Browse > Article
http://dx.doi.org/10.17663/JWR.2022.24.1.52

A Study on the Development of a method for estimating the amount of gate opening discharge in estuary using the three-dimensional fixed measurement of flow data for Integrated Nakdong-river estuary management  

Kang, Dukee (Hyunjin E&C)
Seo, Yongjae (Department of Civil Engineering, Pusan National University)
Lim, Kyoungmo (Urban Planning Bureau, Busan Metropolitan City)
Park, Byeong Woo (Department of Civil Engineering, Pusan National University)
Publication Information
Journal of Wetlands Research / v.24, no.1, 2022 , pp. 52-58 More about this Journal
Abstract
Recently, various efforts and research are being conducted to integrated management of the estuary in Nakdong River. As one of such studies, measurement of opening discharge amount for each floodgate using a three-dimensional fixed ultrasonic flow meter is being conducted, but studies on hydraulic and statistical processing procedures and techniques using actual measurement results for calculating discharge amount by opening remain at the basic level. Therefore, in this study, a data processing technique using three-dimensional fixed ultrasonic flow meter measurement data was developed, the flow coefficient was calculated based on the measured data, and the applicability of the discharge amount calculation formula development was reviewed.
Keywords
Integrated Estuary Management; Estuary Gate; Estuary Gate Discharge; ADCP;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Kim Tae-Woo, Yang Hyun-Soo, Park Byeong-Woo, Yoon Jong-Sung (2017) "An Analysis of Characteristics of Seasonal Variation in Salinity according to Effluent Flow in Nakdong River Estuary barrage ~ Changyeong.Haman Weir Section by using the Existing Observatory Network", Proceedings of the Conference of The Korean Society of Ocean Engineers, [Korean Literature]
2 Park Byeong-Woo(2017), "Integrated Water Management Plan for the Nakdong River Estuary", Proceedings of the Conference of The Asia International Water Week (AIWW), [English Literature]
3 Choi Sun-ho, Yoon Jong-seong, Huh Dong-soo (2016),"After the Four Rivers Project, Nakdong River Water System Weir-Estuary Bank Impact Analysis and Operational Improvement Plan Research Service Report",K-water, [Korean Literature]
4 Park Byeong-Woo(2017),"Integrated Water Management System for the Nakdong River Estuary" Master Plan, K-water, [Korean Literature]
5 K-water(2015),"Nakdong River Estuary Bank Operation and Management Manual",[Korean Literature]
6 K-water(1988),"Nakdong River Estuary Bank Construction Report", [Korean Literature]
7 Park Byeong-Woo(2018),"A Study on Investigation of Salinity Variation on the upper Hydraulic characteristics of Nakdong River Estuary Bank", Master's paper, Pusan National University, Pusan, Korea, [Korean Literature]
8 Kim Tae-Woo, Yang Hyen-Soo, Park Byeong-Woo, Yoon Jong-Sung(2017) "A Study on the Hydraulic Characteristics of DownStream Area by the Discharge at the Changnyeong-Haman Weir", Proceedings of the Conference of The Korean Society of Ocean Engineers, [Korean Literature]