The combustion characteristics of roof 'Jucsim' structure was analysed using real scale fire test on wooden structure heritage building. the fire test model was made to consider roof timberling internal structure for a Sunglemun. Structure of test body layed lime, soil, 'Jucsin' and ceiling board excepting roof tile to find heat propagation process by setting thermocouples. The first test to find fire growth and heat propagation process in the part of ceiling. The second test organized to find the efficiency of fire proof paint between ceiling board and inside of Jucsim structure. The third test try to get the performance level of fire proof fabric with the same manner. The result showed from the test proof the heavy smoke exposure with limited effect of fire proof paint however, reliable fire resistance effect showed in case of fire proof fabric.
Journal of Korean Association for Spatial Structures
/
v.16
no.2
/
pp.55-60
/
2016
The Membrane structure has a number of problems in the application of a fireproof code based on general buildings codes. Thus, the fireproof code of membrane structure is necessary to activate the construction of the membrane structure. Because it requires a systematic classification of fire retardant and flame proof performance of membrane material. Fire retardant and flame proof tests are conducted on membrane materials mostly used in current construction to propose the fire and flame retardant performance criteria of membrane materials. Fire and flame retardant tests results, PTFE membrane material with the glass fiber fabric have a limit-combustible performance. PVDF membrane material with the polyester fabric does not ensure the fire retardant performance, but this membrane material has the flame retardant performance of a thick fabric. Also, ETFE does not ensure the fire retardant performance, but this membrane material has the flame retardant of a thin fabric.
Kim, Jang-Ho;Park, Hae-Geun;Lee, Myeong-Sub;Won, Jong-Pil;Lim, Yun-Mook;Lee, Kyong-Min
Proceedings of the Korea Concrete Institute Conference
/
2006.11a
/
pp.633-636
/
2006
High-rise and large size buildings require high strength concrete and steel structure as a necessity. However, high strength concrete and steel structure are strong material but have a weakness to high temperature. Therefore, fire protection is a matter that must be considered very importantly in design for structure of high strength concrete and steel. Fire proof board that is existing method for fire proof has relatively low performance in fire protection emphasizes the need of new fire protection material due to the using of in numerable inflammables like plastics. The objective of this study is to understand the fire-resisting performance of newly developed fire protection material for building. This paper describes the results of fire tests using ISO curve that is fire protection regulation for buildings of the newly developed cementitious fire protection coating material applied concrete tunnel lining specimens.
Kim, Hyunju;Roh, Sam-Kew;Kim, Dong Cheol;Ham, Eun-Gu
Journal of the Society of Disaster Information
/
v.8
no.3
/
pp.297-303
/
2012
This study examines the isolation-heat performance of fire proof fabric that is equipped over ceiling board in order to secure the capability of arresting the spread of a fire at roof 'Jucsim' structure of Wooden Cultural Properties. For this examination, I conduct experiments with the model and compare two construction methods of fire proof fabric, or flat-type, folding-type. The experiments show the following results. In case of installing the fire proof fabric in flat-type, when the temperature under the ceiling board is $750^{\circ}C$, the temperatures over the ceiling board is $50^{\circ}C$; the difference is $700^{\circ}C$. Compared with the case of removing fire proof fabric, the temperature over the ceiling board is lower by approximately $580^{\circ}C{\sim}600^{\circ}C$. Therefore it can be said that the construction of fire proof fabric enhances the isolation-heat performance. In case of installing the fire proof fabric in folding-type, when the temperature under the ceiling board is $600^{\circ}C$, the temperatures over the ceiling board is $65^{\circ}C$; the difference is approximately $530^{\circ}C$. Thus its isolation-heat performance is a little inferior to the flat-type equipment.
Article 325 (Prevention of Fire Explosion due to Electrostatic) of the Rule for Occupational Safety and Health Standard specifies that in order to prevent the risk of disasters caused by static electricity, fire, explosion and static electricity in the production process, However, in order to do this, it is absolutely necessary to use a pre-detection technology and a detector for antistatic discharge prediction, which is a precautionary measure by static electricity in a fire / explosion hazard place, but in Korea, And there is no technical standard for the application of the technology of the explosion proof structure of the related equipment. Research methods include domestic and overseas electrostatic discharge detection technology and literature investigation of related equipment explosion proofing technology, domestic and foreign electrostatic discharge detection device production and use situation investigation, advanced foreign technology data analysis and benchmarking. In particular, we sought to verify the results of empirical experiments using electrostatic discharge detection technology through sample purchase and analysis of related major products, development of optimization technology through prototype production, evaluation, and supplementation, and expert knowledge through expert consultation. The results of this study were developed and fabricated two prototypes of electrostatic discharge detector based on the technology / standard related to electrostatic discharge detection technology in Korea and abroad through development of electrostatic discharge detection technology and development and production of detector. In addition, based on the development of electrostatic discharge detection technology, we developed an intrinsic safety explosion proof ib class explosion proof technology applicable to the process of using and handling flammable gas and flammable liquid vapor and combustible dust. In the case of the over voltage and minimum voltage are supplied to the explosion-proof structure ESD detector, check the state of the circuit and the transient and transient currents generated by the coil and capacitor elements during the input and standby of the signal pulse voltage. Explosion-proof equipment-Part 11: Intrinsically safe explosion proof structure The comparative evaluation with the reference curve in Annex A of "i" confirms that the characteristics of the intrinsically safe explosion protection structure are met.
