• Title/Summary/Keyword: Field construction

Search Result 5,507, Processing Time 0.036 seconds

Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project (UAV를 활용한 토목공사 현장 모니터링 시스템 개발에 관한 연구)

  • Jeong, Juseok;Han, Seonju;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.41-49
    • /
    • 2017
  • The ordering organizations of civil engineering project manage the construction site indirectly because the construction site is mostly located at a remote location and the public official also manages many sites. Since the civil engineering project has a wide working area, it is not easy to know the status of the whole project quickly by the indirect management method by report of the field practitioner. In order to solve these problems, the field management system between the ordering organization and the field office is changing from offline to online. This study suggests an advanced construction site management system that obtains site-related 3D information with the use of UAV and shares the information between the construction site in remote locations and their supervising authorities. To develop an UAV application system, the problems of field management in many actual sites were analyzed and derived necessary functions such as status reporting and online information management. The developed system was applied to actual field to verify its usability and compared the efficiency improvement with existing field management method.

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.6
    • /
    • pp.470-476
    • /
    • 2011
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1112-1118
    • /
    • 2009
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

  • PDF

Study on Development of Management Tools for Technological Document in the Field of Construction (건설 기술문서 관리 도구 개발에 관한 연구)

  • Lee, Tai-Sik;Lee, Dong-Wook;Jun, Young-Joon
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.354-358
    • /
    • 2006
  • In addition to documents or technologies at working place, the importance of technology management riese through increasing know-hows. In particular, in the field of construction, a variety of management systems including ERP and PMIS have been introduced since 90's. Therefore, the range of shared information extends to construction grounds, headquarters or even to collaborating companies. It means that the competitiveness of companies depends on the efficient management of technological documents in the field of construction. Accordingly, this study shows the purpose to develop the construction system which save, search and share technological information in order to improve any problem of current construction systems. The construction system offers you both the searching function and the viewing function for various information. In addition, the system contains the highlighting function to know if any information is available. The Construction system is possible to be used with current systems at the same time because is is designed to make up for them. In addition, it is expected to solve their problems and supplement their defects.

  • PDF

An Experimental Study on the Characteristics of Attenuation and Propagation of Pilings Noise by SIP Method in Construction Field (SIP공법에 의한 항타소음의 전달 및 감쇠특성에 관한 실험적 연구)

  • 이병윤;김병주;박재영;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.227-236
    • /
    • 1997
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and has become a very serious issue in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult because the poorness of basic data and insufficiency of the existing research. Especially, in order to establishment of sound insulation plan about pilings work noise that has highly sound pressure level and impactive, a real situation of sound characteristics about pilings work noise in foundation work demands close investigation. In this point, this study attempts to surveys the characteristics of attenuation and propagation of construction equipment noise in pilings work using SIP(soilcement injected precast pile) method. And this study intends to get the basic data for establishment of a standard about construction noise.

  • PDF

A Study on the Characteristics of Construction Noise by Sand Drain Method (Sand Drain 공법에 의한 작업시 발생하는 건설소음의 특성에 관한 연구)

  • Yun, Hae-Dong;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.500-505
    • /
    • 2000
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Neverthless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics of attenuation and propagation of Sand Drain Method in construction field. On the basis of measurement value, we analysed about prediction possibility of Sand Drain Method. This study also present a basic data found a effective plans for Sand Drain Method.

  • PDF

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

ON THE C1-CONSTRUCTION

  • Song, Youngkwon
    • Korean Journal of Mathematics
    • /
    • v.8 no.2
    • /
    • pp.193-198
    • /
    • 2000
  • In [4], it is proved that the algebra ($S,k^{14}$) is not a $C_1$- construction if the field is the real number field. In this paper, we will introduce a different proof of the fact that the algebra ($S,k^{14}$) is not a $C_1$-construction.

  • PDF

Design of Field Development Ship for Ultra-Deepwater (초심해 용 유전개발선의 설계)

  • Park, H.S.;S.W. Yoon;I.M. Song
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.87-92
    • /
    • 2001
  • This technical note is intended to introduce a state-of-the-art offshore construction vessel. This unique vessel is for multi-purpose Field Development Ship (FDS) for deepwater to ultra-deepwater. The FDS is a construction vessel with dynamic positioning (DP) system intended to develop offshore oil and gas field in water depth up to 3000 m. The design criteria and main capacities of the vessel are discussed.

  • PDF

Field Evaluation of Scour Countermeasure Using Geobag (지오백 세굴보호공법의 현장 적용성 평가)

  • Park, Jae-Hyun;Kwak, Ki-Seok;Lee, Ju-Hyung;Chung, Moon-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1251-1258
    • /
    • 2006
  • Field evaluation of new scour countermeasure using geobag and aggregate is performed to prepare for the basis of design and construction standard in Korea. Polyester non-woven geotextile is determined as a geobag material and tire cord is used to sew up the geobag which contain aggregate. Hwasang-gyo(bridge) is selected as a pilot test site through office review and field investigation. According to the design flood of Hwasang-gyo(bridge), the size and volume of geobag are calculated and construction area and required number of geobags are computed by considering the specification of the pier and foundation of the bridge. After construction, scour depth around geobag construction area is measured and the stability of geobag is ascertained by using pole and digital camera.

  • PDF