• Title/Summary/Keyword: FEASIBILITY STUDY

Search Result 6,742, Processing Time 0.045 seconds

Policy assessment of Agricultural Infrastructure Improvement Project for Preliminary Feasibility Study - Multipurpose Rural Water Development Project in Pangyo District - (농업생산기반정비사업의 예비타당성조사 정책효과 분석 - 판교지구 다목적 농촌용수개발사업을 중심으로 -)

  • Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seunghwan;Kim, Yoonhyung;Yoon, Sungeun;Kim, Jeonghoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.1
    • /
    • pp.21-28
    • /
    • 2021
  • Since 2001, the Pangyo district multipurpose rural water development project has been promoted as a new target project for stable supply of agricultural water and improvement of the living environment of rural areas in Seocheon-gun. Detailed data analysis and logic must be reinforced, focusing on the items reorganized by the reorganization of the preliminary feasibility study. The purpose of this study is to promote the smooth promotion of projects by conducting a policy effect assessment following the reorganization of the preliminary feasibility study system. This study conducted a policy assessment of agricultural infrastructure improvement project for preliminary feasibility study. The policy assessment is divided into three parts: project implementation conditions, policy effects and special assessments. The newly established policy effect is to assess the job effects, living conditions impact, environmental evaluation, and safety evaluation that contribute to the quality of life. Sixteen policy assessment items were selected and evaluated quantitatively and qualitatively. The results of the study are expected to provide basic data for the comprehensive judgment of the preliminary feasibility study of agricultural infrastructure improvement project in the future.

Study on Assessment Indicators for the Development of Agricultural Technology Development (신기술개발을 위한 사전평가지표 개발)

  • Ku, Kyo Young;Kwak, Cheul Soon;Hwang, Dae Yong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.19 no.4
    • /
    • pp.1095-1136
    • /
    • 2012
  • The study demonstrated the pre-feasibility evaluation of the new agricultual technology R&D project and the ways to improve it. The study created new criteria for pre-feasibility evaluation based on the results acquired from the examination and analysis of pre-feasibility evaluation systems and criteria of various institutions at home and abroad in order to understand the current state of the evaluation method conducted by the Rural Development Administration and to seek ways for its improvement. The new criteria include indices for technicity, marketability, and feasibility. Based on these, questionnaires were prepared and the answers on them were statistically analyzed to set weights between indices. It was found that feasibility appeared the highest, in particular, feasibilities related to budget appropriateness, novelty, possibility of demand for the technology, and potential of commercialization appeared high. Referring to this conclusion, a simple operation process of pre-feasibility evaluation was introduced in the study.

An Empirical Study on the Relationship between Market Feasibility Levels and Technology Variables from Technology Competitiveness Assessment (기술력평가에서 사업성수준과 기술성변수간 연관성에 관한 실증연구)

  • Sung Oong-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.198-215
    • /
    • 2004
  • Technology competitiveness evaluates environmental and engineered technology and process at both the scientific and market levels. There are increasing concerns to measure the effects of the technology variables on the potential market feasibility levels. However, there are very little empirical analysis studies on that issue. This study investigates the impacts of technology variables on the levels of market feasibility based on 230 data obtained from Korea Technology Transfer Center. As various statistical analysis, the canonical discriminant model, logit discriminant model and classification model were used and their results were compared. This study results showed that major technology variables had very significant relations to discriminate high and low categories of market feasibility. Finally, this study will help building management strategies to level up the potential market performance and also help financial Institutions to decide funds needed for small-sized technology firms.

Application of 3-Dimensional Modeling in Mine Feasibility Study and Production (광산개발 타당성 평가 및 생산에 있어서 3차원 모델링 적용 사례)

  • Choi, Yong-Kun;Heo, Seung;Park, Joon-Young;Kim, Jang-Ha;Lee, Sung-Am
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.89-100
    • /
    • 2009
  • 3-dimensional modeling methods have been used in the every step of resource development; Exploration, reserve estimation, mine feasibility study, mine design and mine production. This report shows seven cases for which 3-dimensional modeling is used in resource development. Six projects deal with resource esimation, mine feasibility study and production. And another deals with mine rehabilitation. These cases show that 3-dimensional modeling method is beneficial to understand the real state of ore deposit and complex underground structures. Moreover, 3-dimensional modeling is the most efficient method for mine planning and management in the every step of resource development.

  • PDF

Policy Directions to Enhance Economic Feasibility of Agrivoltaics in Korea (영농형 태양광 경제성 제고를 위한 정책 방안)

  • Jong-Ik Kim;Sangmin Cho
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.15-25
    • /
    • 2024
  • This study analyzes the economic feasibility of agrivoltaics in South Korea. The key findings are as follows. It was ascertained that an amendment to the Farmland Act, which currently has an 8-year permit period, is necessary to ensure the economic feasibility of agrivoltaic projects. Furthermore, economic feasibility improves when agrivoltaic projects are financed, as against cases without financing. Furthermore, the availability of low-interest loans through financial support programs significantly enhances economic feasibility. Scaling up projects leads to cost savings due to economies of scale, while community-based agrivoltaic initiatives generate higher revenue through the acquisition of additional Renewable Energy Certificates. These factors can help improve the economic feasibility of agrivoltaic projects. These incentives are emphasized as they can serve as a source of funding to foster community acceptance of agrivoltaic projects.

