A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

Development and Validation of a Behaviorally Anchored Rating Scale for Peer Evaluation in Group Projects (조별 과제 동료평가 행동기준평정척도 개발 및 타당화 연구)

  • Shin, Tae Seob
    • Journal of Engineering Education Research
    • /
    • v.21 no.5
    • /
    • pp.32-39
    • /
    • 2018
  • The purpose of this study was to develop and validate a behaviorally anchored rating scale for peer evaluation in group projects based on social interdependence theory. A mixed method involving a qualitative and quantitative approach was used in this study. In the qualitative study, both the individual and group interviews were conducted to college students regarding their cooperative learning experiences. Data from this qualitative research was analyzed based on 5 elements of cooperative learning and 'critical incidents' were extracted from students' own voices that would serve as specific rating criteria in the scale. Once the 'critical incidents' have been incorporated into the scale, validation from 3 independent experts was conducted. In the quantitative study, correlations with relevant variables were analyzed to examine the criteria-referenced validity. Findings suggest that the behaviorally anchored rating scale for peer evaluation in group projects can be used in various team-based learning contexts.

Comparative Analysis of the Achievements and Limitations of Projects that Support Local Businesses in an Area Undergoing Gentrification: A case study on Brixton

  • Park, Youngseo;Ham, Sungil
    • Architectural research
    • /
    • v.24 no.1
    • /
    • pp.13-20
    • /
    • 2022
  • This research has been conducted to find answers to the questions of how projects that support local businesses work in areas undergoing gentrification and what are the achievements and limitations of these projects, based on the case studies of Brixton Pound and Pop Brixton supporting local businesses in Brixton in the London borough of Lambeth. To this end, this study collected data through interviews with local businesses belonging to each project and analysed them based on prior research on the projects, evaluation reports, and articles in the media. It began by investigating the supporting mechanisms of projects that support local businesses in the area, and then analysed and evaluated the projects' contribution to local businesses and the impact on the local community according to these mechanisms. The two projects in the case study showed contrasts in their support mechanisms, governance, and the role of Lambeth Council, and the local businesses' evaluations of the projects' support differed depending not only on the support mechanism of each project but also on business type and perceptions of the impact of gentrification.

A Study of Factors Influencing the Costs of Funding as a Function of Research Area and Financial Institutions (연구 분야 및 지원기관에 따른 연구비 영향 요인에 관한 연구)

  • Cheon, Young-Don;Kim, Dong-Guen;Lee, Yoon Been;Hwang, Ji-Ho;Kim, Yong Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.1
    • /
    • pp.163-180
    • /
    • 2013
  • Purpose: In this paper, we analyzed the factors that affect research grants using linear regression analysis in order to increase the effectiveness of investments in national research projects. Methods: We collected 15,454 pieces of data on research projects that finished between 2008 and 2010. Data preprocessing and visualization were done to derive statistically significant results. We identified factors that affected funding by using linear regression, and estimated increasing or decreasing tendencies based on those factors. Results: We identified the relative importance of the factors in awarding research grants. Strategies were suggested for the reasonable estimation of R&D budgets for investment purposes. Conclusion: This study will assist the decision-making process of governments in estimating funds required for R&D projects.

A Study of the Economic Evaluation for the Agricultural Infrastructure Projects (농업기반정비사업 편익산정을 위한 지표 개선방안)

  • Kim, Young-Joo;Choi, Byeong-Han;Jo, Rae-Cheong;Choi, Young-Wan;Kim, Yun-Shik
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.139-150
    • /
    • 2014
  • The purposes of this research are to review the current economic measures to be used to assess the economic effects of agricultural infrastructure projects, to find some effects not included into the current measures, and to suggest new additional economic measures. So thus, economic assessment for agricultural infrastructure projects has been criticized to be overestimated. For example, some research reported that the projects enhanced rice productivity by 20% or 30%. We suggest four new measures to evaluate economic effects of agricultural infrastructure projects: (1) enhancement in productivity, (2) switchover from low-income crops to high-income crops, (3) rises in land price, and (4) lower fluctuation in production.

