• Title/Summary/Keyword: Flood Situation

Search Result 107, Processing Time 0.036 seconds

Failure Probability Assessment for Risk Analysis of Concrete Gravity Dam under Flood (홍수 시 콘크리트 중력식댐의 위험도 분석을 위한 파괴확률 산정)

  • Cho, Soojin;Shin, Sung Woo;Sim, Sung-Han;Lim, Jeong-Yeul
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.6
    • /
    • pp.58-66
    • /
    • 2016
  • This study aims to estimate the failure probability of concrete gravity dams for their risk analysis under flood situation. To the end, failure modes of concrete gravity dams and their limit state functions are proposed based on numerous review of domestic and international literatures on the dam failure cases and design standards. Three failure modes are proposed: overturning, sliding, and overstress. Based on the failure modes the limit state functions, the failure probability is assessed for a weir section and a non-weir section of a dam in Korea. As water level is rising from operational condition to extreme flood condition, the failure probability is found to be raised up to the warning condition, especially for overturning mode at the non-weir section. The result can be used to reduce the risk of the dam by random environmental variables under possible flood situation.

IMPLEMENTATION OF A DECISION SUPPORT SYSTEM FOR INTEGRATED RIVER BASIN WATER MANAGEMENT IN KOREA

  • Shim Soon-Do;Shim Kyu-Cheoul
    • Water Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.157-176
    • /
    • 2004
  • This research presents a prototype development and implementation of Decision Support System (DSS) for integrated river basin water management for the flood control. The DSS consists of Relational Database Management System, Hydrologic Data Monitoring System, Spatial Analysis Module, Spatial and Temporal Analysis for Rainfall Event Tool, Flood Forecasting Module, Real-Time Operation of Multi Reservoir System, and Dialog Module with Graphical User Interface and Graphic Display Systems. The developed DSS provides an automated process of alternative evaluation and selection within a flexible, fully integrated, interactive, centered relational database management system in a user-friendly computer environment. The river basin decision-maker for the flood control should expect that she or he could manage the flood events more effectively by fully grasping the hydrologic situation throughout the basin.

  • PDF

Flood Forecasting and Utilization of Radar-Raingauge in Japan

  • Kazumasa, Ito;Shigeki, Sakakima;Takuya, Yagami
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.62-71
    • /
    • 2004
  • There are 109 A class rivers in Japan. One purpose of river management is to reduce the flooding. For this purpose, government provides the information to public, as flood forecasting, rainfall forecasting and estimate the runoff magnitude to avoid the flood and inundation. In this paper, we introduce current situation of flood forecasting and rainfall forecasting in Japan, and we describe how to use the information of flood forecasting and rainfall forecasting in conjunction with current strategy for river management.

  • PDF

Modeling Downstream Flood Damage Prediction Followed by Dam-Break of Small Agricultural Reservoir (농업용 소규모 저수지의 붕괴에 따른 하류부 피해예측 모델링)

  • Park, Jong-Yoon;Joh, Hyung-Kyung;Jung, In-Kyun;Jung, Kwan-Soo;Lee, Joo-Heon;Kang, Bu-Sik;Yoon, Chang-Jin;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.63-73
    • /
    • 2010
  • This study is to develop a downstream flood damage prediction model for efficient confrontation in case of extreme and flash flood by future probable small agricultural dam break situation. For a Changri reservoir (0.419 million $m^3$) located in Yongin city of Gyeonggi province, a dam break scenario was prepared. With the probable maximum flood (PMF) condition calculated from the probable maximum precipitation (PMP), the flood condition by dam break was generated by using the HEC-HMS (Hydrologic Engineering Center - Hydrologic Modeling System) model. The flood propagation to the 1.12 km section of Hwagok downstream was simulated using HEC-RAS (Hydrologic Engineering Center - River Analysis System) model. The flood damaged areas were generated by overtopping from the levees and the boundaries were extracted for flood damage prediction, and the degree of flood damage was evaluated using IDEM (Inundation Damage Estimation Method) by modifying MD-FDA (Multi-Dimensional Flood Damage Analysis) and regression analysis simple method. The result of flood analysis by dam-break was predicted to occurred flood depth of 0.4m in interior floodplain by overtopping under PMF scenario, and maximum flood depth was predicted up to 1.1 m. Moreover, for the downstream of the Changri reservoir, the total amount of the maximum flood damage by dam-break was calculated nearly 1.2 billion won by IDEM.

Operational Improvement of Small Urban Storm Water Pumping Station (2) - Comparative Study to Reduce the Flooding Problems using Flood Simulation Model (도시 소유역 배수펌프장 운영개선 방안 연구 (2) - 침수범람모의에 의한 침수방지 방안 비교 연구)

  • Gil, Kyung-Ik;Han, Jong-Ok;Kim, Goo-Hyun
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.1
    • /
    • pp.110-115
    • /
    • 2006
  • Flooding situation of Sutak basin was simulated and simulation seemed to be consistent with the real flooding situation in terms of high water levels and timings of flooding. The flood simulation model was used to evaluate alternatives to mitigate flooding problems in Sutak basin. From the evaluation of flood mitigation plans, it was found that combined operation of Sutak and Inchang pumping stations through partial diversion of inflow of Sutak pumping station to Inchang pumping station was the most effective one among the suggested mitigation plans. About 500 meter diversion channel will be needed to send 30% of Sutak pumping station inflow to Inchang pumping station. This will reduce overload of Sutak pumping station and the storage capacity of Inchang pumping station will be more efficiently utilized.

