• Title/Summary/Keyword: Field Schedule Management

Search Result 109, Processing Time 0.025 seconds

Preparation and Application of Cultivation Management Map Using Drone - Focused on Spring Chinese Cabbage - (드론 기반의 재배관리 지도 제작 및 활용방안 - 봄배추를 대상으로 -)

  • Na, Sang-il;Lee, Yun-ho;Ryu, Jae-Hyun;Lee, Dong-ho;Shin, Hyoung-sub;Kim, Seo-jun;Cho, Jaeil;Park, Jong-hwa;Ahn, Ho-yong;So, Kyu-ho;Lee, Kyung-do
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.3
    • /
    • pp.637-648
    • /
    • 2021
  • In order to support the establishment of a farming plan, it is important to preemptively evaluate crop changes and to provide precise information. Therefore, it is necessary to provide customized information suitable for decision-making by farming stage through scientific and continuous monitoring using drones. This study was carried out to support the establishment of the farming plan for ground vegetable. The cultivation management map of each information was obtained from preliminary study. Three cultivation management maps include 'field emergence map', 'stress map' and 'productivity map' reflected spatial variation in the plantation by providing information in units of plants based on 3-dimensions. Application fields of the cultivation management map can be summarized as follows: detect miss-planted, replanting decision, fertilization, weeding, pest control, irrigation schedule, market quality evaluation, harvest schedule, etc.

Development and Implementation of Chain Metrics for Obtaining Lean Overall Equipment Effectiveness Using Availability Measures (시간가동률 척도에 의한 Lean OEE의 연계지표 개발 및 적용)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.147-158
    • /
    • 2012
  • This paper aims to develop a new chain metrics for obtaining lean Overall Equipment Effectiveness(OEE) and present implementation strategy which considers the properties for Total Productive Maintenance(TPM) to reduce machine losses, Performance Analysis and Control(PAC) to reduce labor losses, Lean Production System(LPS) to reduce floor wastes, and Theory of Constraints(TOC) to minimize the problem of Capacity Constrained Resource(CCR). The study reviews the related literatures and reformulates the structure of machine losses, labor losses and field wastes. The research also develops the integrated productivity metrics according to time, units, reliability and maintainability. It is found that the study develops the actual productivity measure in terms of efficiency, effectiveness and standard productivity. In addition to that, it outlines and develops by using the integrated LPS and TPM, lean OEE measures such as Time Based Productivity(TBP), Unit Based Productivity(UBP), and Reliability & Maintainability Based Availability(RMBA). Implication examples are proposed to make it easier and available for practioners to understand the implementation strategies about TPM OEE, lean OEE and TOC OEE. Futhermore related to other studies, the research contributes to create a new chain productivity measures to clear the interrelationship concepts of productivity, efficiency and effectiveness. Moreover the paper develops the enhanced OEE measures by integration of TPM, PAC, LPS and TOC with the perspective of schedule, throughput, reliability, maintainability and availability.

Fashion technical design education models applying the constructivism learning theory (구성주의 학습이론을 적용한 패션 테크니컬 디자인 교육 모형)

  • Im, Min-Jung
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.21 no.1
    • /
    • pp.115-129
    • /
    • 2019
  • This study aimed to develop methods for technical design education that can be intimately connected to the industrial field. For this, technical design jobs performed in the fields of the domestic and foreign fashion industries and their required competences were examined, and educational methods based on constructivism were proposed. Korean fashion technical designers' works were identified, and then the fashion technical designer's responsibilities and qualifications were collected and analyzed from global employment sites. On the basis of the collection and analysis, hands-on staff members and education experts were interviewed about required competences for the actual business and possible suitable methods for education. The results of research showed that in the case of the US, job systems and relevant duties for technical designers were clearly defined by clothing brands, whereas in Korea, businesses were systematized around vendors, not brands, and as a result the businesses of technical package composition and specification proposals were not performed properly. This study organized the contents of technical design education into fit development and specification, the composition of technical design packages, the evaluation and approval of samples, fit schedule management and fitting, block pattern setting and pattern correction, sewing specifications appropriate for styles and materials, grading, technical terms, and production management. As for the technical design education models, the cognitive apprenticeship model, resource-based learning, the problem-based and anchored model, and the problem-based and resource-based models were proposed.

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

Collection and Utilization of the Construction Labor Information Using PDA and Barcode (PDA 및 바코드 기술을 이용한 건설 노무정보의 수집 및 활용)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.65-75
    • /
    • 2004
  • Labor management has been considered as an important task in construction industry. However, labor management has not yet been systematically performed because of the wide variety of factors of construction industry such as the field work, the complexity of the work process, the daily employment. Most of the present labor managements are performed to collect the information of the number of labors input during the work period, and to calculate labor cost. The information of activities performed by labors can be effectively used to analyze project status related to schedule, cost and productivity, but the present labor management systems are not based on the activities. The main objective of this research is to develop a labor information management system using IT tools in order to measure the number of labors input on the activities, and to convert the labor information into productivity data. It is anticipated that the effective use of the developed system would be able to effectively assist the scheduling and cost management of a project.

A Study on S/W Development Process Improvement based on CMMI's Quantitative Project Management (CMMI의 정량적 프로젝트 관리에 기반한 S/W 개발 프로세스 개선에 관한 연구)

  • Lee, Don-Hee;Oh, Jae-Kon;Kim, Jeong-Joon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.18 no.3
    • /
    • pp.101-110
    • /
    • 2018
  • In order to The certification of CMMI level is positioned as the most important part of software development company competitiveness. From that point, you will be able to find the various CMMI based process improvement activities of the companies in the above. This paper presents the activity method, such as organization, process application method for the CMMI based process improvement, through the field application. Based on that, this paper enables you to understand the model application method. And we also carry out the application case analysis of defect management with the schedule/effort analysis and colleague's check activity to show the improvement effectiveness, based on the quantitative analysis. And we present the problem and improvement part of real application. The result of this paper will be used to understand the effectiveness of quantitative process management, mentioned in the CMM. And furthermore, we also expect this paper to be useful for the organization to improve the process based on CMM in the future.

SaaS-based construction process transfer and Safety Management System (SaaS기반의 건설공정전송 및 안전관리 시스템)

  • Kim, Eui-ryong;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.735-737
    • /
    • 2015
  • In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.

  • PDF

A Study on the Effective Decision-Making Support Model for Construction Duration by the Hypothetical Weather Simulation (가상기후 시뮬레이션에 의한 공기산정 의사결정 지원모델에 관한 연구)

  • Jeong Suk-Nam;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.74-81
    • /
    • 2000
  • The duration of construction in the construction works contains non-working days as well as working days. The duration is so relevant to climate that it should be calculated after fully considered about the regional climate in which construction processes. In most construction fields, however, there has been a frequent adjustment of duration because the field supervisor's experiences have decided non-working days indiscriminately without any accurate information about weather. Not only has that done great economic damages, but also caused many problems in interests among construction subject. So, in this study, we will analyse the elements of climate which has influences on the duration and implement the hypothetical weather simulation. By connecting the results of simulation with the duration of construction, we will propose the decision-making support model for the efficient calculation of duration when the field supervisor makes the projects schedule.

  • PDF

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.