A Study on the Evaluation Indicators of the Environmental Technology : Public Funded R&D Projects of the $CO_2$Reduction and Sequestration Technology (지속가능한 발전을 고려한 환경기술의 평가지표 연구 - 이산화탄소 저감기술을 중심으로)

  • 최미희;안은영
    • Journal of Korea Technology Innovation Society
    • /
    • v.6 no.3
    • /
    • pp.345-357
    • /
    • 2003
  • As the sustaindble development becomes the main goal of the global world in the 21st century, it is important that technological innovations should be realized ecologically sound based on co-evolutionalry approach. From this perspective, the trans-disciplinary research method is gaining importance in the evaluation process of public funded R&D, especially in the environmental technology. In our evaluation research on the R&D projects of the $CO_2$reduction and sequestration technology in Korea, we attempt to apply a trans-disciplinary integrated method on the concept of the eco-innovation, the technology push and the market pull. Also, we try to develop the trans-disciplinary indicators of the environmental technology evaluation. This research confirms the necessity of trans-disciplinary research among the three academic perspectives, engineering, social sciences and public policy.

  • PDF

Performance Evaluation System Framework for Natural Disaster Research and Development Projects (자연재난분야 연구개발 사업의 특성을 고려한 성과지표 및 성과평가체계 개발)

  • Kim, Du-Yon;Kim, Sang-Bum;Kwak, Hyun-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.118-129
    • /
    • 2013
  • Due to the recent surge in natural disasters, with rising social concerns, investment on research & development (R&D) project in natural disaster mitigation area is continuously increasing. However, current R&D performance management system of natural disaster mitigation area does not properly reflect characteristics and social ripple effects of R&D projects. It is indicated that mainly due to the current performance index consists of easy-quantification factors and the performance evaluation system adopts simple aggregation method. Therefore, the purpose of this study is to develop new performance evaluation system considering characteristics and social ripple effects of natural disaster mitigation R&D projects. To this ends, this study derived 3-dimensional performance measurement index through literature review and natural disaster mitigation R&D projects analysis. Finally, based on the derived performance measurement index, this study suggested new and effective performance evaluation system for natural disaster mitigation R&D projects.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

Development of Ubiquitous Information Projects Evaluation Models and Indexes (유비쿼터스 정보화사업 평가모형 및 지표 개발에 관한 연구)

  • Kim, Ki-Ho;Kim, Jae-Jon;Lee, Sang-Joon
    • Journal of Digital Convergence
    • /
    • v.6 no.3
    • /
    • pp.1-12
    • /
    • 2008
  • This research aims at developing and distributing models and indexes that can evaluate ubiquitous information projects in order to enhance the objectivity and validity of their evaluation. The research adopts a BSC(Balanced Score Card) concept with four views, economic, policy, social, and technical views. The research induces a model of pre-evaluation and a model of post-evaluation according to each view. In order to secure the validity of the models, they are revised and complemented by obtaining advice through interviews with five experts in related fields, and the validity and application possibility of the indexes are verified by surveying ten people working in those fields. Finally, investigating their weights according to the importance of each view and index, they are evaluated using an AHP (Analytic Hierarchy Process) method.

  • PDF

A Study of Error Analysis for Post Evaluation System on the Construction Projects (건설공사 사후평가시스템 입력오류 분석에 관한 연구)

  • Kim, Kyong-Hoon;Lee, Du-Heon;Kim, Tae-Yeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.77-85
    • /
    • 2015
  • The data are often missed and many errors of the data are generated in the input process for the post evaluation system on the construction projects, and the reliability of the data falls down much. Accordingly, the detailed analysis about missing and error of data was conducted to ensure reliability of the analysis results about post evaluation on the construction projects. As results in this study, a lot of input data were missed at the initial construction phase, and the data errors were found in the inaccuracy of reference reports, the lack of understanding about input data, and the failure of KRW unit.