• Title/Summary/Keyword: Field-BIM(Building Information Modeling)

Search Result 122, Processing Time 0.024 seconds

Application of BIM on Drawing Verification of Firefighting

  • Chang, Ya-Chun;Shr, Jin-Fang;Huang, Xuan-Chao
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.2
    • /
    • pp.15-18
    • /
    • 2015
  • In general, most of the function and using of building is for single purpose. However, current buildings combine several functions that causes a lot of problems not on firefighting only but also on environment engineering. Because of hard integration on different fields that causes a lot of conflict. That wastes cost and time. That also threaten the safety of firefighting. This search focuses on the drawing verification and field inspection on firefighting. These two items both remain paper work. To complete the current work, it needs to bring a great amount of drawing papers in the field. By BIM, integrated data can be extracted. It makes the drawing verification and field inspection easier and increases the efficiency. That is the main point of this research.

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

A Basic Study on the BIM-based AR(Augmented Reality) System for Safety Management (안전관리를 위한 BIM적용 증강현실 시스템 적용 방안에 관한 기초연구)

  • Lee, Jong-Hoon;Choi, Ju-Won;Seo, Hee-Chang;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.147-148
    • /
    • 2012
  • According to the analysis report of construction fall accident, situation not installed safety facilities caused the largest of disaster in temporary structure. Therefore, actionable measures will be needed identifying the installation of safety facilities immediately. In this study proposed plan by the safety facilities to effectively visualize, supervision can be easily for reduce fall accident. This system can be used BIM and augmented reality technology by combining in the field in real-time. Through this study, safety facilities management is improved and expected to prevent a accident.

  • PDF

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

Bim-based Life Cycle Assessment of Embodied Energy and Environmental Impacts of High-rise Buildings: A Literature Review

  • Lijian Ma
    • International Journal of High-Rise Buildings
    • /
    • v.12 no.2
    • /
    • pp.163-168
    • /
    • 2023
  • Today 55 percent of the population in the world lives in urban areas which is expected to increase to 68 percent by the year 2050. In the cities, high-rise buildings as symbols of the modern cityscape are dominating the skylines, but the data to demonstrate their embodied energy and environmental impacts are scarce, compared to low- or mid-rise buildings. Reducing the embodied energy and environmental impacts of buildings is critical as about 42 percent of primary energy use and 39 percent of the global greenhouse gas (GHG) emissions come from the building sector. However, it is an overlooked area in embodied energy and environmental impacts of high-rise buildings. Life cycle assessment (LCA) is a widely used tool to quantify the embodied energy and environmental impacts of the building sector. LCA combined with Building Information Modeling (BIM) can simplify data acquisition of the building as well as provide both tools with feedback. Several studies recognize that the integration of BIM and LCA can simplify data acquisition of the building as well as provide tools with feedback. This article provides an overview of literature on BIM-based of embodied energy and environmental impacts of high-rise buildings. It also compares with different LCA methodologies. Finally, major strategies to reduce embodied energy and environmental impacts of high-rise buildings, research limitations and trends in the field are covered.

Definition of requirements for creating BIM models for the development of SCAN to BIM guidelines (SCAN to BIM 지침 개발을 위한 BIM 기반 조달프로세스와 모델의 요구사항)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • In the domestic construction field, BIM and 3D scanning technology are combined to perform reverse engineering. It is necessary to develop guidelines or processes for domestic situations through 3D scenario investigation and reverse engineering projects using BIM. Using the case of actual construction service that performed reverse engineering, we analyze the areas that need to be reinforced compared to the existing advanced cases when creating guidelines. It is recommended to encourage the convergence between 3D scanning and BIM, and to define the requirements and levels of the BIM model in the procedure.

A Method of Tunnel Information Modeling Reflecting Curved Alignment and Model-based Information Management using IFC Data Schema (곡선 선형을 반영한 터널 정보모델링 및 IFC 데이터 스키마를 활용한 모델기반의 정보관리 방안)

  • Jang, Seong Geun;Kwon, Tae Ho;Park, Sang I.;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.549-557
    • /
    • 2017
  • In order to improve the productivity in the civil engineering field, efforts to apply BIM have been continuing, however, research on information modeling of tunnel structures considering alignment is insufficient. In this study, we proposed the method of building tunnel models reflecting curved alignment by transferring point data to BIM Authoring Tools(BAT) through discretization of alignment in Alignment-centered Modeling Tools(AMT). IFC data schema was derived to consider the physical and spatial elements of tunnel structures and alignment and IFC-based information management for tunnel alignment, tunnel structures and ground conditions was possible by referring to the extended data schema and including meanings in IFC property sets. The ratings for ground condition in Rock Mass Rating(RMR) and Q-system was automatically derived by using generated information model according to the proposed method.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

Space Management on Campus of a Mobile BIM-based Augmented Reality System

  • Ji, Seung-Yeul;Kim, Mi-Kyoung;Jun, Han-Jong
    • Architectural research
    • /
    • v.19 no.1
    • /
    • pp.1-6
    • /
    • 2017
  • Over the past decade, building information modeling (BIM) has gained a foothold in the construction sector. However, as digital data generated in the virtual space of a computer environment, BIM-based data have an inherent limitation in their application efficacy under field conditions. To overcome this, the present study employs augmented reality (AR) to reduce the discrepancy between the digital data generated in virtual spaces and real-world conditions. We assessed the potential applicability of an AR-based interface by analyzing existing examples of Apple, Google, and Facebook, which reflect the recent developments of technologies focusing on user experience. We then proceeded with an AR study, restricting the scope of application to a mobile environment in which an efficient information transmission between a digital model and real life can take place. Object-oriented software engineering was employed to ensure an efficient implementation of a BIM-based AR system for campus space management (CSM) in a mobile environment. Finally, we conducted a module test to check the reliability of the CSM method by using an AR-based mobile system with a prototype of the model used in university campuses, and extracted and itemized the supplementary requirements for CSM by using BIM tools for running AR applications.