Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields

간척지 논 침수 원인 조사와 방재 대책 수립

  • 정주홍 (전남대학교 지역바이오시스템공학과) ;
  • 윤광식 (전남대학교 지역바이오시스템공학과) ;
  • 최수명 (전남대학교 지역바이오시스템공학과) ;
  • 윤석군 (한국농어촌공사) ;
  • 고영배 (한국농어촌공사) ;
  • 김영택 (전남대학교 지역바이오시스템공학과)
  • Published : 2010.12.29

Abstract

Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

Keywords