• Title/Summary/Keyword: Estuary Gate

Search Result 53, Processing Time 0.026 seconds

The variation of channel flow through opening the gate at Shimgok-Cheon by using SMS program (SMS를 이용한 인천 심곡천 하구 수문개방에 따른 하천흐름변화 분석)

  • Kim, Chanyeong;Jeong Gwansoo;Kim, Youngkyu
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.6
    • /
    • pp.385-392
    • /
    • 2024
  • By installing the gate at the estuary to prevent the inflow of seawater into the river, it was prevented the inflow of seawater into the river, but as a result, the velocity of the river was rapidly decreased, turning it into a river with almost stoped flow. Since a river must have flow to maintain its function, in this study, it examined improving the flow of the river through the operation of a gate in Simgok-cheon where is a river that has been closed by a hydrological system at the estuary and almost stoped flow. It was considered that if the gate are operated according to the tide level, it could be changed into a river through which water flows by raising it to 0.49 m/s, which is about 10 times faster than the current slow flow rate of 0.05 m/s while maintaining the highest or lowest target elevation.

A Study on the Development of a method for estimating the amount of gate opening discharge in estuary using the three-dimensional fixed measurement of flow data for Integrated Nakdong-river estuary management (낙동강하굿둑 통합관리를 위한 3차원 고정식 유량 측정 자료를 이용한 하굿둑 개도 방류량 산정 기법 개발)

  • Kang, Dukee;Seo, Yongjae;Lim, Kyoungmo;Park, Byeong Woo
    • Journal of Wetlands Research
    • /
    • v.24 no.1
    • /
    • pp.52-58
    • /
    • 2022
  • Recently, various efforts and research are being conducted to integrated management of the estuary in Nakdong River. As one of such studies, measurement of opening discharge amount for each floodgate using a three-dimensional fixed ultrasonic flow meter is being conducted, but studies on hydraulic and statistical processing procedures and techniques using actual measurement results for calculating discharge amount by opening remain at the basic level. Therefore, in this study, a data processing technique using three-dimensional fixed ultrasonic flow meter measurement data was developed, the flow coefficient was calculated based on the measured data, and the applicability of the discharge amount calculation formula development was reviewed.

Physical Environment Changes in the Keum River Estuary Due to Dike Gate Operation: III. Tidal Modulation of Low-salinity Water (하구언 수문 작동으로 인한 금강 하구역의 물리적 환경변화: III. 저염수의 조석동조)

  • Choi, Hyun-Yong;Kwon, Hyo-Keun;Lee, Sang-Ho
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.6 no.3
    • /
    • pp.115-125
    • /
    • 2001
  • To examine the movement of the freshwater discharged artificially into the estuary during ebbing period in the Keum River dike we observed surface salinity variations in three stations along the estuary channel in May 1998 and July 1997 and surface temperature and salinity along the ferry-route between Kunsan and Changhang during eighteen days in July 1999. Based upon the typical features of observed salinity variation, we analyzed the excursion and decay processes of the discharged water. When freshwater is discharged, the low-salinity water forms strong salinity front over the entire estuary width, which basically moves forth and back by tidal modulation along the channel, producing the sudden change of surface salinity with the front passage. Salinity distribution along the channel, which is deduced from time variation of mean salinity over the estuary width, after one tidal period from gate operation suggests that diluted low-salinity water is trapped to the front and surface salinity increases gradually toward the upstream region. This frontal distribution of salinity is interpreted to be produced by the sudden gate operation supplying and stopping of freshwater within about two hours. Daily repeat of freshwater discharge produces separation (double front) or merge between decaying and new-generated fronts depending on dike-gate opening time, and the front decays with salinity increasing if the freshwater supply is stopped more than two days. In addition, the observed fluctuations and deviations in surface salinity variation is explained in terms of the differences of fronts intensity, their transition time and temporal salinity front running along the channel, which can be generated due to artificial gate-operation for the discharging time and water volume in the estuary dike.

  • PDF

River Flow Forecasting Model for the Youngsan Estuary Reservoir Operation(III) - Pronagation of Flood Wave by Sluice Gate Operations - (영산호 운영을 위한 홍수예보모형의 개발(III) -배수갑문 조절에 의한 홍수파의 전달-)

  • 박창언;박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.2
    • /
    • pp.13.2-20
    • /
    • 1995
  • An water balance model was formulated to simulate the change in water levels at the estuary reservoir from sluice gate releases and the inflow hydrographs, and an one-di- mensional flood routing model was formulated to simulate temporal and spatial varia- tions of flood hydrographs along the estuarine river. Flow rates through sluice gates were calibrated with data from the estuary dam, and the results were used for a water balance model, which did a good job in predicting the water level fluctuations. The flood routing model which used the results from two hydrologic models and the water balance model simulated hydrographs that were in close agreement with the observed data. The flood forecasting model was found to be applicable to real-time forecasting of water level fluc- tuations with reasonable accuracies.

  • PDF

A Two-dimensional Hydraulic Analysis Considering the Influence of River Inflow and Harbor Gate in the Bay (Harbor Gate와 유입하천의 영향을 고려한 만내의 2차원 수리해석)

  • Lee, Jae Joon;Lee, Hoo Sang;Shim, Jae Sol;Yoon, Jong Ju
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.1
    • /
    • pp.45-55
    • /
    • 2015
  • In this study, when seawall or harbor gate is installed for coastal disaster prevention, a two-dimensional water analysis in the bay is carried out to consider the flood amount of river inflow and effect of harbor gate. The Yeongsan river and the port Mokpo area are selcected for the study region. Then, by analyzing the hydraulic characteristics of flood flow of the Yeongsan river, we analysed the compatibility of the results in the two-dimensional hydrodynamic model. A tw-odimensional water analysis were conducted for the four cases considering whether a harbor gate is installed or not, and whether the inland water boundary condition is considered or not, also with open sea boundary condition. The results of the two-dimensional water analysis shows that water level change near the port Mokpo area is mainly caused by the discharge of the estuary barrage of the Yeongsan river because the harbor gate was installed. In addition, it is revealed that the volume of reservoir created by the harbor gate and the estuary barrage is too much small compared to the volume of the discharge from the Yeongsan river. Therefore, when the harbor gate is installed in the open sea, we concluded that a flexible management between the harbor gate and the estuary barrage of the Yeongsan river is required. A initial water level of the bay and outflow from the harbor gate are proposed for disaster prevention in the coastal area of port Mokpo.

Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields (간척지 논 침수 원인 조사와 방재 대책 수립)

  • Jeong, Ju-Hong;Yoon, Kwang-Sik;Choi, Soo-Myung;Yoon,, Suk-Gun;Go, Young-Bae;Kim, Young-Taek
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.105-114
    • /
    • 2010
  • Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

  • PDF

A Study on the Optimal Design of the Gate Leaf of a Dam (DAM 수문의 최적설계에 관한 사찰)

  • 최상훈;한응교;양인홍
    • Journal of Ocean Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.64-70
    • /
    • 1991
  • The design theory of roller gate has been systematized laying more emphasis on practical formulas than theoretical ones and the design procedure of the existing gate facilites is reviewed and analyaed on economical viewpoint and safety factor. The design theory of timoshenko, the thechnical standards for hydraulic gate and penstock of Japan, and the design standards for waterworks structures of Germany are applied to the study of optimal design of a gate leaf. In this study, gate leaf which is now being operated for water control at the seadike, estuary dam and reservoir dam are adopted as a mode, and a new design method by the computer is proposed through the variation of design elements within practical ranges. As a result, safety factor and economical design can be made by using T-beams to the horizontal and vertical beam of the gate leaf instead of H-beams used in the existing seadike roller gate at Asan, and total weight of gate leaf is reduced by the present optimization.

  • PDF

Simulation of Pollutants Transport using 2-D Advection-Dispersion Model near Intake Station (2차원 이송-확산모형을 이용한 취수장 인근에서의 오염물질의 혼합거동 모의)

  • Kim, Jae-Dong;Kim, Young-Do;Lyu, Si-Wan;Seo, Il-Won
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.791-794
    • /
    • 2008
  • The transport and dispersion of pollutants in natural river is a principal issue in intake station management. To study the pollutant transport in natural rivers, the effect of meandering and confluence of tributary on mixing process have to analyzed. The objective of this study is to simulate the mixing and transport of pollutants for operating water gate of Nakdong Estuary Barrage around the intake station. Mulgeum intake station being used as drinking water sources for Pusan. The flow around the intake station is influenced by operating water gate of Nakdong Estuary Barrage which is located downstream. The water gate system includes ten individual gates. The minor gate is usually opened according to elevation of the sea. When the river flow increases, the main water gate is opened. Daepo stream, tributary of the Nakdong river, is on opposite side of the intake station. The pollutants from Daepo stream often flows into the intake station acoording to the flow pattern. In this study, based on this simulation results, proper water gate operation which can minimize negative impact will be provided.

  • PDF

Planning of Extuary Reservoirs for the Development of Water Resources -A Comparative Study of Representation Cases of Korea and Japan- (유역이수의 고도화에 대응하는 하구담수호의 계획론 -한국.일본의 대표적 사례의 비교연구-)

  • 이희영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.1
    • /
    • pp.44-52
    • /
    • 1982
  • Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.

  • PDF

Physical Environment Changes in the Keum River Estuary by the Dyke Gate Operation: I. Mean Sea Level and Tide (하구언 수문작동으로 인한 금강 하구역의 물리적 환경변화: I. 평균해수면과 조석)

  • Kwon, Hyo-Keun;Lee, Sang-Ho
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.4 no.2
    • /
    • pp.93-100
    • /
    • 1999
  • Analyzing the tide data taken at Kunsan inner and Outer ports, non-tidal and mean sea level and harmonic constants of major constituents are investigated to examine the effects of the dyke gate operation on the sea level change in Keum River estuary. Non-tidal and annual mean sea levels decrease at Kunsan Inner and Outer ports after the dyke gate operation, especially showing an abrupt drop of non-tidal sea level at Kunsan Inner port. This non-tidal sea level drop results in the mean sea level gradient change between the inner and outer port, which can be mainly explained in terms of the decrease of river discharge from the dyke. Amplitudes of the $M_2$ and $S_2$ tides at the Inner port increase after the dyke gate operation, showing an abrupt jump, and phases of both tides slightly decrease. Amplitude and phase of the $K_1$ and $O_1$ tides show slight changes after the dyke gate operation. This significant change of semi diurnal tide amplitude is believed as a result of superposition of incident tidal wave and reflected tidal wave from the dyke.

  • PDF