A Study Factor of the Feasibility Analysis in Urban Redevelopment Project (도심재개발사업의 타당성 분석 요인에 관한 연구)

  • Joo Jae-Young;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.347-352
    • /
    • 2001
  • Midtown redevelopment project is intended for restoration of city's declining function and promoting the utilization of land, but several factors such as participants of different nature in the project, different expectation level from them, high land value accompanied by geographical location as a city and the demand for high density development, nature of business that requires long duration to complete and vast amount of fund contribute to complication of feasibility study. Due to these characteristics of midtown redevelopment project, consideration of various factors involved with it and reliable analysis are required but suggested complication of feasibility study is causing halt in project, preventing from launching it and delaying it. So, this study was undertaken to be a help to feasibility study of midtown redevelopment project by suggesting main elements that need to be dealt with analysing questionnaire survey result attained from related expert in this area and arranging total 45 factors essential to feasibility study for midtown redevelopment project that can be classified into 5 main category such as economic/financial factors, legal/institutional factors, market related factors, technical factors and conflict related factors through documental investigation, case study and interview with specialist concerned.

  • PDF

How to Improve R&D Pre-Feasibility Study System (연구개발 분야 예비타당성 제도의 개선방향)

  • Choi, Seok-Joon;Kahn, Hyung-Sik
    • Journal of Korea Technology Innovation Society
    • /
    • v.11 no.2
    • /
    • pp.287-313
    • /
    • 2008
  • Even though the pre-feasibility study was introduced in 1998, it mainly has focused on transportation social overhead capital(SOC) such as road and railroad. Last year, however, the government newly launched R&D project area for the pre-feasibility study. This paper tries to analyze the pre-feasibility study methodology and system that applied to R&D facility, cluster, and sized R&D infrastructure projects. In depth study of economic, policy, and AHP analysis, this paper shows that the preliminary feasibility study have some caveats and suggests a way of improvement for making up for limitation. Main suggestions are as follows; First, to improve the fit in R&D sector analysis, using consistent method is important. Second, technology analysis is essential for R&D evaluation. Third, technology experts should take part in AHP analysis.

  • PDF

A Study on Business Feasibility for Marine Leisure Ships (해양레저선박에 대한 사업 타당성 분석 연구)

  • Jung-Suk Choi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.11a
    • /
    • pp.300-301
    • /
    • 2022
  • In order to improve the accessibility to the island through marine leisure ships, it is necessary to evaluate objective business feasibility of the ship's operation. In this study, costs and income were estimated based on the operating expenses and freight standards of similar marine leisure ships in operation, and based on this, the feasibility of the project was empirically analyzed through B/C analysis, NPV, and IRR. In addition, sensitivity analysis was performed for various variables to understand the requirements for securing minimum economic feasibility. As a result of the study, in case of new building ship, the B/C ratio was estimated to be 1.042, NPV was estimated to be KRW 1.93 billion, and IRR was estimated to be 2.1% which means that profitability was secured.

  • PDF

Efficiency Plan of Transportation Investment Appraisal System (국내 교통SOC 투자평가체계 효율화 방안)

  • Chung, Sung Bong;Namkung, Baek Kyu
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.4
    • /
    • pp.336-346
    • /
    • 2014
  • Recently interest and concern about the effectiveness of the transportation investment policy have been increasing because lots of transportation projects reflected to the National Transportation Plan are suspended or delayed during pre-feasibility study. For instance, the criticism such as overlap and deficiency in consistency in appraisal system were aroused because of the waste of budget, time and man-power etc. This is because the Korea government adopted pre-feasibility study for the purpose of efficient use of national budget, but the methodology and the appraisal contents are similar to the existing feasibility study. Also, the feasibility appraisal study was adopted in 1999 for the purpose of establishing efficient transport networks but the feasibility study has been substituting the function which should be conducted by feasibility-appraisal study. In this study, by reviewing the current situation and the purport of introducing these policies, the understanding of these policies could be increased. Then, the plans for improving the efficiency of transportation appraisal system are suggested in the context of strengthening the connectivity between these policies. This study is expected to play an important role in increasing the rationality, consistency and efficiency of transportation investment policies.

A Study of the Situation in the Feasibility Analysis for Public Rental Housing (공공임대주택 개발사업의 사업성분석 현황 연구)

  • Lee Sang-Gon;Lee Jae-Young;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.222-225
    • /
    • 2003
  • The development project of a public rental housing require the accurate and systemical feasibility analysis for the successful performance owing to the long project duration. But, the item and procedure of the existing feasibility analysis are not standardized and the correlation among each of items is not clear. Therefore, analysis has much difficulty. The purpose of this study is to present the basic data for the modeling of the feasibility analysis system, through the domestic public enterprise-oriented survey and interview and collection of the report about the feasibility analysis.

  • PDF