requirements. Based on the basic specifications of Korean High Speed Railway, System. this study, puts a focus on the estimation and assessment of train performance comparing. the specific train configurations of KEST20/11. CPLE20/10. PROP20/10, which are proposed from the previous G7 projects.

Speed Up Test on conventional Line by using Korean High Speed Train(HSR-350x) (한국형 고속 전철을 활용한 기존선 속도향상 고찰)

  • Kim Ki-Hwan;Park Choon-Soo;Kim Seok-Won
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.334-338
    • /
    • 2004
  • KTX has started commercial service from Seoul to Busan and Mokpo since April 1, 2004. The service line is composed of new-high speed line and conventional line. Before KTX is runs, the maximum operational speed on conventional line was 140km/h. In order to reduce the traveling time, operation speed of KTX must be increased on the conventional line. So, we performed test running with prototype HSR-350x and verification of safety was made in $10\%$ speed-up. Korean High Speed Train HSR-350x) was developed by G7 - R&D project. In this study, in safety aspect, several technical reviews are introduced and the possibility for reduction of traveling time is investigated on the conventional line by using HSR-350x.

  • PDF

A Study on Performance Characteristics for Auxiliary Converter of Korean High Speed Train (한국형 고속열차 보조컨버터 성능 특성에 관한 연구)

  • Han, Young-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.247-249
    • /
    • 2006
  • As the on-board electric devices determine the performances of vehicles, production of reliable devices is important. To keep the reliability of devices constant, management of performance evaluation of the on-board devices is crucial. Because temperature bas a serious effect on failures of the components of the devices, its measurement is the first step for good management. In this study, we described performance characteristics of domestic auxiliary block developed through G7 project. We measured the performances of auxiliary block during test running by the developed on-line measurement system. After we save the input real-time data from each signal of Korean High Speed Train through the network line, we can acquire necessary information through Post-Processing program. We verify the auxiliary converter characteristics of Korean High Speed Train by this system.

  • PDF