• Title/Summary/Keyword: Existing tunnel

Search Result 638, Processing Time 0.024 seconds

An Experimental Study on Flexural Behavior in Framed Structure of P.S.T Method (P.S.T 공법 라멘 구조물의 휨 거동 특성에 관한 실험적 연구)

  • Cui, Jie;Yoon, Jong Nam;Eum, Ki Young;Hong, Sung Nam;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.144-152
    • /
    • 2011
  • The existing underground trenchless methods use reinforcing rod in steel tube to obtain structural stiffness. However, there are some problems such as inconvenience of work and expensive material fee which are resulted from limited working space and reinforcing work. To resolve these problems, a new trenchless method, namely P.S.T method (Prestressed Segment Tunnel Method), is developed which uses joint to connect the steel segment and form erection structure in underground construction. Further, installing strands for prestressing. In order to evaluate the flexural capacity of the P.S.T method structure, experiment was conducted. The parameters considered in the experiment are the span-to-depth ratio, diameter of steel tube at corner, prestressing force and welding of joint. Altogether examining the flexural behavior, the effect of deflection in structure according to different parameters has also been analysised.

Analysis for Mechanical Behavior of GFRP Rock Bolt for Permanent Support of Tunnel (영구 터널지보재로서의 활용을 위한 GFRP 록볼트의 역학적 거동 분석)

  • Sim, Jong-Sung;Kang, Tae-Sung;Lee, Yong-Taek;Kim, Hyun-Joong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.124-131
    • /
    • 2010
  • Rock Bolt generally utilizes deformed reinforcing bar welded from structural steel of which strength is higher than required for making advantageous use of the support function of ground. In the condition with highly corrosive underground water, however, problem frequently occurs on tunnel and slope stabilization in terms of repair, rehabilitation and maintenance issues due to the destruction of Rock Bolt by corrosion of steel. A structural performance evaluation for GFRP Rock Bolt was conducted for the purpose of resolving the foregoing problem and at the same time developing a permanently-usable support material. This study intended to evaluate the safety factor of GFRP Rock Bolt by implementing the slope stability interpretation via structural analysis on the basis of its structural characteristics derived from both tensile force function test and shear force function test. It is judged based on the results that GFRP Rock Bolt would secure sufficient ground stability as an alternative material for existing Steel Rock Bolt.

Case Study of Immersed Tunnel Instrumentation Management Using Wireless System (지중무선 시스템을 이용한 침매터널 구간 계측관리 사례연구)

  • Han, Sang-Wook;Kim, Byung-Hee;Han, Byung-Won;Lee, Gye-Chun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.768-773
    • /
    • 2009
  • Measuring method being applied for off-shore works is performed by using data logger or manual measuring instrument with wiring the cable connected from the sensor up to the position where measuring is allowed.(upper part of embankment or marine structure) Measuring management by using existing measuring method may be acceptable on the condition that the ground deformation volume(vertical, horizontal) is generally minimal and the site condition is good. But loss of measuring instrument, sensor cable failure or cutting is taken place frequently due to significant change of ground behavior caused by an external force change(embankment, excavation) under very soft ground condition(N value below 0-4). In case of the marine works, in particular, loss rate of measuring instrument is highly represented due to the factors of working barge anchoring, constructional interference and natural disaster. In order to solve these problems, measuring management was performed with employing underground wireless system at the immersed tunnel site. Measuring data was obtained freely under the marine environment by using underground wireless communication and cable cutting potential by ground behavior could be reduced. Measuring cost savings and its installation convenience were maximized by way of off-shore tower installation or cabling and by minimizing constructional interference of off-shore working barge. This case of measuring management was accomplished successfully.

  • PDF

An Evaluation of Treatment Technologies for Anti-scale in Drainage Works Using Simulation Test of Road Tunnel (도로터널의 모사시험을 통한 배수공 스케일 억제 기술 평가)

  • Park, Eun-Hyung;Nam, Joong-Woo;Han, Yoon-Su;Kim, Hyun-Gi;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.7
    • /
    • pp.5-15
    • /
    • 2013
  • Clogging phenomenon is one of the important problems in deteriorated tunnels, and it caused inhibition of drainage system by long-term behavior. Clogging phenomenon is mainly composed of $CaCO_3$ in the form calcite. Calcite is generally created by the reaction of $Ca(OH)_2$ with $CO_2$ emitted from vehicles. The structure of deteriorated tunnels was simulated and the setting of outflow from drainage pipe was observed in this study. The test was experienced by changing the slope of drainage system because existing drainage system was pracitced almost below $5^{\circ}$. As a result, in case of drainage system's slope is $2^{\circ}$, Quantum Stick has an effect for prohibiting scale in drainage system, but magnetic treatment was not effective. As a result, in case of drainage system's slope is $5^{\circ}$, both technologies were effective for prohibiting scale in drainage system, but Quantum Stick was especially more effective than magnetic treatment.