Two-Dimensional(2-D) Flood Inundation Modeling Considering Mesh Type and Resolution (격자유형과 해상도를 고려한 2차원 홍수범람 모델링)

  • Kim, Byunghyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.2
    • /
    • pp.247-256
    • /
    • 2019
  • In this study, 2-D Godunov type finite volume model which can apply the mixed mesh including triangular and quadrilateral meshes for flood inundation modeling is used to compare and analyze the flood height, flood extent and model execution time according to mesh type and resolution. The study area is the Upton-upon Severn watershed in Great Britain, where the flood occurred for 22 days from October 29 to November 19, 2000. For the flood modeling, topographic data were constructed using high resolution LiDAR (Light Detection And Ranging). The results of the 2-D flood modeling by the mesh type and resolution were compared with four ASAR (Airborne Synthetic Aperture Radar) images captured during the flood period. This study has shown that flood height and extent can vary greatly depending on the mesh type and resolution, even if identical topography and boundary conditions are used, and that the selection of appropriate mesh type and resolution for the purpose and situation of the 2-D flood modeling is necessary.

Application of Stormwater Detention Facilities for Lacking Capacity of Sewers (강우시 도시 하수관거통수능부족 해소를 위한 우수저류시설의 적용)

  • Kim, Young-Ran;Kim, Jin-Young;Hwang, Sung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.3
    • /
    • pp.343-350
    • /
    • 2004
  • For the last two decades, Seoul has always been affected by large floods. As climate change causes more frequent localized heavy rains exceeding the capacity of sewer or river to discharge water, flood damage is expected to increase. Under the situation, detention facilities for lacking capacity of sewers can control stormwater runoff to reduce flood damage in urbanized areas. In this study, in order to reduce flood damage in Cheonggyecheon areas, the capacity of detention facilities was decided to make up for the lacking capacity of main sewers in case of the rainfall in July, 2001 as large flood. The average amount of stormwater detained in eight Cheonggyecheon drainage areas is $235.09m^3/ha$. Location and size of stormwater detention facilities is designed to have effects in short term by targeting the reduction of flood damage. Schools and parks are suggested as optimal locations where detention facilities are constructed in drainage areas.

Alternatives on The Rehabilitation & Upgrading of Irrigation Facilitties by Agriculture Situation Change (농업여건 변화에 따른 수리시설 개보수 방향)

  • Lee, Young-Il;Kim, Hyeon-Soo;Jun, Taek-Ki
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.38-44
    • /
    • 2005
  • Rehabilitation and upgrading of the irrigation facilities are usually for the reservoirs, pumping stations, and other facilities in the paddy fields. Changes in food consumption patterns have taken place in Korea and there are growing foreign demands that we open our agricultural products market. In accordance with this situation, farmers are turning increasingly to growing vegetables which provide a high income cash crop. It is necessary to irrigate by pressure through pipe lines in farming facilities and mass production farming. Flood damage occurs as a result of heavy rainfall. The design criteria should be followed to minimize the risk of the flood damage in rehabilitation and upgrading.

  • PDF

A study on prediction method for flood risk using LENS and flood risk matrix (국지 앙상블자료와 홍수위험매트릭스를 이용한 홍수위험도 예측 방법 연구)

  • Choi, Cheonkyu;Kim, Kyungtak;Choi, Yunseok
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.657-668
    • /
    • 2022
  • With the occurrence of localized heavy rain while river flow has increased, both flow and rainfall cause riverside flood damages. As the degree of damage varies according to the level of social and economic impact, it is required to secure sufficient forecast lead time for flood response in areas with high population and asset density. In this study, the author established a flood risk matrix using ensemble rainfall runoff modeling and evaluated its applicability in order to increase the damage reduction effect by securing the time required for flood response. The flood risk matrix constructs the flood damage impact level (X-axis) using flood damage data and predicts the likelihood of flood occurrence (Y-axis) according to the result of ensemble rainfall runoff modeling using LENS rainfall data and as well as probabilistic forecasting. Therefore, the author introduced a method for determining the impact level of flood damage using historical flood damage data and quantitative flood damage assessment methods. It was compared with the existing flood warning data and the damage situation at the flood warning points in the Taehwa River Basin and the Hyeongsan River Basin in the Nakdong River Region. As a result, the analysis showed that it was possible to predict the time and degree of flood risk from up to three days in advance. Hence, it will be helpful for damage reduction activities by securing the lead time for flood response.

The investigation of field condition on flood protection of substation and underground power equipment (pad-mounted transformers & switches) (수변전실 및 지중 배전기기의 침수 방지 관련 현장 조사 분석)

  • Kim, Gi-Hyun;Choi, Myeong-Il;Bae, Suk-Myong;Lee, Jae-Yong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.327-331
    • /
    • 2007
  • Inundation of substation and underground power equipment(pad-mounted transformers & switches) breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation of substation and underground power equipment, it occurs a great economic loss owing to recovery time and events of electric shock occur by inundation electrical facility. So we search the damage situation and installation situations. Therefore we propose the necessity of protection of flood at low-lying downtown and low-tying shore. This paper will be used to present a reform proposal of electrical related law about flood protection of existing power equipment.