• 제목/요약/키워드: Finish work

검색결과 143건 처리시간 0.019초

공동주택 마감공사 중요도 기반 작업지연 요인 분석 (Delay Factors Based on the Importance of Finish Work in Apartment Construction Project)

  • 이승훈;이상효;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • 한국건축시공학회지
    • /
    • 제11권4호
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

빌딩공사의 안전관리정보시스템 개발 (A Development on the Safety Management Information System in Building Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권4호
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

르 꼬르뷔제의 재료 질감 사용 및 색채 표현 - 롱샹성당의 입면과 디테일을 중심으로 - (The Expression of Color and Texture Usage of Finish Material from the Le Corbuisier's Work - Focused on the Elevation and Detail in the Chapel Ronchamp -)

  • 김소희
    • 한국실내디자인학회논문집
    • /
    • 제23권6호
    • /
    • pp.70-77
    • /
    • 2014
  • The purpose of this study is providing a usage of exterior, interior finish materials and color scheme for architectural design and the actual texture and pattern plans of finish materials from Le Corbuisier's work, Chapel Ronchamp. Chapel Ronchamp was analyzed to support the study for the interaction between texture usage and color expression. As a powerful design tool, texture, pattern and color of finish materials are very effective to alter the perception of the facade in the building. Most of architectural buildings, shapes and materials of elevations are monotonous and uniform. This study should be considered by details in the elevation of Chapel Ronchamp. As the part for developing and planning of architectural design, researching color plans and finish material is very important on real expression in the architectural space. As a result, this study will benefit in planning both the exterior and interior environments of color and finish material with texture and pattern.

공동주택 마감공사 공사주체별 작업지연 요인 분석 (Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works)

  • 이승훈;김용만;김주형;김재준
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.73-81
    • /
    • 2011
  • 건설 공사의 궁극적인 목표는 주어진 공사를 요구된 공사기간내에 설계도서에 명시된 품질 기준을 만족시키면서 가장 경제적이고 안전하게 완성하는데 있다. 마감공사는 공종이 세분화되어 매우 다양하고 복잡한 구조를 가지고 있으며 적정 투입 시점에 대한 세부 공종별 기준이 없고, 선후행 작업간의 우선 순위의 정립의 필요성이 약한 것이 특징이다. 본 연구는 마감공사 작업지연을 최소화하기 위하여 마감공사 세부 공종별 작업지연 우선 순위를 선정하여 소요 공기에 맞추어 프로젝트를 완료할 수 있는 정보를 제공하는 것이 목적이다. 본 연구에서 마감공사를 습식공사와 기타 마감공사로 나누어 각 공종별 내역을 기반으로 중요도를 분류하고, 설문을 통해 설계자, 시공자, 협력업체의 작업지연 요인을 분석하여 최종 작업지연 우선 순위를 선정하여 계획 공사기간 내에 공동주택 프로젝트를 완료할 수 있는 정보를 제공하는데 목적이 있다.

동절기 골조공사 시행이 마감공사의 주공정선에 미치는 영향 -아파트 공사의 사례분석을 중심으로- (Influence of the Structural Framework on the Critical Path of Finish Works in Winter Season -Focusing on Case Study of High-rise Apartment Housing-)

  • 한충희;방종대
    • 한국건설관리학회논문집
    • /
    • 제7권1호
    • /
    • pp.148-158
    • /
    • 2006
  • 공공발주기관의 동절기 공사불능기간의 운영은 공사기간을 길게 하고, 건설사업비를 증가시킨다 또한, 건설인력의 활용을 어렵게 하여 근로소득을 감소시킴으로써 국가 경제에도 나쁜 영향을 미친다. 그러므로 동절기에도 골조공사는 시행되어야 할 것이다. 그러나 동절기에 골조공사만 시행하고 마감공사를 시행하지 않을 경우, 골조공사의 빠른 진척이 마감공사의 주공정선에 영향을 미치게 됨으로 이에 대한 규명이 필요하다. 본 연구에서는 동절기 골조공사 시행이 마감공사의 주공정선의 작업기간에 미치는 영향을 규명하였다. 이를 위해 가상현장을 설정한 후, 이 현장을 대상으로 마감공사의 공정표와 주공정선, 전체 공정표 및 주공정선을 작성하고, 공정시뮬레이션을 실시하였다. 본 연구결과는 동절기 골조공사 시행 시 아파트 공사의 공기산정에 유용하게 활용될 수 있을 것이다.

고속 가공을 이용한 금형의 효율적 생산 제 2 부: 사상 공정 및 가공 조건의 선정 (High Speed Machining Considering Efficient Manual Finishing Part II: Optimal Manual Finishing Process and Machining Condition)

  • 김민태;제성욱;이해성;주종남
    • 한국정밀공학회지
    • /
    • 제23권12호
    • /
    • pp.38-45
    • /
    • 2006
  • In this work, optimal finish machining condition considering total time for mold or electrode manufacturing was investigated. First, manual finishing time according to the machining condition was analyzed for the work material. The effect of runout and phase shift of tool path on surface finish was also considered in those analyses. Secondly, optimal manual finishing processes were determined for various machining conditions. Finally, finish machining time and corresponding manual finishing time were taken into account for the estimation of the total time of manufacturing mold. Though small feed per tooth and pick feed reduced the manual finishing time, the finish machining time increased in such conditions. With a machining condition of feed per tooth of 0.2 mm and pick feed of 0.3 mm, the minimum total time of manufacturing mold was achieved in our machining condition.

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF

조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안 (Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF