• Title/Summary/Keyword: Estimating Work Time

Search Result 120, Processing Time 0.026 seconds

A Study on the Effective and Speedy container handing system(E&S) Effectiveness in railroad (철도 화물취급역 입환생략모델(E&S) 도입 효과에 관한 연구)

  • Kim, Ick-Hee;Yoon, Dong-Hee;Hong, Cheon-Hi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.505-510
    • /
    • 2011
  • The railroad freight transport has great merits that can transport mass and specific items(dangerous goods), but it takes a long time because of low accessibility to the logistics facility and the complex process of loading freight in middle station. This paper analyzed volumes and characters of each railroad freight item, and was carried out the effect of applying E&S system to Gyeongbu line containers to find the method of reducing transport time and effective container transportation. As a result of Cost-Effectiveness analysis, the block train(B/T) is reducing transport time more about 1~2 hours. The road congestion cost is saving about 2.2 billion won. And due to skipping work of organizing train, personnel and equipment expenses savings expected about 9 billion won. It is expected that the E&S system enhances the container transport service and has an effect positive influence on making a efficient method of transport. But It is necessary to estimate pre-feasibility of applying E&S system that the standard of estimating cost and benefit is required further examination.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

The Robust Estimation Method for Analyzing the Financial Time Series Data (재무 시계열 자료 분석을 위한 로버스트 추정방법)

  • Kim, S.
    • The Korean Journal of Applied Statistics
    • /
    • v.21 no.4
    • /
    • pp.561-569
    • /
    • 2008
  • In this paper, we propose the double robust estimators which are the solutions of the double robust estimating equations to analyze and treat the outliers in the stock market data in Korea including the IMF period. The feasibility study shows that the proposed estimators work quitely better than the least squares estimators and the conventional robust estimators.

Probabilistic seismic demand models and fragility estimates for reinforced concrete bridges with base isolation

  • Gardoni, Paolo;Trejo, David
    • Earthquakes and Structures
    • /
    • v.4 no.5
    • /
    • pp.527-555
    • /
    • 2013
  • This paper proposes probabilistic models for estimating the seismic demands on reinforced concrete (RC) bridges with base isolation. The models consider the shear and deformation demands on the bridge columns and the deformation demand on the isolation devices. An experimental design is used to generate a population of bridges based on the AASHTO LRFD Bridge Design Specifications (AASHTO 2007) and the Caltrans' Seismic Design Criteria (Caltrans 1999). Ground motion records are used for time history analysis of each bridge to develop probabilistic models that are practical and are able to account for the uncertainties and biases in the current, common deterministic model. As application of the developed probabilistic models, a simple method is provided to determine the fragility of bridges. This work facilitates the reliability-based design for this type of bridges and contributes to the transition from limit state design to performance-based design.

On-line Estimation of DNB Protection Limit via a Fuzzy Neural Network

  • Na, Man-Gyun
    • Nuclear Engineering and Technology
    • /
    • v.30 no.3
    • /
    • pp.222-234
    • /
    • 1998
  • The Westinghouse OT$\Delta$T DNB protection logic heavily restricts the operation region by applying the same logic for a full range of operating pressure in order to maintain its simplicity. In this work, a fuzzy neural network method is used to estimate the DNB protection limit using the measured average temperature and pressure of a reactor core. Fuzzy system parameters are optimized by a hybrid learning method. This algorithm uses a gradient descent algorithm to optimize the antecedent parameters and a least-squares algorithm to solve the consequent parameters. The proposed method is applied to Yonggwang 3&4 nuclear power plants and the proposed method has 5.99 percent larger thermal margin than the conventional OT$\Delta$T trip logic. This simple algorithm provides a good information for the nuclear power plant operation and diagnosis by estimating the DNB protection limit each time step.

