BIM-Based Simulator for Rebar Placement  

Park, U-Yeol (Department of Architecture Engineering, Andong National University)
Publication Information
Journal of the Korea Institute of Building Construction / v.12, no.1, 2012 , pp. 98-107 More about this Journal
Abstract
Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.
Keywords
reinforcement bar; BIM(Building Information Modeling); clash detection; four-dimensional; simulation;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Park UY, Jeong HO, Kang YH, Kang TK, Cho HH. [The Theory and Practice of Rebar Placement]. Seoul (Korea): Daega; 2011. p. 122-55. Korean.
2 Jung HO, Cho HH, Park UY. A Study on the Improvement of Erection Bar Detailing in Domestic Building Construction. Journal of The Korea Institute of Building Construction. 2009 March;9(2):39-46.   DOI   ScienceOn
3 Kim SK, Kim CK. Integrated Automation of Structural Design and Rebar Work in RC Structures. Journal of the Architectural Institute of Korea. 1994 Jan;10(1):113‐22.
4 Lee KH, Park JH, Bang KS, Yun SH, Paek JH. A Study on Developing a BIM‐based Construction Simulation Application. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2009 May;25(5):205-12.
5 Ahn HK, Seo HC, Kim JH, Kim JJ. The Problem of the Clash detection through BIM model and Improvement. Korea Institute of Construction and Management 2010 Conference; 2010 Oct 23-24; Cheongju-Si, Korea. Seoul (Korea); Korea Institute of Construction and Management; 2010. p. 401-2.
6 Cho HH, Kwan OS, Seo JW, Kim JY, Kang KI. Development of Interference Management System Based on 4D‐CAD in Substructure Work. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2001 Sep;17(9):225-32.
7 Lee JC. Definition and Implementation of Object Libraries for 4D Simulation. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2002 March;18 (3):149-56.
8 Lee JC. Developing and Automated Module for Sche‐ duling and Quantity Estimation Based on 3D CAD Model Information towards Effective Use of 4D CAD Model. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2004 Feb;20(2):15-22.
9 Kang LS, Moon HS, Park SY. Application Meth-odology and Process Model of 4D CAD System through Project Life Cycle. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2008 July;24(7):127-34.
10 Kang LS. Improvement of Construction Scheduling and Process Control Functions in 4D CAD System. Journal of the Architectural Institute of Korea (Structure & Construction Section). 2006 August;22(8):141-8.
11 Concrete Reinforcing Steel Institute(CRSI). Placing Reinforcing Bars 8th Ed. USA: CRSI; 2005. p. 12-20.
12 Salim MD, Bernold LE. Design-Integrated Process Planner for Rebar Placement. Journal of Computing in Civil Engineering. 1995 April;9(2):157‐67.   DOI   ScienceOn
13 Park UY, Kim GH, Kang KI. A Study on the Actual Condition Analysis and Improvement or Rebar Work in Korean Building Construction. Journal of The Korea Institute of Building Construction. 2004 Sep;4(3):83‐91.   DOI   ScienceOn
14 Lee TO. A Study on the Actual Condition Survey of Apartment Rebar Work. Journal of The Korea Institute of Building Construction. 2008 April;8(2):71‐79.   DOI
15 Cho HH, Park UY, Kang TK, Park HY, Yun, SH, Huh YK. Analysis of Re‐bar Manufacturing System in Plant and its Facilitate Method. Korean Journal of Construction Engineering and Management. 2007 Sep;8(1):57‐65.
16 Park HY, Lee SH, Kang TK, Lee YS. Developing an Automatic System for Quantity Taking‐off Cut and Bent Rebar and Making a Placing Drawing. Proceeding of Conference in Architectural Institute of Korea; 2007 Sep 26‐27; Cheongju‐Si, Korea. Seoul (Korea): Architectural Institute of Korea; 2007. p. 358-63.
17 Kim GH, Park WY, Kang YI. Develpment of a Improvement System for Quality & Cost Management of Rebar Work in Korean Building Construction. Journal of the Architectural Institute of Korea Structure & Construction Section. 2002 May;18(5):121‐129.
18 Ham CS, Park JP, Park JK, Chung JY, Kim IH. A Study on the Development of Shop Drawings and Bar‐bending Schedule Automation System for Apartment Housing. Journal of the Architectural Institute of Korea. 1999 August;15(8):111‐19.