Wind-induced responses and dynamic characteristics of a super-tall building under a typhoon event

  • Hua, X.G.;Xu, K.;Wang, Y.W.;Wen, Q.;Chen, Z.Q.
    • Smart Structures and Systems
    • /
    • v.25 no.1
    • /
    • pp.81-96
    • /
    • 2020
  • Wind measurements were made on the Canton Tower at a height of 461 m above ground during the Typhoon Vincente, the wind-induced accelerations and displacements of the tower were recorded as well. Comparisons of measured wind parameters at upper level of atmospheric boundary layer with those adopted in wind tunnel testing were presented. The measured turbulence intensity can be smaller than the design value, indicating that the wind tunnel testing may underestimate the crosswind structural responses for certain lock-in velocity range of vortex shedding. Analyses of peak factors and power spectral density for acceleration response shows that the crosswind responses are a combination of gust-induced buffeting and vortex-induced vibrations in the certain range of wind directions. The identified modal frequencies and mode shapes from acceleration data are found to be in good agreement with existing experimental results and the prediction from the finite element model. The damping ratios increase with amplitude of vibration or equivalently wind velocity which may be attributed to aerodynamic damping. In addition, the natural frequencies determined from the measured displacement are very close to those determined from the acceleration data for the first two modes. Finally, the relation between displacement responses and wind speed/direction was investigated.

Authenticated Route Optimization Protocol for Network Mobility Support (네트워크 이동성 지원을 위한 인증된 경로 최적화 프로토콜)

  • Koo, Jung-Doo;Lee, Gi-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.4
    • /
    • pp.781-787
    • /
    • 2007
  • Network Mobility (NEMO) basic support protocol doesn't execute the process of route optimization and has not presented the particular security mechanism in other blocks except hi-directional tunnel between Mobile Router (MR) and its Home Agent (HA). Therefore in this paper we process secure route optimization courses through authenticated binding update protocol between MR and its Correspondent Node (CN) and the protocol of the competency of mandate between MR and its Mobile Network Node (MNN); its block also uses an bi-directional tunnel as the block between MR and its HA. The address of each node are generated by the way of Cryptographically Generated Address (CGA) for proving the ownership of address. Finally we analyze the robustness of proposed protocol using security requirements of MIPv6 and existing attacks and the efficiency of this protocol using the connectivity recovery and end-to-end packet transmission delay time.

  • PDF

(A Multicast Tree Extension Scheme in Mobile IP) (Mobile IP에서 멀티캐스트 트리 확장 방법)

  • Kim, Byung-Soon;Han, Ki-Jun
    • Journal of KIISE:Information Networking
    • /
    • v.30 no.3
    • /
    • pp.307-315
    • /
    • 2003
  • This paper proposes a Multicast Tree Extension (MTE) scheme for multicast in IP-based wireless networks. If a group receiver Joins a multicast group in a visited foreign network, multicast service may be disrupted when the foreign network does not have a multicast router. To avoid disruption, our scheme creates a bi-directional tunnel between the previous foreign agent (FA) and new foreign agent, if a mobile node (MN) moves from a foreign network with multicast capability to another foreign network with non-multicast capability. The MN thus continues to receive the multicast packets through the tunnel from the previous FA. Our scheme can avoid a long latency due to a long tunneling for group membership as well as multicast service disruption, even if the MN enters foreign networks with non-multicast capability. Simulation results show that our scheme offers lower costs for multicast delivery, tunneling and handoff latency than the existing scheme.

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

The Enforcement Scheme of the Overspeeding vehicle by Travel Speed (구간과속단속시스템의 도입 방안 연구)

  • Han, Won-Seop;Kim, Man-Bae;Hyeon, Cheol-Seung;Yu, Seong-Jun
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.1
    • /
    • pp.21-32
    • /
    • 2005
  • At present automated speed enforcement system in Korea control overspeed vehicle only in the specific spot. Because the drivers generally recognize the previous stated fact, they reduce a speed only in the establishment location of systems and increase rapidly again as soon as it passes the location. we have known that the rate of traffic risk at the tunnel, bridge and curve road segment is higher than other road section. Therefore, it needs speed control in them. In such a case, it is necessary to establish the automated traffic enforcement system based on the travel time speed of an individual vehicle over a pre defined stretch of road. In this study, the application limit of existing spot overspeed enforcement system was studied through an analysis of traffic flow characteristics in the tunnel, bridge and curve section. Also we found out the optimal distance of segment and the most suitable location to an application of the overspeed vehicle by travel time speed through an analysis of the road structure, traffic condition and accident numbers in the road.

A Case Study of Panoramic Section Image Collection Method for Measuring Density - with matched images in the Seoul Beltway Sapaesan Tunnel - (밀도측정을 위한 구간영상 최적 수집주기 결정 연구(서울 외곽순환도로 사패산 터널구간을 대상으로))

  • Park, Bumjin;Roh, Chang-Gyun;Kim, Jisoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.13 no.4
    • /
    • pp.20-29
    • /
    • 2014
  • Density is applied both three major macroscopic traffic variables (traffic volume, speed, and density) and two measures of effectiveness (MOE) for level of service (LOS) on highway (density and V/C). Especially, it is known for the most accurate MOE on evaluating the LOS of highway. Despite such importance, there is a lack of study on density relatively than other variables for its difficulty of measurement. Existing density estimation methods have some limitations such as density values of same traffic flow vary with collecting time. In this study, we researched actual density measuring method with panoramic image, after each CCTV images in the Sapaesan Tunnel on Seoul Ring Expressway are matched into one panoramic image. Analysis through the Central Limit Theorem shows that density of 24 1 km-images, which means 24 second, applies traffic situation well. That is to say that reasonable density value regardless of collecting time, and practical density which represents actual traffic flow can be taken in case of measuring density by suggested collecting cycle.