• Title/Summary/Keyword: Estimated Construction Cost

Search Result 307, Processing Time 0.026 seconds

A Feasibility Study on Construction of the Youth Complex Center (청소년수련과 건설사업 타당성분석)

  • No, Byeong-Ok;Song, Jin-U;Choe, Sang-Hyeon;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련관 건설사업 타당성분석)

  • 노병옥;송진우;최상현;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF

An Empirical Study on the Differential Ratio between Construction Cost for Land Development and Incurred Cost: Case of Housing Business District for Land Development in LH (택지조성원가와 발생원가의 오차에 관한 실증연구 : 택지개발사업지구를 중심으로)

  • Kim, Tae-Gyun;Chang, In-Seok;Lee, Duck-Bok;Kim, Ok-Yon
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.59-68
    • /
    • 2012
  • The current land development cost price system is classified as the creating land by construction price and composition changes that occur sporadically in the process of completion at the source of the factors by incurred cost price. Housing for land cost price system is a lack of objectivity which scheme of the such a gap due to the land in accordance construction and incurred cost price system so far. Therefore, in order to increase the objectivity of costing the costing of predictable surprises should be reflected in the process. Under such a background, this study defined the effective differential ratio as the predictable, estimated them for various characteristics of each business district to reflect. For this, set the properties category of five types to attributes and making the complex category and Look-up table. Which result of model validation is showed a high reliability. Therefore, Continuous accumulation of material in the future, when them to reflect the construction cost, will contribute to the bridge the gap the construction cost between incurred them.

The Comparison Analysis of Welding Techniques in Water Distribution Steel Pipes (상수도강관 용접접합의 방법별 비교분석)

  • Kim, Eung-Seok;Jeong, Won-Sik;Kim, Sung-Pyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2859-2865
    • /
    • 2011
  • The welded connection is known as an essential factor for establishing qualified construction and/or maintenance of wrapped steel pipe. In this study, welded connection conditions in the coated pipes with large diameter (over 700 mm) in Korea water distribution systems were estimated for suggesting technically and economically available welded connection method. For the study analysis, current steel pipe usage and accident cases were investigated. In addition, the characteristics of each welded connection method and automatic or manual connection techniques were also compared and estimated. As results, automatic welded connection method is superior than manual welded connection method in aspect of pure construction cost (average 9%) or pure welded connection cost (average 13.5%). When the poor welding-working situations in Korea are considered such as high tolerance of out-of-roundness in KS regulation, a number of lap joint welded connections, the real cost benefits of automatic welded connection should be much higher than those of manual welded connections.

A case histories on the detection of weak zone using electrical resistivity and EM surveys in planned tunnel construction site (터널 건설 예정지구에서의 전기비저항 탐사와 전자탐사의 적용을 통한 연약대 탐지에 대한 사례 연구)

  • 권형석;송윤호;이명종;정호준;오세영;김기석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.63-70
    • /
    • 2002
  • In tunnel construction, the information on the rock quality and the location of fault or fracture are crucial for economical design of support pattern and for safe construction of the tunnel. The grade of rock is commonly estimated through the observation with the naked eye of recovered cores in drilling or from physical parameters obtained by their laboratory test. Since drilling cost is quite expensive and terrains of planned sites for tunnel construction are rough in many cases, however, only limited information could be provided by core drilling Electrical resistivity and EM surveys may be a clue to get over this difficulty. Thus we have investigated electrical resistivity and EM field data providing regional Information of the rock Quality and delineating fault and fracture over a rough terrain. In this paper, we present some case histories using electrical resistivity and EM survey for the site investigation of tunnel construction. Through electrical resistivity and EM survey, the range and depth of coal seam was clearly estimated, cavities were detected in limestone area, and weak zones such as joint, fault and fracture have been delineated.

  • PDF

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

Feasibility Study on Retrofitting Lighting and Heat Source Equipments in Office Buildings (사무소건물 조명기기와 열원기기의 고효율기기로의 교체에 관한 경제성 검토)

  • Lee, Chul-goo;Kim, Jong-dae;Im, Tae-soon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.12 no.2
    • /
    • pp.13-18
    • /
    • 2016
  • Energy saving has been main concern, thus government supporting policies which are based on Fundamentals of Low-carbon Green Growth Act', 'Green Building Support Act, have been prepared in Korea. The objective of this study is to estimate energy conservation effectiveness and economic advantage assuming that lighting equipments and heat source equipments would be retrofitted. Office building, which has total floor area of $30,000m^2$, was a subject of this study. From the estimations, electric rate will be decreased by 62,886,000 won per year due to lighting equipments retrofit, and gas rate will be decreased 11,141,000 won or 17,332,000 won per year due to heat source equipments retrofit (in case of COP 1.2 or 1.5). Payback period of each case that are calculated by energy saving cost and retrofit cost are estimated 27.9 year, 38.6 year and 29.2 year, thus economic supporting policies is necessary for effective energy saving in buildings. Meanwhile payback period of heat source equipment for new building is estimated 6.1 year and 8.3 year.

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work (관 부설 및 접합공사 공사비산정기준 개선에 관한 연구)

  • Oh, Jae-Hoon;Ahn, Bang-Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.675-684
    • /
    • 2020
  • To prevent safety accidents caused by aging pipe infrastructure and to maintain water quality, construction projects for water and sewage pipes are actively conducted across Korea. This study analyzed the criteria situations, site survey details, and regulation revisions related to the calculation of construction cost standards for pipe laying and joining work. The analysis showed that the major causes for revision are the unclear construction scope, limitations in implementing some pipe materials due to installation facility types, workforce focused on ordinary labor, limitations of manual laying work, and the lack of tool hire cost and machine expense-calculation criteria. Field studies were conducted to categorize the pipes according to their features, in addition to identifying the use of lifting heavy equipment and light equipment. In addition, excavation and testing work conducted in connection to pipe laying, as well as the use of skilled labor, were investigated. The current study clarified the work scope through new common items, provides an organization based on the pipe material, adjusted the workforce ratio to focus more on skilled labor, and developed grounds for calculating machine expenses. These revisions were estimated to save approximately 1.28% of the construction costs in each project according to an analysis of the construction cost impact study. truction costs in each project, according to an analysis of construction cost impact study.

Estimation of the Project Cost for a Coal-fired Power Plant using Stochastic Simulation (확률적 모의실험법을 이용한 석탄화력발전소의 건설사업비 추정)

  • Han, Hyoung-Gi;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.4
    • /
    • pp.45-54
    • /
    • 2012
  • Estimated project cost and executed sensitivity analysis for domestic 500 MW coal-fired power plants with monte carlo simulation. As a result of research, the basis of constant price in December, 2011 and 95% level of confidence, the project cost in case of not having adjacent power plant was 1,870 billion won to 2,330 billion won and the project cost in case of having adjacent power plant was 1,240 billion won to 1,590 billion won. In case of not having adjacent power plant is sensitive to civil construction cost but the other case is sensitive to material cost.

  • PDF