Kim, Seung-Hwan;Kim, Kyung-Sik;Heo, Seung-Geon;Lee, Jae-Hun
Journal of the Korean Institute of Gas
/
v.24
no.4
/
pp.18-24
/
2020
The purpose of this study is to validate thermal hinderance effects, i.e., feasibilities, of fire-proof structure for LPG tank exposed to fire from adjacent burning building. The panel materials suggested for the fire-proof structure are (1) 10 mm-thick wood, (2) wood with fireproof coating, (3) 75 mm-thick Expanded Polystyrene, (4) 75 mm-thick glass wool filled sandwich panel, and (5) 75 mm-thick autoclaved lightweight concrete. The square planar fire source of 1 ㎡, a matrix of nozzles releasing 120-140 g/s of LPG, is used to heat up the wall and the tank beyond, mimicking heat transfer from burning exterior wall finishes. The feasibility is tested by inspecting structural integrity after test, and then by examining temperatures at both sides of panels and tank's front surface as well as heat fluxes. As a result, it can be concluded that, among the suggested sample materials, fire-proof wall with ALC panel only showed the feasibility for explosion prevention with the proven evidences of structural integrity and least increase in temperature of tank.
Under the present code, sprinkler heads operating simultaneously are fixed at 30 in number, irrelavant to building use. But, apartment buildings in korea have mostly wall-and-slab structure and every house hold is separated by fire-proof wall. Therefore, apropriate review about present system should be made for the safety assurance by reasonable effort.
Journal of the Korea institute for structural maintenance and inspection
/
v.18
no.5
/
pp.51-58
/
2014
This paper presents a fire exposure test result to evaluate fire resistance capacity of retrofit method using FRP (Fiber Reinforced Polymer) in reinforcement concrete structure. Especially, this paper focused on near-surface-mounted retrofit method; FRP is mounted into the groove after making a groove in concrete. In the test, main parameters are retrofit method and materials for fire proofing. Spray type of perlite and board type of calcium silicate were considered as external fire proof on surface while particle of calcium silicate and polymer mortar as internal one in groove. By increasing the temperature of inside heating furnace, the transfer of temperature from surface of fire proofing material to groove in specimen was measured. As a result, fire proofing using the board of calcium silicate was more effective to delay the heat transfer from outside than spraying with perlite. It was found that the fire proofing could resist outside temperature of $820^{\circ}C$ at maximum to keep the temperature of epoxy below glass transit temperature (GTT).
Journal of the Architectural Institute of Korea Structure & Construction
/
v.33
no.12
/
pp.19-27
/
2017
This paper is a study to improve the fire-resistance capacity of reinforced concrete (RC) members strengthened by fiber-reinforced-polymer (FRP). The fire resistance of the RC members strengthened by FRP was evaluated through high temperature exposure test. In order to improve the fire resistance of the FRP reinforcing method, a fire-proof board was attached to the reinforced FRP surface and then the high temperature exposure test was carried out to evaluate the improvement of the fire resistance performance. It was confirmed that the resistance to high temperature of NSMR could be improved somewhat compared with that of EBR from the experiment that exposed to high temperature under the load corresponding to 40% of nominal strength. When 30 mm thick fire-resistance (FR) board is attached to the FRP surface, the surface of the reinforced FRP does not reach $65^{\circ}C$, which is the glass transition temperature (GTT) of the epoxy until the external temperature reaches $480^{\circ}C$. In particular, when a high performance fire-proof mortar was first applied prior to FR board attachment, the FRP portion did not reach the epoxy glass transition temperature until the external temperature reached $600^{\circ}C$.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.11a
/
pp.179-182
/
2013
Many kinds of fire-stop sealants have been used for joint sealing, cable penetration part sealing and fireproof structure finishing etc in building sectors which need water-proofing and fire-stop properties. But, fire-stop sealant itself has no specific industry standards in Korea even though there are so many required properties for the application. So, in this study, for the evaluation, we adopted and applied UL standard 94(UL 94) which is commonly used for the fire retardant testing in inflammable materials like plastics and rubbers in electronics industry. In this study, we demonstrated fire resistance properties of each fire-stop sealants which varied with different formulation, thickness and origins available in Korea. Overall, fire stop sealant had better fire resistance performance than normal construction sealant. And the thicker the material, the better the fire resistance performance was. Because there is no national or industry guideline for fire stop sealant itself, each sealant products showed different level of performances under UL94 desigation. Even certain product had very poor fire proof propeties although it claims it can be used for the application.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.