  • PDF

A Study on Indirect Estimating Methods for Yearly Maximum Cooling Load (연 최대 냉방부하의 간접추정 방법론에 관한 연구)

  • Yang, Moon-Hee
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.16-26
    • /
    • 2003
  • In Korea, cooling power load, which occupies about 20% of peak load in 2000 and fluctuates depending on the popular usage of air conditioning systems, has been recently the focus of the load management. The first work of KEPCO (Korea Electric Power Corporation) to regulate cooling load as low as possible was to estimate its approximate scale and to develop the indirect methods to estimate it from the available time series data for the average hourly loads. However, KEPCO would like to have their methods improved both theoretically and practically. In this paper, we analyze their current indirect methods and detect their faults to design better indirect estimation methods. Under one of the assumptions of "no cooling load in April or May", the linear relationship between basic loads and GDP's, and the normalized seasonal factors of the Winters' multiplicative seasonal model, we provide ten indirect estimation methods in total and suggest the estimated cooling load(1988-1999) based on our various indirect methods.

RETARDED NONLINEAR INTEGRAL INEQUALITIES OF GRONWALL-BELLMAN-PACHPATTE TYPE AND THEIR APPLICATIONS

  • Abdul Shakoor;Mahvish Samar;Samad Wali;Muzammil Saleem
    • Honam Mathematical Journal
    • /
    • v.45 no.1
    • /
    • pp.54-70
    • /
    • 2023
  • In this article, we state and prove several new retarded nonlinear integral and integro-differential inequalities of Gronwall-Bellman-Pachpatte type. These inequalities generalize some former famous inequalities and can be used in examining the existence, uniqueness, boundedness, stability, asymptotic behaviour, quantitative and qualitative properties of solutions of nonlinear differential and integral equations. Applications are provided to demonstrate the strength of our inequalities in estimating the boundedness and global existence of the solution to initial value problem for nonlinear integro-differential equation and Volterra type retarded nonlinear equation. This research work will ensure to open the new opportunities for studying of nonlinear dynamic inequalities on time scale structure of varying nature.

Nonlinear viscous material model

  • Ivica Kozar;Ivana Ban;Ivan Zambon
    • Coupled systems mechanics
    • /
    • v.12 no.5
    • /
    • pp.419-428
    • /
    • 2023
  • We have developed a model for estimating the parameters of viscous materials from indirect tensile tests for asphalt. This is a simple Burger nonlinear rheological two-cell model or standard model. At the same time, we begin to develop a more versatile and complex multi-cell model. The simple model is validated using experimental load-displacement results from laboratory tests: The recorded displacements are used as input values and the measured force data are simulated with the model. The optimal model parameters are estimated using the Levenberg-Marquardt method and a very good agreement between the experimental results and the model calculations is shown. However, not all parts of the model are active in the loading phase of the experiment, so we extended the validation of the model to the simulation of the relaxation behaviour. In this stage, the other model parameters are activated and the simulation results are consistent with the literature. At this stage, we have estimated the parameters only for the two-cell uniaxial model, but further work will include results for the multi-cell model.

Comparative Analysis of Work Stress Assessment Tools for Estimating Human Work Performance (업무수행도 추정을 위한 직무스트레스 평가표의 비교 분석)

  • Jang, Tong-Il;Lee, Yong-Hee;Han, Kyu-Jeong;Lim, Hyeon-Kyo
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.144-150
    • /
    • 2014
  • A man is a component of a large system how complex it may be so that human performance which can influence on the system safety should be included in system safety assessment. Meanwhile, human performance can vary over time due to lots of factors. Among them, stress is an indirect factor that may cause human error which can result in industrial accidents. To assess stress level of human workers, not a few assessment tools have been developed. However, it can be questionable to utilize them for human performance anticipation because they were mainly developed with the viewpoint of mental health, though stress assessment can be also required in the safety aspect. Therefore, this study aimed to survey the possibility of their application with safety purpose. About 10 kinds of work stress tools were collected and analyzed with reference to assessment items, assessment and analysis methods, and follow-up measures. The results showed that most tools focused their weights on Demands, Supports, and Relationships, in sequence. However, they, except only one tool developed by the Japanese researchers, merely advised to set up counterplans in PDCA cycle or risk management activities. In consequence, application of stress assessment tools mainly developed for mental health seemed impractical for safety purpose with respect to human performance anticipation so that it was concluded that development of a new assessment tools aimed to human performance variation and accident prevention would be inevitable.